Laserfiche WebLink
February 14,2006 <br /> PROJECT NAME: MOUNTAIN HOUSE PARKWAY <br /> Application No.: <br /> Job No.: 11005 <br /> Final Engineer's Estimate: <br /> Final Engineer's Estimate for Phase II (if applicable): $258,834.00 <br /> ---------- <br /> Total Engineer's Estimate -------------------------- <br /> $258,834.00 <br /> Plan Check Fee: <br /> 7.22 %of$50,000.00 <br /> 4.20 %of$250,000.00 $3,610.00 <br /> 1.95 %of ( $258,834.00 -$300,00o.00) $8,771M <br /> -------------------------- <br /> Subtotal <br /> $12,381-03 <br /> Field Inspection Fee: <br /> 8.86 %of $ 200,000.00 <br /> 3.85 %of $ 300,000.00 $17,720.00 <br /> 2.75 % of $258,834.00 -$500,000.00) $2,265.11 <br /> 2.25 %of ( -- -$1,000,000.00) <br /> Subtotal ----------$19985.11 <br /> TOTAL FEES: $12,381.03 + <br /> $19,985.11 = $32,366.14 <br /> Fees paid to date: <br /> Date: Check No.: <br /> Date: Check No.: <br /> Total $0.00 <br /> Balance Due: <br /> $32,366.14 - $0.00 = <br /> $32,386.14 <br /> Post-It"brand fax transmittal memo 7671 a o}pages ► <br /> $ fSAUT Fro'"sC� <br /> Co. <br /> Co. <br /> Dept. Phone N <br /> 2a9 -3oS8 <br /> Fax ly`o9 x'83-Z3 76- Fax a <br /> cAformslsubdlSubd Plan Check-Field Insp Fees 2/14/2006 <br /> (S. Hant) <br />