Laserfiche WebLink
Preston Pipelines <br /> General Engineering Contractor <br /> September 28, 2006 <br /> Devcon <br /> 690 Gibraltar Drive <br /> Milpitas, CA 95035 <br /> Att: Dave Trudell <br /> Project: PPI Office Building: 12833 S. Manthey Rd., Lathrop, CA 95330 <br /> PPI Job#06-998 <br /> Subject: Joint Trench Traffic Plan <br /> Dear Dave: <br /> Please find attached our proposed traffic control plan for the joint trench work to be <br /> completed for the above referenced project. This work will consist of excavating a 24"wide <br /> by 42"deep trench from the north edge of pavement at Klo Rd. continuing approximately <br /> 900' south along S. Manthey Rd. and ending at the southern entrance at 12833 S. Manthey <br /> Rd. Utilities to be installed will include but are not limited to telephone, CATV, elect. <br /> secondary and gas. Excavation will be approximately 1' from the west edge of pavement on <br /> S. Manthey Rd. Work is scheduled to commence on October 6, 2006 for a duration of <br /> approximately 30 days with working hours from 7:00 AM to 5:00 PM. <br /> Please feel free to call with any further questions. <br /> Sincerely, <br /> Nick Njirich <br /> Project Manager <br /> nnjirich@prestonpipelines.com <br /> Cell: (209)649-4242 <br /> Central Valley Office Corporate Office Sacramento Office <br /> 12833 S.Manthey Road 133 Bothelo Avenue 8455 24m Avenue <br /> Lathrop,CA 95330 Milpitas,CA 95035 Sacramento,CA 95826 <br /> (209)983-6500 (408)262-1418 <br /> (209)983-6508 Fax (408)262-1870 Fax (916) F <br /> (916)3866-7531-7531 Fax <br /> Lic.No.367660 <br /> www.prestonpipelines.com <br /> C:\Documents and Settingslnnjirich\Desktop\09-28-06 PPI Building Traffic Plan.doc <br />