Laserfiche WebLink
COUNTY OF SAN JOAQUIN DW EP No: [w-os 203SE <br /> IIICR# <br /> DEPARTMENT OF PUBLIC WORKS Date Issued: 18/1/2006P.O.BOX 1810-1810 E.HAZELTON AVENUE Expiration Date: ,7/31/2007STOCKTON,CALIFORNIA 95201Job No: X11005(209)468-3000 FAX#(209)468-9324 APN No: ;207-290-49 <br /> ,029843 <br /> DRIVEWAY ENCROACHMENT PERMIT -- <br /> To: (MICHAEL&MAR(ROSSINI Location: E/S HENRY RD.APPROX.700'S/O GROOMS <br /> RD. <br /> '14440 S. HENRY RD. <br /> OAKDALE,CA.95361 <br /> i <br /> In compliance with your request of 7/21/2006 Ind subject to all the terms, conditions and <br /> restrictions written below or printed as general or special provisions on any part of this form. <br /> Permission is hereby granted to constuct 'ONE DRIVEWAY APPROACH shown on <br /> Permit Application No. DW-06 203 SE. <br /> Jobsite shall be kept in a safe condition at all times by removing daily any excess dirt or debris which might be a hazard <br /> to pedestrian and/or vehicular traffic. Adequate lights, signs and barricades shall be placed and maintained by the <br /> Permittee for the protection of the public in accordance with the current Caltrans Standard Specifications. <br /> A(n) IsEE sT;aMP _�Ch ( SEE STAMP ') inside diameter per section 62 of the current Caltrans Standard <br /> Specifications,ALTERNATIVE PIPE AND PIPE ARCH CULVERTS, shall be installed in roadside drainage ditch for <br /> drainage flow maintenance and shall be of sufficient length to clear toe of approach fill or headwalls. <br /> The entire area of driveway approach(es), include flares for turning and/or paved frontage(s), from the edge of roadway <br /> pavement to right-of-way frontproperty) line shall be surfaced with a two inch (2") minimum of asphalt concrete over <br /> a FouR minirn(7 pacted layer of three-quarter inch (3/4") maximum size aggregate <br /> base material (road gravel)conforming to Class 2 Aggregate Base specified in Section 26 of the current Caltrans <br /> Standard Specification, or with a four inch (4") minimum of Portland cement concrete. <br /> If Portland cement concrete pavement is installed, expansion joints shall be provided at the edge of pavement and <br /> along property line. Surface grades of approach(es)and/or to open ends of pipe. No ponding nor puddles on <br /> pavement surface shall be allowed. <br /> The Field Engineering Division of this office shall receive no less than forty-eight(48) hours notice prior to <br /> beginning of any work within the County right-of-way. After completion of the work permitted herein,all <br /> debris, lumber, barricades or any excess material shall be removed and the jobsite left in a neat workmanlike <br /> condition. The Permittee shall fill out and mail notice of completion provided by Grantor. <br /> Driveway(s) shall be complete prior to occupancy <br /> of the residence, but not to exceed expiration date. THOMAS R. FLINN, Director <br /> Department of Public Works <br /> WHITE -Permittee <br /> GOLDENROD -PWD Central File <br /> YELLOW Field Inspection <br /> PINK Permit Section <br /> Permit section <br /> FORMS: R-17, SSNM <br /> Revised 07/2000 <br /> Access\Permits\Forms\Driveway E Permit — --- <br />