My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
B368 - B373
PublicWorks
>
VAULT MAPS
>
Large Plans - LP
>
Drawer B
>
B304 thru B584
>
B368 - B373
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2025 8:18:10 AM
Creation date
1/22/2016 10:58:28 AM
Metadata
Fields
Template:
Large Plans - LP
Project
Benjamin Holt Drive and Gettysburg Place Traffic Signal
Limits
Intersection of Benjamin Holt Drive and Gettysburg Place
Year
2000
Project Engineer
Michael Selling
Roads Worked
Benjamin Holt Dr., Gettysburg Pl.
Red Lines
No
Federal #
CML-5929 (100)
Supplemental fields
Cross Ref
B368 - B373
Type
Traffic Signal
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
I <br /> AWG CONDUCTOR SCHEDULE <br /> OR POLE OR RUN No. <br /> CABLE 0 CIRCUIT 1 4L- A3 z4 , 5 6 7 8 9 <br /> POLE A 11-0-1 1-0-1 1-0-1 1-0-1 <br /> W POLE B 1-1-0 1-1- 1-1-0 <br /> Q Q V 3-12-28 POLE C 1-0-1 1-0-1 <br /> II i CONDUCTOR <br /> POLED 1-1-0 1-1- 1-1-0 <br /> CABLE POLE E 1-0-1 1-0- 1-0-1 1-0-1 <br /> j V_ R >4 lI/� 0 a POLE F 1-1-0 . 1-1-0 1-1-0 1-1-0 1-1- <br /> I (7 POLE G 1-0-1 1-0- 1-0-1 1-0- 1-0-1 1-0-1 <br /> 45 <br /> I I I 416U I M 20 10 0 20 40 TOTAL CABLES 8-4-4 8-4-t 4-2-2 3-1-22-1-1 1-0-1 1-1-0 2-1-1 3-2-1 <br /> Y G ;I 1"=20' GRAPHIC SCALE <br /> 2" C, 2 DLC I r��l�V� LUMINAIRE <br /> 2 2 2 2 2 2 2 <br /> 1 <br /> B I I I W /-- RL Exist. sign --,, 1 2 2 2 <br /> ! <br /> DH � �I <br /> R 117 ��, {�� �� a , �,��.. , r�_t ,9 D.L.C. 2 2 2 2 2 2 <br /> BENJAMIN HOLT DRIVE 6 © � � .� � F �� TYPE C 4 2 2 2 z z <br /> B 6P S 2 2 2 2 2 <br /> is <br /> • UM <br /> 80 TO <br /> ® y _ �.. Z" C, 5 DLC 2 2 2 <br /> IT LINE <br /> �4pPB O P 3 k ' :., . . _ ___ TOTAL D.L.C. 12 12 6 2 2 4 4 6 <br /> _ . <br /> -5 Q ::: - -. _. <br /> go 7- <br /> a . 2" C 2' C. 1 DLC —�� 2" C - <br /> 06 <br /> /Lu _ <br /> DH to <br /> SJOU ....-..._ <br /> r 6J2U <br /> SAA DH ;1 7 _ _ CONDUIT I 2-4" 2-4" 4" 4" 4" 4" 4" 4" 4" <br /> 01 •5 111 U DH 111U <br /> DHU •2 <br /> 2" C, 1 DLC 2• C. <br /> Y C. ©0 ❑ P�4ti; 6oX <br /> .__ •1 10 <br /> _ 0 i —� •4 �— ., LocnnoN STANDARD slc T ARM EQUIPMENT ETYPE SCHEDULE <br /> e <br /> •4 <br /> 2" C. 4 DLC <br /> PEO <br /> •4 - i5f � - SIGNALS SIGNAL PPB LUMINAIRE <br /> IAPB F �� SEC. MTG. MTG • ARROW WATTAGE NOTES <br /> LIMITTO _. J, I y \\ -. <br /> � F <br /> MIT LINE T►Y° INSTALL G7 "BENJAMIN HOLT DR" SIGN <br /> " • 8 1W& ' 12" MAS SP-1-T ; u 200W HPS <br /> E BJBL 2 ❑ O _ ❑ ❑ ❑ (� 19-3-SO 25' 15' <br /> O RL Exist. sign RL Exist. street light SC <br /> 8 1W3L 1RSV-1-T <br /> , <br /> 02 <br /> PPOI 2" C, P 2#10 It <br /> o DH •8P <br /> ' 0 1-8 - - 5 1W3L A,12" TV-1-T SP-I-T g RT <br /> `2" C, 2 DLC _ 5 ,W3L A,12' MAS INSTALL G7 GETTYSBURG PL SIGN <br /> © 26-4-80 40� 2 1W3L 12" MAS SP-I-T R, 'L{ 20OW HPS INSTALL R34 SIGN. <br /> 2" C. <br /> O 1-8 - - 4 1W3L 12" TV-1-T �_I_T R ;Ri <br /> LY C, <br /> yy,� C' 19 Y4' r <br /> SSSS O 19-3-80 25 151 4 1W& 12" MAS SP-I-T 2 LT 20OW HPS INSTALL G7 "BENJAMIN HOLT DR" SIGN <br /> s 4" Con to Lip of Gutter 4 1W3L tC£" SV-1-T <br /> No. 21258 - - <br /> • E9, 9-3"1 i O I-B <br /> 1 1W3L A,12" TV -T SP-1-T 4 RT <br /> CAL1F0��\e 6' Typ. all aides © 24-4-80 35' I IW& r,12" MAS 4 LT INSTALL G7 "GETTYSBURG PL" SIGN <br /> D H PROJECT NOTES 6 1 W 12" MAS SP—I—T 200W HPS INSTALL R34 SIGN <br /> 141 4" 6 IW&3L FSV-1—T <br /> O 1—B 8 1W& 12" TV—,—T SP—I—T 6 RT <br /> 1 (PGkE), 120/240, 1 PHASE, 3 WIRE SERVICE <br /> DETECTOR HANDHOLE DETAIL LOAD: TRAFFIC SIGNAL SYSTEM (120), APPROX. 