Laserfiche WebLink
I <br /> GENERAL NOTES <br /> Const. 1. The Contractor shall obtain an Encroachment Permit from Caltrans for work and <br /> Const. traffic control within the State's right of way. <br /> 12' Var. Const. <br /> (Refer to Plans) 2. Contractor shall scarify native soil adjacent to pavement to a depth of 6 inches <br /> Limits of Clearing and Grubbing and Miolbox Relocation 1 r 12't 5'3 and blend shoulder backing material prior to compaction. Limits of this work is <br /> o Var. confined to intersection radii plus 50' each direction. Payment for blending shall <br /> be considered as included in the contract unit price paid for shoulder backing. <br /> o > (8- 14 ) Construct Swale <br /> See Shoulder 0 I 2❑ See Shoulder 1 0 to grade B I 3 w 3. All earthwork, except for final lift of shoulder backing shall be completed prior <br /> Schedule 12' i2' Schedule U ° (See Plans) $ 1 w R & D Exist. Dike to placing the final lift of asphalt concrete surfacing. <br /> Vor, o Vor' 4% 4. Where mainline asphalt concrete overlay exceeds 0.20', it shall be placed in <br /> - - - - <br /> 22' Pavement Reinforcing Fabric Vor. �-aq, ,� ,u two (2) layers of approximate equal thickness with pavement reinforcing on <br /> 1❑ - - - ' - - I — �- the existing surface. <br /> 0.12' Sta. 10+1 6 to Sta. 22+00 - - - - - - - - - - <br /> IL <br /> 0.35' Sta. 44+00 to Sta. 47+00 0.12' A.C. I 5. Placement of asphalt concrete surfacing shall not begin until the asphalt concrete <br /> Overlay 0.30' Asphalt Var. Depth used in pavement repair has been in place for 24 hours. <br /> Concrete A.C. Leveling <br /> F26. Embankment repair at two locutions within south bridge approach will be done as <br /> Var. Var 14' - 17' Sta. 77+00 to Sta. 86+45r� r� directed by the Engineer. Payment for this work will be by Force Account. <br /> 12' — 14' Sta. 93+22 to Sto. 96+40 DRIVEWAYS TYPE F A. C. ( TYPE B) LEVELING Item No. 1. <br /> Sta. 11 +00 to Sta. 11 +75 (Lt.) Sta. 79+54 to Sta. 85+75 (Lt.) 7. Existing gas valves to be adjusted by others. <br /> L - - - - - - - - - - - - — 3❑ <br /> za' sta. 10+16 to Sto. 21 +00 Sta. 12+ 10 to Sta. 12+85 (Lt.) Sta. 78+60 to Sta. 85+75 (Rt.) <br /> ❑1 34' sta. 77+00 to Sto. 85+70 Sta. 15+87 to Sta. 17+77 (Rt.) <br /> Existing Roadway 0.25' Asphalt Concrete Overlay <br /> 24' Sta. 85+70 to Sta. 86+45 <br /> 24' Sta. 93+22 to Sta. 96+00 Conform ® E.P. Const. <br /> TYPICAL SECTION EP <br /> Sta. 10+ 16 to Sta. 197+75 1 12' Var. Depth A.C. Overlay <br /> *00R R Const. 