Laserfiche WebLink
Urrik,t UJC UNIT <br /> PROJECT APPLICATION <br /> FEE SCHEDULE . <br /> GEOPHYSICAL SURVEY $255 <br /> Agreement Annuals <br /> $115 or (Mpor <br /> ENCROACHMENT PERMIT Time and Material Time and Material <br /> Driveway with or without pipe $95 <br /> Driveway with Box Culvert $155 <br /> Paved Frontage $100+$0.46/ft: <br /> Curb,Gutter,and/or Sidewalk $100+$0.98/ft. <br /> Bell Holes,Cross-cuts,Splicepits $100/location 6 /'90 2 20d <br /> Bore(up to 6'Dia:) $100/location <br /> Bore(over 6" Dia.) $100'+$19/in. <br /> DIRT: <br /> 0-100 ft. $100+$0.49/ft. <br /> >100-1,000-ft:.: +$0.30/ft. <br /> >1,000 ft. - +$0.10/ft. <br /> PAVED: <br /> 0-100 ft. $100.00+$0.69/ft. <br /> >100-1,000 ft. +$0.40/ft. <br /> >1,000 ft. +$0.20/ft. <br /> Single Trip $20 <br /> Blanket Permit $90 <br /> Actual Cost <br /> Custom ($160.00 MIN) <br /> TOTAL 3✓S. <br /> 1� <br />