2650 WATTS. (D <br /> 4-200 W. HPS LUMINARIES. P CABINET AND FOUNDATION WITH GFjQUNDING ROD, AND TYPE 90 CONTROLLER ASSEMBLY. <br /> TOTAL LOAD: 3,450 +/- WATTS. CONSTRUCT CONCRETE PAD FOR P CABINET AND SERVICE, SEE ES-4B. <br /> •gip O2 TYPE III-AF SERVICE ENCLOSURE (SEE ES-21)) <br /> f— 06 PROVIDE ITEMS , THRU 8, 15 THRU 17, AND 21 AND 22. <br /> s1 <br /> ❑3 RS FA STREET LIGHTING POLE AFTER TRAFFIC SIGNALS ARE TURNED ON. J FURNISH AND INSTALL TYPE III-AF SERVICE ENCLOSURE, SEE ES-20. <br /> 6p 04 ❑4 MODEL P CABINET WITH TYPE 90 CONTROLLER AND AUXIUARY "A" INDICATES 12" ARROW DISPLAY. <br /> st a 06EQUIPMENT TO FACILITATE THE SIX PHASE SIGNAL OPERATION. PRIOR TO <br /> a 06 4 INSTALLATION CONTRACTOR SHALL HAVE CONTROLLER TESTED AND SUPPLY THE <br /> 01 1 02 04p I 08p COUNTY OF SAN JOAQUIN CONSTRUCTION INSPECTOR WITH A CERTIFICATE OF COMPLIANCE. <br /> T JV, OS EXISTING POLE FOR ELECTRICAL SERVICE RISER. <br /> 05 or o-2p-0 RISER LOCATION ON THE POLE, SIZE AND HEIGHT SHALL MEET PACIFIC GAS AND ELECTRIC (PG&E) GENERAL NOTES : <br /> 08 SPECIFICATIONS. Qp6E�q <br /> 01 h sS � © RS FA EXISTING TYPE 1-0 POLE (TOTAL 4) AND FLASHING BEACON AFTER TRAFFIC SIGNALS ARE TURNED ON. 1. LABEL PEDESTRIAN AND SIGNAL COMMONS SEPARATELY IN I�ISIM EIB TITICA OICINEFR <br /> IS s2 do s8 14 Ac s8 IN THE CONTROLLER CABINET. No. E-6615 <br /> It•2 j F7 TEMPORARILY RELOCATE EXISTING POLE AND FLASHING BEACON. 2. INSTALL TYPE V PHOTOELECTRIC CONTROL UNIT w ~ e <br /> •2p <br /> 02 t •S RS FA EXISTING POLE AND FLASHING BEACON AFTER TRAFFIC THE SERVICE CABINET. <br /> C SIGNALS ARE TURNED ON. � � 1fo <br /> 3. FLASHING INDICATIONS SHALL FLASH RED ON ALL PHASES. 7tn1� <br /> 8 lla, P.B. <br /> Steady Demand Sequence REMOVE EXISTING OVERHEAD SERVICE FEED FOR STREET LIGHTING. 4. ALL "STOP AHEAD" PAVEMENT LEGENDS SHALL BE REMOVED, Wilbur J. EAND ALL R-1, W-17 AND W-17A STREET SIGNS, SHALL BE `�anvr4ceo 7624 WoodoldtI e rol yyDft <br /> 10 <br /> Q UNDERGROUND SERVICE FEED FOR FLASHING BEACONS. REMOVED AND SALVAGED AT SIGNAL NRN ON. <br /> 25� <br /> X16 PULLBOX W/ r SCHEDULE 80 CONDUIT AND PULLROPE IN THE SAME TRENCH <br /> AS CONDUIT RUNS 3 AND S FOR FUTURE FIBER OPTIC INTERCONNECT. <br /> 10 Rs FA EXISTING ELECTROUER AFTER TRAFFIC SIGNALS ARE TURNED ON. NOTE: THIS PLAN ACCURATE FOR ELECTRICAL WORK ONLY. <br /> DRAWN BY DATE PROJECT ENGINEER DATE CHECKED DATE SUBMITTED DATE APPROVAL RECOMMENDED DATE SHEET <br /> COUNTY OF SAN JOAQUIN 20 SCALE SIGNAL PLAN BENJAMIN HOLT DRIVE AND GETTYSBURG PLACE TRAFFIC SIGNAL NO. [SHEE% <br /> �aaua oz/oo (Intersection of Benjornin Holt Drive and Gettysburg Place) 4 6 <br /> FILE NAME DRAWER SHEET NO. I ACRD REVISIONS DATE <br /> MI Per COS 18/30/00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.