1 13'-26' (Lt.) <br /> Construction I Limits of Clearing and Grubbing Var. <br /> and Mailbox Relocation g'-14' 04 <br /> E.P. Conform I <br /> R = Conform to c <br /> Location 12"' Standard Frame and existing radii <br /> Limits of Earthwork <br /> FDia. or Sq. Cover Assembl o <br /> Variable depth Asphalt Concrete <br /> Y 1 Misc. Areas o E <br /> (Refer to S.J. Co. I 0 0 <br /> 6" 6" Std. Dwg, CW-M1.) 4' 2' 1'3 I o 0 o 0 <br /> over existing paved driveway. 1 <br /> A,C. Overlay Var. 0 Vor. <br /> E Vor. <br /> � TYPE E — — <br /> 4" - <br /> ,8" Existing Roadway Conform ® E.P. I w ` <br /> o <br /> E.P. � Var _. 87 <br /> v - - - - - - - � - - - - - - - - - - - - <br /> 6" p.C.C. EP 8-%� Vl - 0.12' A.C. Overlay Exist. A.C. Frontage <br /> J <br /> 1:1 I - - - - - - J LEGEND <br /> 0.00' Undisturbed Survey Monuments 'M' 1'1 0.25' Shoulder <br /> r basement soil 3/4"s x 30" iron pin Backing <br /> with identification marks DETAIL 3 ® Variable Depth Asphalt Concrete Overlay. <br /> (To be installed by others) EarthworkAT <br /> (Misc. Areas — Type 1 ) <br /> 0.10' Conform0.00 Depth of Asphalt Concrete Pavement Planing, <br /> Wt Conform SURVEY MONUMENTExist. Width ■ Limits of Asphalt Concrete Pavement Planing. <br /> � <br /> Asphalt Concrete 12' Min. DETAIL 5 <br /> (Miscellaneous Areas) 0.30' Asphalt Concrete over L Const. <br /> Intersection Location Width (Ft.) Length (Ft.) Exist. Surface shaped and compacted native Const. <br /> Street (Station) W1 W2 P T L 0.50' A,O, TYPE D <br /> Kirschemon Road (West) 52+94 16 - - 20 70 I I 17' S' <br /> The concrete driveway at Sta. 173+703 Rt. shall be removed to I Limits of Clearing and Grubbing <br /> Schmeidt Road (West) 65+98 25 40 10 20 50 the joint 21 '3 from the center line and reconstructed with and Mailbox Relocation 12' S' <br /> Schmeidt Road (East) 65+98 ,8 - - 20 50 asphalt concrete (Driveways Type D). Concrete removal I Exist. Fence <br /> Orchard Rood (West) 118+87 19 - - 18 30 b _ 6 shall be paid by the "Clearing and Grubbing" Item of Work. 2• 4• 1•t 3 (Gutter Grade a to remain <br /> Orchard Road (East) 118+87 19 - - 20 60 yl I"- I I "' Gutter to <br /> Sheet 4) A.C. Dike 0.10' A.C. <br /> Acampo Road (West) 145+23 24 40 20 40 52 * * I I Type C Walkway <br /> Conform Conform I R & D Exist. Dike - YV Y <br /> Acampo Road (East) 145+23 24 40 20 40 52 Structure Backfill Sta. (Lt.) Sta. (Rt.) I d o Conform X <br /> Length Length <br /> (957 Relative w o 27 4-8% 2R <br /> INTERSECTION PAVING DETAIL Compaction) „+7g q' 8+85 4' I Var 8y v - __-- <br /> 16+00 4' 19+30 4' I VO - 74 <br /> 16+60 4' 19+80 4' I I A.C. Overlay L Imported Borrow <br /> 17+00 4' 20+35 4' - 8' - - - - - - J 2 0.25' A.C. <br /> 1 ' O.D. 1' Var. Depth <br /> 4' Min. 17+50 4' 20+95 4' <br /> Width, length and locations to be 18+38 1 ,' 21+40 4' Shoulder Backing Limits of Eorthwork (Misc. Areas) <br /> determined by the Engineer