Laserfiche WebLink
STOP (Typ.) <br />R 61 at <br />begin <br />taper <br />12" Limit Line (Typ.)l _ s�= <br />Type 1 (10) Arrow (Typ.) <br />PROJECT ENGINEER I DATE <br />E <br />Signal <br />i <br />o Nn <br />0 50' - 75- <br />Ahead (Tvo.i <br />a w <br />.� i► 1� <br />- :_� <br />�ko <br />o <br />r <br />Detail 38 <br />Detail 9 % <br />Type VII (R) Arrow <br />�k 12" White Line shall be considered <br />pavement marking. <br />Detail 9 <br />Ld <br />w- <br />112" White LineT <br />C YP ) <br />im <br />Railroad <br />Crossing <br />(Typ-) <br />Type 1` (1 Q) Arrow (Typ.) <br />Refer to Standard Plans A20A, A2013, A20D, <br />A24A, A24C, A24D and A24E for details. <br />CHECKED DATE SUBMITTED DATE t APPROVED DATE so 0 so STRIPING AND PAVEMENT ALPINE AVENUE WIDENING sNo� s�r <br />s <br />COUNTY OF SAN JOAQUIN „ <br />SCALE: 1 =60 MARKING PLAN Union Pacific Railroad to Southern Pacific Railroad o <br />I <br />40 <br />. <br />ft- <br />CHECKED DATE SUBMITTED DATE t APPROVED DATE so 0 so STRIPING AND PAVEMENT ALPINE AVENUE WIDENING sNo� s�r <br />s <br />COUNTY OF SAN JOAQUIN „ <br />SCALE: 1 =60 MARKING PLAN Union Pacific Railroad to Southern Pacific Railroad o <br />