Laserfiche WebLink
- - - J, <br /> -�' State Water Resources Control Board <br /> Division of Water Quality <br /> 1001 C Street-Sacranento,California 95814.886-563-3107 <br /> Mailing Address;P.C.Sax 1977•Sacramento,California•95812-1977 •e9g@r <br /> Linda S.Adams FAX(516;1341-5543-http:fhomv.waterboards.ca.govANWer issueslprogramststormwater/ Arnold SGo o- <br /> ry <br /> rvironmental r'rofeC.ior, <br /> EROSIVITY WAIVER CERTIFICATION <br /> For exclusion from the Storm Water Construction General Permit <br /> for small construction activity(between 1 and 5 acres of soil disturbance) <br /> Site information: <br /> Banta Carbona Irrigation District Pump Wet Well Construction <br /> David Weisenberger David Weisenberger <br /> 3514 W Lehman Road BCID Main Lift Canal 600 feet west of gird Roz <br /> Tracy CA 95304 Tracy CA 95304 <br /> Waiver Approved: December 13,2010 <br /> WDID Number: 5S:39W000151 <br /> Waiver valid through: Ailed 01; 2311 <br /> The State Water Resources Control Board (State Water Board) issues this Erosivity Waiver Certification <br /> itiWaiver),to the Legally Responsible Person. (LRP)who certified that coverage under the Storm Water <br /> Construction General Permit(0GP) is not required for the projectisite location described above. The LRP <br /> certified the Waiver is valid because construction activity will take place during a period when the value of <br /> the rainfall erosivity-factor(R)is less than five.This Waiver only applies to the projecUsite location <br /> described above. <br /> .Approval of this Waiver does not relieve the LRP of permitting requirements for other regulated <br /> constriction activities/discharges. Construction activity covered under this Waiver must still comply with <br /> any applicable State regulations and/or local storm water requirements and ordinances. Appropriate <br /> erosion and sediment control best management practices must be implemented to prevent violations of <br /> an Ler quali y standards. <br /> n accordance with the Erosivity Waiver requirements set forth in Section ll(B)(7)of the CGP,construction <br /> activity must begin and reach final stabilization within the time period submitted to the State Water Board, <br /> Construction Start: December 27,2010 Construction Encs: April 01,2011 <br /> If construction activity extends beyond the certified Construction End,date for any reason,the rainfall <br /> erosivity R factor mus'be recalculated in SMARTS using the original Construction Start date and a new <br /> Projected endu(rg date. Tlie R factor must be recalculated 30 days prior to April 01,2C11 <br /> I;, upon reoalculatior,the R factor remains equal to or less than 5,the LRP must save the information in <br /> SMARTS and recer ify the new Constr-uc'ton. End date; or <br /> if the R factor is over 5;tr;e L Rig must submit Permit Registration Documents(PRDs)as specified by the <br /> Store;Water CGP before the end of he certified waiver period to obtain permit coverage. The <br /> recalculation must occi:r:30 days prior to April 01,2011 and PRDs must be submitted <br /> rl <br /> y Apr;i n1, 2011 <br /> Fail,re to s 'emit PRDs as i-equire:d or to discharge without a permit may subject you to penalties.You <br /> may become liable to pay up to$10,000 a day pursuant to California Water Code Section 13385 and$10 <br /> per galion per day far any amount over 1,000 gallons not cleaned up- .You may be assessed an <br /> add.Tonal penalty of a Minimum of$",OCC pursuant to Sections 13399.25-3399.43 for each violation.The <br /> matter may be referred to the Attorney General or District Attorney for other civil and/or criminal liabilities <br /> (Sectio- 13385). <br /> i°yo::have any questions please contact t=ie Storm.Water I reip Desk at stormwater,6v,atbrboarcis-ca.00v <br /> or 1-856-563-3107. <br /> ,California Environmental Protection Agency <br /> fro Recycled Pawr <br />