Laserfiche WebLink
COUNTY OF SAN JOAQUIN DW EP No: �w os 25�NE <br /> DEPARTMENT OF PUBLIC WORKS Date Issued: 11/7/2006 <br /> P.O.BOX 1810-1810 E.HAZELTON AVENUE Expiration Date: 11/612007 <br /> STOCKTON,CALIFORNIA 95201 Job No: 11005 — - <br /> (209)468-3000 APN No: 063_250-22 _ <br /> FAX#(209)468-9324 CR# 1030814 <br /> %lk DRIVEWAY ENCROACHMENT PERMIT <br /> Location: 123 5 E.HA5 MILES LANE-0 HWY 88RNEY LANE <br /> To: !DOUGLASDAY _ - <br /> ----------------- <br /> 12 538538 E.HARNEY LANE — <br /> LODI,CA.95240 -- <br /> d subject to all the terms, conditions and <br /> In compliance with your request of - _ 11/7/2006 <br /> In <br /> restrictions written below or printed as general or special provisions on any part of this form._ shown on <br /> DRIVEWAY APPROACH WITH PIPE <br /> Permission is hereby granted to constuct <br /> —ONE <br /> Application No.iDW-06 _T 255 NE . <br /> Permit App' �--- ----- <br /> xcess dirt or debris <br /> ch <br /> ht be a <br /> bsite <br /> toped <br /> shall be kept in a safe condition at all times by removing dbail`any <br /> shall be pia ed and ml a n ained by the hazard <br /> to pedestrian and/or vehicular traffic:. Adequate lights, signs a <br /> Permittee for the protection of the public in accordance with the current Caltrans Standard he currentCaltransStandard <br /> ---— - _ ch 15 ") inside diameter per sectio <br /> A(n) FIFTEEN _ <br /> S cifications, ALTERNATIVE PIPE AND PIPE ARCH n CULVERTS, <br /> to clear of approach <br /> installed <br /> or headwallsin roadside . <br /> drainage <br /> or <br /> Pe <br /> drainage flow maintenance and shall be of sufficient length from the edge of roadway <br /> The entire area of driveway approach(es), include flares for turning and/or paved frminimu(m of asphalt concrete over <br /> front roe line4shall be surfa cer of three quarter inch (314") maximum size aggregate <br /> pavement to right-of-way ( 1_P ni - 4 y <br /> a F u _minima p <br /> nforming to Class 2 Aggregate Base specified in Section 26 of the current Caltrans <br /> base material (road gravel)co <br /> Standard Specification, or with a four inch (4") minimum of Portland cement concrete. <br /> Portland cement concrete pavement is installed, expansion o onts shalle <br /> nt <br /> If pon ends of pipebe . No ponding ned at the g norpuddlespuddleseon <br /> along property line. Surface grades of app and <br /> roach(es) and/or p <br /> pavement surface shall be allowed. 48 hours notice prior to <br /> n ri ht-of--way. After completion of the work permitted herein, all <br /> The Field Engineering Division ofthis Cou officg shall receive no less than forty-eight( in a neat workmanlike <br /> beginning of any work within the h/ obslte left <br /> debris,lumber, barricades or any excess material shall be removed an ov provided by <br /> Grantor. <br /> condition. The Permittee shall fill out and mail notice of completion p <br /> Driveway(s) shall be complete prior to occupancy <br /> of the residence, but not to exceed expiration date. THOMAS R. FLINN, Director <br /> Department of Public Works <br /> WHITE -Permittee <br /> GOLDENROD -PWD Central File <br /> YELLOW -Field Inspection <br /> PINK -Permit Section <br /> By <br /> Per section <br /> FORMS: R-17, SSNVW <br /> Revised 07/2000 <br /> Access\Permits\Forms\Driveway-E-Permit -- __ <br />