My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2006_EP-06-0301 thru EP-06-0350_ - EP-06-320
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2006
>
EP-06-0301 thru EP-06-0350
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2006_EP-06-0301 thru EP-06-0350_ - EP-06-320
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 10:37:01 AM
Creation date
1/23/2016 5:29:34 AM
Metadata
Fields
Template:
Permits_Development
DocName
EP-06-320
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2006\EP-06-0301 thru EP-06-0350
Year2
2006
Address
SACRAMENTO BLVD. OAK ST LOUSIA AVE.
Supplemental fields
APN
Applicant
OUR LADY OF FATIMA SOCIETY
City
Cross Ref
DocCategory
Permits
Type (2)
Tags
Permits_Development
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Our Lady of Fatima Society of Thornton <br /> Laura Pereira Home Phone/Fax 209-745-1096 <br /> Secretary <br /> 900 Jordine Way <br /> Galt, Ca 95632 <br /> September 10,2006 <br /> Dept. of Public Works <br /> PO Box 1810 <br /> Stockton, Ca 95201 <br /> The Our Lady of Fatima Society of Thornton, Ca. would like to request a permit for a <br /> parade to be held in Thornton on October 14 and 15, 2006. <br /> On Saturday,October 14,2006 there will be two parades. The first parade will take place <br /> at approximately 10:00 AM. We would like to have Sacramento Blvd. closed from 9:00 <br /> AM to 2:00 PM from Pine St. to 350 feet north. The parade will proceed as follows: <br /> Sacramento Blvd.to Oak St., Oak St, to Louisa Ave.,Louisa Ave. to Stockton St., <br /> Stockton St. to Thornton Rd., Thornton Rd. to Sacramento Blvd. and back to the church <br /> grounds. <br /> Saturday night if weather permits we will be having the church mass outside and we <br /> would like to have Sacramento Blvd. closed from 6 PM to 10 PM from Pine St. to 350 <br /> feet north. The second parade will be the Candlelight Parade leaving the Catholic Church <br /> at approximately 7:30 PM. The parade will proceed as follows: <br /> Sacramento Blvd. to Oak St., Oak St.,to Louisa Ave., Louisa Ave. to Stockton <br /> St., Stockton St.,to Thornton Rd., Thornton Rd.to Sacramento Blvd. and back to the <br /> church grounds. <br /> Sunday, October, 15,2006,again if weather permits, we would like to have the church. <br /> mass outside and Sacramento Blvd. closed from 9:00 AM to 2:00 PM from Pine St.to <br /> 350 feet north. At approximately 12:00 PM the parade will proceed as follows: <br /> Sacramento Blvd. to Pine St.,Pine St. to Thornton Rd., Thornton Rd.to <br /> Mokelumne Ave., Mokelumne Ave., to Thornton Rd., Thornton Rd. to Sacramento Blvd. <br /> and back to the church grounds. We expect approximately 6,000 people to attend this <br /> Pie. <br /> Your consideration of this request will be greatly appreciated. <br /> Sincerely, <br /> Our Lady of Fatima Society of <br /> Thornton, Ca. Inc. <br /> 6kral eira, ecretar <br /> PLEASE NOTE: VM WIU t1TF'FD LOTS OF BARRICADES <br /> r <br />
The URL can be used to link to this page
Your browser does not support the video tag.