My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2011_PS-1100001 thru PS-1100500_ - PS-1100020
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2011
>
PS-1100001 thru PS-1100500
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2011_PS-1100001 thru PS-1100500_ - PS-1100020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 3:50:02 PM
Creation date
1/23/2016 4:44:01 AM
Metadata
Fields
Template:
Permits_Development
DocName
PS-1100020
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2011\PS-1100001 thru PS-1100500
Year2
2011
Application
PS-1100020
Supplemental fields
APN
Applicant
Eric Slupianek
City
Cross Ref
DocCategory
Permits
Type (2)
Encroachment Permit
Tags
Permits_Development
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SYRON. <br /> R <br /> "Providing solutions to difficult projects since 2955" <br /> lanuary 3,201 <br /> William Lawsor. <br /> San Joaquin County Public Works <br /> 1810 East Hazelt=Avenue <br /> Stockton.,CA.95201 <br /> Subject:Banta Carboua Irrigation Distxict–Bird Road Encroachment Permit <br /> Dear William Lawson: <br /> This letter is to confirm the construction ofBauta Caxbona Irrigation Distact main Lift Canal Pump Station.During the initial <br /> construction of this project approxiinat.&Iy 8000 cubic yard&of dirt material will be required to be transported from,the primp station <br /> location,located on the west side of Bird Road;to a spoil pile along the irrigation canal,located on the cast side of Bird Road.The <br /> materia will be transported using DoT approved 10-wheel dump trucks.The material moving process will take approximately eight <br /> days to complete.Before transportation of the material,Syblon Reid will construct eonstructim entrances in accorda=with the State <br /> Water Resources Control Board standard.Cal Trams Class T[Base rack atilt be placed on the haul roads to limit the amount of material <br /> that could be tracked out onto Bird Road.At the end of each shift Bird Road will be brushed off and all visible material will removed <br /> from the road. <br /> Respectfzr'sly, <br /> a <br /> Eric Slupi=elc <br /> Syblon Reid <br /> Project Engineer <br /> 1130 Qcagy Qtze Ptd.Sox�C10— Folsam,Cli rtdia + 95-78-0100 016)351-0957 (916)331-1674 Fax <br /> CaLIFORNMk LIC7-NSE 10. 739610 www.SRCO-Cant <br />
The URL can be used to link to this page
Your browser does not support the video tag.