My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
A432 - A440
PublicWorks
>
VAULT MAPS
>
Large Plans - LP
>
Drawer A
>
A415 thru A482
>
A432 - A440
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/14/2023 10:30:54 AM
Creation date
1/22/2016 10:23:24 AM
Metadata
Fields
Template:
Large Plans - LP
Project
Project Plans for Alpine Avenue Widening
Limits
Union Pacific Railroad to Southern Pacific Railroad
Year
1995
Project Engineer
Mahmoud Saqqa
Roads Worked
Alpine Ave.
Red Lines
Yes
Federal #
STPLHG-5929 (023)
Supplemental fields
Cross Ref
A432 - A440
DocCategory
Improvement Plans
Type
Widening
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
GENERAL NOTES <br />-4A <br />1. All locations for new equipment are approximate. Final locations shall <br />be determined in the <br />field by the Engineer. <br />-5E <br />2. Underground utility locations shall be verified prior to excavation. The <br />Contractor shall be <br />responsible to notify USA at 1-800-642-2949 48 hours prior to any <br />excavation work. <br />3. Signal sections shall be metal with 12" 0 indication, and backplotes shall be louvered. <br />Visors on the mast arm mounted signals shall be "tunnel" type. <br />-6A <br />4. All pull boxes shall be No. 5 unless otherwise noted on the plans. <br />ES <br />5. Left turn signal heads shall use arrow designations. <br />ES <br />6. Installation of detector wire in saw cuts shall be done in the presence <br />of the Engineer. <br />7. All conductors and their terminations shall be clearly marked. <br />ES -1 1 <br />8. Pavement markings and striping shall be done by Contractor. <br />-313 <br />9. All salvaged material shall be delivered by the contractor to the Public <br />Works Maintenance <br />yard at 1810 East Hazelton Avenue, Stockton, California. <br />r ----- <br />A2 <br />wo <br />. <br />i <br />AB 0A2 Q <br />.. f 4 <br />1 <br />3', R S FA <br />/ 1 <br />1 <br />� 1 <br />—� F <br />L_J AP <br />s�:� BP <br />I 0Bl <br />.I <br />t ---i {:.. 0 B <br />1 <br />R S FA <br />0C3 <br />B2I <br />8 I O <br />I B 1 <br />II 2 <br />AB i` <br />1 , <br />4 <br />i i <br />RS FA <br />Controller <br />ALPINE <br />r„ Bp <br />APP AP 0A <br />A L J <br />A <br />' <br />All <br />'AB <br />Sao <br />C2 <br />3 <br />5PB. - <br />A2 j -I�;; re <br />�0C Al <br />- <br />2 <br />J � I <br />' AB <br />0iCu 0B1 <br />© 1 <br />RS FA 1 RS FA <br />EN <br />R SHEET NO.1 ACAD <br />4lIll6j I f:\dato\alpine\sheet6a <br />C <br />Al <br />APPLICABLE STANDARD PLANS <br />ES <br />-4A <br />ES <br />-3D <br />ES <br />-5E <br />ES -8 <br />ES <br />-1 B <br />ES <br />-3E <br />ES <br />-6A <br />ES -10 <br />ES <br />-3A <br />ES <br />-5A <br />ES <br />-6R <br />ES -1 1 <br />ES <br />-313 <br />ES <br />-513 <br />ES-6RA <br />r ----- <br />ES -13 <br />ES <br />-3C <br />ES <br />-5C <br />ES <br />-6S <br />ES -14 <br />RS FA <br />; B1 <br />DH <br />1. <br />Contractor shall furnish and install <br />1 <br />1851: to crosswalk <br />K <br />I <br />,iEf2. <br />L ----- <br />shall be assigned as shown on the plans, <br />N N <br />r ----- <br />N N <br />C3 <br />0C4 <br />Ped. Push Button signs shall conform to <br />._ 1 t <br />;' 0C3 <br />AB RS FA �'A <br />1 8 <br />1 <br />0B2 `=} f- <br />1 , <br />I ; <br />R S FA <br />062 ! O <br />, <br />BpL.J J ) <br />A App <br />Orp, <br />E J Q 5 PB w/ext <br />a <br />416U LDH <br />- 416E EJ <br />0 0 <br />a <br />a /7\ ..._..