Laserfiche WebLink
COUNTY OF SAN JOAQUIN DW EP No: DW-06150NE <br /> C cp DEPARTMENT OF PUBLIC WORKS Date Issued: /8/2006 <br /> Za P.O.BOX 1810-1810 E.HAZELTON AVENUE Expiration Date: 16/7/2007 <br /> 4D STOCKTON,CALIFORNIA 95201 <br /> • ( Job No: 111005 <br /> 209)468-3000 <br /> P FAX#(209)468-9324 APN No: 019-340-18 <br /> JFM OR <br /> DRIVEWAY ENCROACHMENT PERMIT CR# 029249 <br /> To: JAMES STOUT Location: S/S STAMPEDE RD.APPROX.900'W/O <br /> ICLEMENTS RD. <br /> 1812 BLACKBIRD PLACE <br /> I <br /> LODI,CA.95240 <br /> In compliance with your request of 5/26/2006 nd subject to all the terms, conditions and <br /> restrictions written below or printed as general or special provisions on any part of this form. <br /> Permission is hereby granted to constuct NE DRIVEWAY APPROACH Ishown on <br /> Permit Application No. DW-06 150NE i. <br /> Jobsite shall be kept in a safe condition at all times by removing daily any excess dirt or debris which might be a hazard <br /> to pedestrian and/or vehicular traffic. Adequate lights, signs and barricades shall be placed and maintained by the <br /> Permittee for the protection of the public in accordance with the current Caltrans Standard Specifications. <br /> A(n) oixTEEN hch ( 16 ,') inside diameter per section 62 of the current Caltrans Standard <br /> Specifications, ALTERNATIVE PIPE AND PIPE ARCH CULVERTS, shall be installed in roadside drainage ditch for <br /> drainage flow maintenance and shall be of sufficient length to clear toe of approach fill or headwalls. <br /> The entire area of driveway approach(es), include flares for turning and/or paved frontage(s), from the edge of roadway <br /> pavement to right-of-way front roperty) line shall be surfaced with a two inch (2") minimum of asphalt concrete over <br /> a FOURinim�4�lpacted layer of three-quarter inch (3/4") maximum size aggregate <br /> base material (road gravel)conforming to Class 2 Aggregate Base specified in Section 26 of the current Caltrans <br /> Standard Specification, or with a four inch (4") minimum of portland cement concrete. <br /> If portland cement concrete pavement is installed, expansion joints shall be provided at the edge of pavement and <br /> along property line. Surface grades of approach(es)and/or to open ends of pipe. No ponding nor puddles on <br /> pavement surface shall be allowed. <br /> The Field Engineering Division of this office shall receive no less than forty-eight(48) hours notice prior to <br /> beginning of any work within the County right-of-way. After completion of the work permitted herein, all <br /> debris, lumber, barricades or any excess material shall be removed and the jobsite left in a neat workmanlike <br /> condition. The Permittee shall fill out and mail notice of completion provided by Grantor. <br /> Driveway(s) shall be complete prior to occupancy <br /> of the residence, but not to exceed expiration date. <br /> THOMAS R. FLINN, Director <br /> WHITE -Permittee Department of Public Works <br /> GOLDENROD -PWD Central File <br /> YELLOW -Field Inspection <br /> PINK -Permit Section <br /> By <br /> FORMS: RAT SS/WW Per section <br /> Access\Permits\Forms\Driveway E Permit Revised 07/2000 <br />