O.D. + 2' <br /> Existing 19+35 ,o' zz+ao a• DETAIL 2 <br /> Surface 19+75 4' DETAIL 4 <br /> TRENCH DETAIL 20+25 4' Earthwork (Misc. Areas — Type 2) <br /> Sto. 145+23 (Rt.), 20+65 4' <br /> Sta. 183+50 & Sta. 197+00 21+05 4' Const. <br /> SHOULDER SCHEDULE <br /> 22+80 4' I Limits of Clearing and Grubbing Sto. to Sta. (Left) Detail Sta. to Sta. (Right) Detail <br /> 0.50' Asphalt ConcreteTYPICAL DRIVEWAYS i �r and Mailbox Relocation 10+16 to 15+00 5 10+16 to 17+77 5 <br /> 15+00 to 40+00 1 10+77 to 23+15 N/A <br /> Var. 6 1 '3 (A.C. Frontage) <br /> PAVEMENT REPAIR DETAIL 41+00 to 47+00 2 23+15 to 26+15 4 <br /> Const. A.C. Dike 48+00 to 58+00 1 26+40 to 42+00 1 <br /> Refer to Plan Layout <br /> 18' 18' a E 59+00 l0 66+00 2 43+00 to 49+00 2 <br /> 18"' SDI (Typ.) , for location & type w $ <br /> 4'-0" 12'3 12'3 (Refer to S.J. Co. c 66+50 to 73+50 , 50+00 to 55+00 1 <br /> Match exist. I ° 73+50 to 76+70 3 56+00 to 67+00 2 <br /> 1 ' Min. Improvement Std. Var. U <br /> rade T CW-M7 & CW-D14) , VO- r_� 76+70 to 85+75 1 68+00 to 74+00 1 <br /> 6" 3'-O" 6" 9 (Typ.) I Existing Roadway kC'er I • . _ _ 86+45 to 93+22 N/A (Bridge) 74+50 to 76+70 3 <br /> Voc - - - - - - - - - - - - <br /> M L _ - - - - - � _ - - - - - _ � - - - - - J 93+22 to 96+00 1 76+70 to 85+75 1 <br /> oil1 � Var. Depth 97+00 to 115+00 2 86+45 to 93+22 N/A (Bridge) <br /> N <br /> oro shoulder backing Shoulder Backing 117+00 to 120+00 1 93+72 to 96+00 1 <br /> 121+00 to 142+00 2 97+00 to 110+00 2 <br /> S=Level amp (Typ.) DETAIL 1 143+00 to 150+00 1 111+00 to 116+00 1 <br /> 10 Hole V <br /> 5x18Rebar 2' Sta. 157+00 to 157+40 151+00 to 188+00 2 117+00 to 131+00 2 <br /> N " <br /> '1 per block 18" R.C.P. (Class Iv) Sta. 79+54 to Sta. 85+700 (L(Lt.) 189+00 to 191+00 1 132+00 to 138+00 1 <br /> Sta. 78+60 to Sta. 85+70 (Rt.) 192+00 to 195+00 2 139+00 to 143+00 2 <br /> PLAN SECTION A-A STORM DRAIN INLET EQUALIZER DETAIL 196+00 to 197+50 1 144+00 to 159+00 1 <br /> 160+00 to 169+00 2 <br /> BUMPER BLOCK DETAIL Sta. 183+50 & Sta. 197+00 1170+00 to 197+50 <br /> Note: 1 . Equalizers to be installed prior to overlay. SHOULDER DETAILS <br /> 2. Right grate elevation equals existing center line elevation. Stations omitted are transition areas between shoulder type. <br /> DRAWN BY DATE PROJECT ENGINEER DATE CHECKED DATE SUBMITTED DATE APPRCVAL RECOMMENDED DATE SHEET TOTAL <br /> �' � ��� iJlJh €Tl` OF g= JtJr ' L ' II No SCALE <br /> b�zylaTYPICAL SECTION AND BRUELLA ROAD RESURFACING No. SHEETS <br /> i ��i 1'�� CONSTRUCTION DETAILS (State Highway Route 12 to Peltier Road) 2 6 <br /> FILE NAME DRWR SHEET A. ACAD REVISIONS DATE <br /> sheet-name.dwg D <br /> AVAcadtempAprojects\bruella\bruella-big plans <br />