My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2006_EP-06-0301 thru EP-06-0350_ - EP-06-317
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2006
>
EP-06-0301 thru EP-06-0350
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2006_EP-06-0301 thru EP-06-0350_ - EP-06-317
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 10:36:56 AM
Creation date
1/23/2016 5:29:06 AM
Metadata
Fields
Template:
Permits_Development
DocName
EP-06-317
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2006\EP-06-0301 thru EP-06-0350
Year2
2006
Address
E/S S. ADELBERT AVE. APPROX. 80' N/O
Supplemental fields
APN
Applicant
PG & E
City
Cross Ref
DocCategory
Permits
Type (2)
Tags
Permits_Development
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
September 14, 2006 <br /> MEMORANDUM <br /> TO: Tom Gau, Chief Deputy Director <br /> Development Services <br /> FROM: Michael Callahan, Senior Civil Engineer <br /> Public Services <br /> SUBJECT: RON GIBBS (P.G.&E.) REQUEST FOR A WAIVER OF THE <br /> TRENCHING POLICY. <br /> This memo is regarding a request from Ron Gibbs for a waiver of the San Joaquin <br /> County Department of Public Works trenching policy. Mr. Gibbs is planning to tap into <br /> an existing gas line using bellhole and bore method to provide service to a new home site <br /> at 120 Adelbert Avenue. As the street was recently resurfaced, our policy does not allow <br /> for pavement cuts. In order to mitigate for the bellhole, he will surface plane one and a <br /> half inches thick by twelve feet wide by twenty feet long and place asphalt concrete with <br /> emulsion binder on the prepared area as shown on the attached sketch. <br /> My recommendation is to allow the applicant to tap into the gas line as stated above <br /> based on the proposed mitigation to conform to the rest of the road. Any disturbed <br /> striping will also be replaced as it was before the work was performed. Pete Martin from <br /> Design Engineering and David Mendoza from Field Engineering, have reviewed and are <br /> concur with the work that is planned to be performed on Adelbert Avenue. <br /> Approved by: <br />
The URL can be used to link to this page
Your browser does not support the video tag.