�...�__-...... <br />1 1/2"C, 2DLC p 7�--Exist�,iing <br />`Existing QPECWaterVaultL Existing <br />S.D.I. PPB 04, 06P <br />ES -2D PPB 06, 04P <br />III - AF Type 170 <br />2"C 2#6 c Signal Controller <br />to remain in place. <br />185' to crosswalk <br />rrt <br />1 1/2"C, <br />D <br />N N <br />c(D (o <br />011110 <br />2"C, 6DLC <br />PPB 08, 06P <br />PPB 06, 08P---\ n T0� rl <br />7J5L <br />7J91- <br />• ■ ■ m <br />2"C 7DLC ,. <br />08 <br />I <br />t--a---------I 2 <br />8 <br />] 7J5U �t 031i 07 <br />` L -------L------------ <br />-! <br />7J5U <br />` <br />04 <br />I <br />R j <br />4 , �.� Lam -- 2"C 3#4 SEslvlcllz m <br />A <br />AB 06 <br />08P <br />RS FA AVENUE 06Pj 08 <br />I �V} <br />01 & 06 03 & 08 <br />OAI <br />- OR-- 06 -- OR <br />08P 01 4^� 4^� <br />W -tom 06P j 02P 07 <br />08 02P I 1 07 <br />04111110-�7 (j (j 04 <br />- 05 V Y 02Y -� <br />04P 05 02 04P <br />04 & 08 01 & 05 02 & 05 02 & 06 03 & 07 04 & 07 <br />PHASING DIAGRAM <br />EXISTING SIGNAL PLAN <br />J. EC <br />n -r r . -_ —. <br />: L K�_P _� <br />Ir_ J1,�"7_ " : k " <br />/3,�q� —��,�, 5 o�q COUNTY OF SAN JOAQUIN scaLE:"=20' <br />D <br />Existing Landscape Planter <br />PPB 08, 02P <br />PPB 02, 08P <br />AVENUE 3 <br />2"C' <br />O 6DLC o <br />1 1C2DLC <br />0 <br />0a <br />08 <br />78J8U8J8L nu <br />L_J DH u 319L u 315U <br />-------------------- <br />Existing utilitly pole pµOFESg`0 <br />P. G. & E. ���.,"'i v M <br />(Future Fiber Optic Drop) Ati`v N„i;e <br />- PPB 04, 02P �� <br />t <br />8J6L <br />8J6U <br />1� <br />LO <br />G <br />NOTES <br />DH <br />1. <br />Contractor shall furnish and install <br />ALL NEW CONDUCTORS <br />1851: to crosswalk <br />for eight phase operations. <br />,iEf2. <br />New phasing for the entire intersection <br />shall be assigned as shown on the plans, <br />N N <br />and all conductores labeled accordingly. <br />N N <br />3. <br />Ped. Push Button signs shall conform to <br />Standard Plan ES -5C. Contractor shall <br />furnish new sign for all Ped. Push <br />/� <br />PLAN <br />Button. <br />4. <br />The Contractor shall furnish final os -built <br />NOTE: This accurate for <br />drawings for this project at no additional <br />plan <br />electrical work only. <br />cost to the County. <br />5. <br />The contractor shall maintain full operation <br />of the existing traffic signal during the <br />k` <br />progress of work, exept when shutdown is <br />permitted by the Engineer. <br />`r`10 <br />27C, with Twisted Loop Conductors per ES -5A <br />Nt' ... 11 .fit: <,I-%"1, __.._I- <br />.... . _.. ,_ _.. ..... <br />�.._/./ <br />TRAFFIC SIGNAL AND HIGHWAY <br />ALPINE <br />AVENUE WIDENING <br />SHE <br />TOTAL <br />SHEETS <br />LIGHTING LAYOUT <br />Union Pacific Railroad to Southern Pacific Railroad <br />6 <br />g <br />
The URL can be used to link to this page
Your browser does not support the video tag.