My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
A424 - A427
PublicWorks
>
VAULT MAPS
>
Large Plans - LP
>
Drawer A
>
A415 thru A482
>
A424 - A427
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/14/2023 10:20:20 AM
Creation date
1/22/2016 10:22:38 AM
Metadata
Fields
Template:
Large Plans - LP
Project
Project Plans for Airport Way and Roth Road Traffic Signal
Year
1992
Project Engineer
Karen Kaiser
Roads Worked
Airport Wy., Roth Rd.
Red Lines
No
Supplemental fields
Cross Ref
A424 - A427
DocCategory
Improvement Plans
Type
Traffic Signal
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Show annotations
View images
View plain text
.x <br /> W W I I, <br /> 60 "1 <br /> CLEANING EXISTING ASPHALT CONCRETE DIKE <br /> 16' ; / DRAINAGE FACILITY (Type A — Hi h Dike <br /> I A A g <br /> I / 2 <br /> I 4 <br /> Z � I Location Quantity Location Quantity <br /> J n 9.5' <br /> a.. <br /> I0 / Roth Road x-drain Lump Sum NW corner intersection 110 L.F. <br /> Clean, repair and extend existing <br /> I Ix 1270 C.S.P. (0.079" thick) 12 L.F. SW corner intersection 80 L.F. <br /> ,; Connect according to Coupling East side of Airport Way 125 L.F. <br /> I ,4c Band Details S.P. and D978-1 ASPHALT CONCRETE Total 315 L.F. <br /> Install 80 L.F. Type A - (High Dike) O D97B-2, D97C-1 , and D97C-2. <br /> - -- --�"-I "- "" EP Install 110 L.F. Type A - (High Dike) MISCELLANEOUS AREAS (Type 1 ) <br /> R/W ,,,� ° R/W � Location Quantity 12" 0 CORRUGATED STEEL PIPE <br /> -...._.-.. __. ._._.T ._.._....._-... ----.....--.....-._...-.....-----...." _ _.. T --...--- -- - -._......_._.._....._. _ ._... _... ..... . _..._..._._......._.._._..._. .__...__.......- .......... --..-.._._...._............_...._...__.......__... Roth Road a t C o n t ro I I e r Cabinet Lump Sum (0 . 079 thick) <br /> Existing E.P. Existing E.P. — <br /> I Conform o Location Quantity <br /> �) zo Section N Corner ASPHALT CONCRETE NW corner intersection 12 L.F. <br /> MISCELLANEOUS AREAS (Type 2) <br /> II CL Const. Airport Way J <br /> Eo Location Quantity <br /> () NW corner intersection Lump Sum <br /> S._......._.. 4 G .......---......... ............ .. ....... <br /> ........._...._...—....._—__ 4 _..._........_.......__........................._................................_....._._..._._......__............._................._......_....._....._.._......_._.._...-..._........__...........................................--_ —..__—._._.—........... — ...—_..._.—..... — ...—........_—..r <br /> 24 G <br /> ExistingE.P. .......... ......_.... __...._.. ............. .._...._... .... ..._.... <br /> R/W Install 125 L.F. Type A - (High Dike) <br /> See S.P. N8-A. Construct drainage <br /> openings at 10' intervals (typ). See <br /> detail below. n <br /> 6" <br /> g" PLAN — ^ Limits of Clearing and Grubbing L <br /> Top of Dike r & Earthwork (Roadway Widening R/W Limits of Clearing and Grubbing <br /> 6 0 20 40 4' and Earthwork (Roadway Widening) <br /> 7'f <br /> Conform <br /> Pavement Surface SCALE IN FEET Conform 4' Controller pad <br /> DRAINAGE OPENING `- -- �� far N.G.III Var. <br /> 1 4 1 12 <br /> / / / q : . :.�� . . ..�.a.4�m <br /> Widening <br /> A.C. DIKE _ / / / / , , / / / / h'.' g <br /> Existing Roadway A.C. Misc. Areas Conform <br /> (Type 1 ) <br /> 2% <br /> LEGEND <br /> SECTIONA — A a% I <br /> No Scale <br /> 0.30' Asphalt Concrete Misc. Areas (Type 1 ) <br /> Slope to drain. A.C. Dike (Type A) 0.70' Asphalt Concrete <br /> ® 0.70' Asphalt Concrete Misc. Areas (Type 2) NOTE' Misc. Areas (Type 2) Existing Roadway <br /> ............_.. Gr.G .._.._...- 24'0 High Pressure Gas Main (P.G. & E.) <br /> Asphalt Concrete for Misc. Areas (Type 2) shall be <br /> -- 4G — 4"0 High Pressure Gas Main (P.G. & E.) spread by a truck-mounted asphalt paver (spreader TYPICAL SECTION <br /> box), or other equipment approved by the Engineer. <br /> T Telephone Conduit (Conte!) The asphalt concrete shall be placed as follows: <br /> Top layer = 0.20' maximum thickness; placement NW Corner of Intersection <br /> Direction of Surface Drainage shall not begin until lower layers) <br /> has been in place for a minimum No Scale <br /> Uj of 12 hours. <br /> o Lower layer(s) = 0.50' maximum compacted z <br /> thickness. w <br /> 0 <br /> z <br /> J <br /> z <br /> DRAWN BY DATE SHEET TOTAL cj <br /> PROJECT ENGINEER DATE CHECKED DATE SUBMITTED DATE APPROVED DATE HE SHEETSly <br /> w <br /> dc��n 5Cy2 Si9Z '/92 r�,s COUNTY OF SAN J OAQ U I N SCALE: As Shown PIAN, TYPICAL SECTION PROJECT AIRPORT WAY AND BOTH ROAD G <br /> t(Q,v� �iLu�t �/�n ,d /va /�� ��9z AND CONSTRUCTION NOTES TRAFFIC SIGNAL 2 4 <br /> FILE NAME DRAWER SHEET N0. H\R <br /> �I� E:\AIROT \ROADPLAN <br />
The URL can be used to link to this page
Your browser does not support the video tag.
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).