My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2011_PS-1100001 thru PS-1100500_ - PS-1100013
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2011
>
PS-1100001 thru PS-1100500
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2011_PS-1100001 thru PS-1100500_ - PS-1100013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 3:49:59 PM
Creation date
1/23/2016 4:45:09 AM
Metadata
Fields
Template:
Permits_Development
DocName
PS-1100013
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2011\PS-1100001 thru PS-1100500
Year2
2011
Application
PS-1100013
Supplemental fields
APN
Applicant
mary sanchez
City
Cross Ref
DocCategory
Permits
Type (2)
Encroachment Permit
Tags
Permits_Development
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
TRAFFIC SAFETY PLAN <br /> INSTALLATION OF SOIL GAS WELLS <br /> Shoulder Mission Road <br /> Using an equipment truck and jack hammer, cut and break out asphalt prior to hand auger <br /> installation of soil gas wells to the 6 foot depth along the western shoulder of Mission Road. <br /> Delineating cones will be used to cordon off the work area. See figures 1, 2, 6 and 7, included. <br /> The advance warning sign will be positioned 200 feet prior to the intersection of Mission Road <br /> and Country Club Blvd., along the western shoulder south bound lane of Mission Road. The <br /> Taper will commence at the southwest corner of the intersection of Mission Road and Country <br /> Club Blvd. The taper will consist of delineators spaced at 5 foot offset and will be 15 feet long. <br /> A buffer zone will consist of a work truck inside of delineators at 10 feet prior to work zone. <br /> Delineators will be positioned between the work zone (work truck) and traffic. An End of <br /> Road Work sign will be positioned 15 feet past the work zone. <br /> 8SANCHEZ DRILLING-HEALTH/SAFETY <br />
The URL can be used to link to this page
Your browser does not support the video tag.