My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
E504 - E508
PublicWorks
>
VAULT MAPS
>
Large Plans - LP
>
Drawer E
>
E434 thru E556
>
E504 - E508
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/3/2024 10:56:24 AM
Creation date
1/22/2016 12:44:36 PM
Metadata
Fields
Template:
Large Plans - LP
Project
Eleventh Street Resurfacing
Limits
Kasson Road/Grant Line Road to Interstate 5
Year
2001
Project Engineer
Meyrick Palis
Roads Worked
Eleventh St.
Red Lines
No
Supplemental fields
Cross Ref
E504 - E508
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REMOVING CONCRETE EARTHWORK PAVEMENT REINFORCING <br /> Location Quantity (MISC. AREAS — TYPE 1 ) FABRIC <br /> Location Quantity Location Quantity <br /> Eastbound <br /> Ste. 6+80t to Ste. 9+50 Lt. 600 L.F. Ste. 13+50 TO 46+00 32.50 Ste. Westbound <br /> (Lt. Turn Is.) Ste. 11 +25 to 13+50 300 S.Y. <br /> Approximately 1 ,373 C.Y. of (12' Wide) <br /> Ste. 10+50 Lt. 35 L.F. excavated material to be used <br /> Westbound Sta. 13+50 to 47+00 8,933 S.Y. <br /> Ste. 9+30 Rt. 45 L.F. to construct shoulders. (24' Wide) <br /> Ste. 10+20 to Ste. 13+10 Rt. 615 L.F. Eastbound <br /> (Lt. Turn Is.) Ste. 10+77 to 31 +00 5,395 S.Y. <br /> Total 1,295 L.F. (24' Wide) <br /> Total 14,628 S.Y. <br /> EARTHWORK <br /> (MISC. AREAS — TYPE 2) GENERAL NOTES o <br /> CLEAN EXISTING Location Quantity <br /> d 1 . PORTLAND CEMENT CONCRETE PAVEMENT SHALL BE PLACED AFTER <br /> DRAINAGE FACILITIES EastbounPORTLAND CEMENT CONCRETE <br /> LALL ASPHALT CONCRETE PAVEMENT IS COMPLETED. ASPHALT CONCRETE <br /> Location Quantity sta. 6+0o to sta. 10+00 4.0o sta. PAVEMENT <br /> Ste. 10+77 to Ste. 31 +00 20.23 Ste. SHALL BE SAW CUT AND P.C.C. PLACED NEAT. <br /> Kasson Road Westbound Location Quantity <br /> Ste. 3+85t 18"OX66' X—Drain Ste. 11 +25 to Ste. 13+50 2.25 Ste. 2. EXISTING DRAINAGE FACILITIES SHALL REMAIN IN PLACE UNLESS OTHERWISE <br /> Ste. 4+85 18"OX115' X—Drain Lump Sum Westbound <br /> Ste. 5+15t (Lt.) S.D.I. Ste. 46+00 to Ste. 47+00 1 .00 Ste. Ste. 9+73 to 13+50 162 C.Y. NOTED. THE CONTRACTOR SHALL CONDUCT EARTHWORK OPERATIONS SO <br /> Turnaround Are Grant Line Rood AS NOT TO MODIFY OR OBSTRUCT THE EXISTING DRAINAGE. <br /> Ste. 27+00± 1 .00 Ste. Ste. 6+55 to 7+65 49 C.Y. <br /> Total 28.48 Ste. Total 211 C.Y. 3. ALL SHOULDER WORK (EXCEPT FOR FINAL SHOULDER GRADING) SHALL <br /> BE COMPLETED PRIOR TO PLACING FINAL LIFT OF ASPHALT CONCRETE. <br /> 4. ASPHALT CONCRETE USED FOR PAVEMENT REPAIR SHALL NOT BE PLACED <br /> IN LAYERS WHICH EXCEED 0.50' IN COMPACTED THICKNESS. <br /> PAVEMENT REPAIR 5. PLACEMENT OF ASPHALT CONCRETE SURFACING SHALL NOT BEGIN UNTIL <br /> Location Quantity THE ASPHALT CONCRETE USED IN PAVEMENT REPAIR HAS BEEN IN PLACE <br /> 14 Sites Throughout Project 1 ,309 S.Y. DRIVEWAYS TRAFFIC SIGNAL MODIFICATION FOR 36 HOURS. <br /> Quantity Location Quantity 6. ASPHALT CONCRETE SHALL BE PLACED IN TWO (2) LAYERS OF APPROXIMATE <br /> Type No. Area Refer to Sheet 4 of Plans EQUAL THICKNESS WITH PAVEMENT REINFORCING FABRIC PLACED ON THE <br /> and Special Provisions Lump Sum EXISTING OR PREPARED SURFACE. <br /> E 7 352 S.Y. (Section 86 Special) <br /> 7. THE CONTRACTOR SHALL OBTAIN AN ENCROACHMENT PERMIT FROM CALTRANS <br /> FOR WORK AND TRAFFIC CONTROL WITHIN THE STATE'S RIGHT OF WAY. <br /> PLANING ASPHALT <br /> CONCRETE PAVEMENT <br /> Location Quantity <br /> Eastbound <br /> Ste. 10+77 to Ste. 12+77 737.2 S.Y. ASPHALT CONCRETE <br /> Ste. 30+50 to Ste. 31 +00 211 .1 S.Y. <br /> Westbound (TYPE A) <br /> Ste. 11 +25 to Ste. 13+50 975.0 S.Y. <br /> Ste. 13+50 to Ste. 16+00 277.8 S.Y. Location Quantity <br /> Ste. 46+50 to Ste. 47+00 133.3 S.Y. <br /> Mainline 2,909 Tons <br /> Grant Line Rood Widening Areas 3,717 Tons <br /> N/E Quadrant (0.25') 1 ,015.6 S.Y. Intersection 478 Tons <br /> Ste. 6+55 to Ste. 7+65 293.4 S.Y. Pavement Repair 1250 Tons <br /> Intersection Area 1 ,769.6 S.Y. Driveways (Type E) 40 Tons <br /> Total 5,413.0 S.Y. Total 8.394 Tons <br /> DRAWN BY DATE SUMMARY OF QUANTITIES SHEET TOTAL <br /> PROJECT ENGINEER DATE KED DATE SUBMITTED DATE APPROVA RECOMMENDED DATE ELEVENTH STREET RESURFACING No. SHEETS <br /> COUNTY OF SAN JOAQUIN SCALE AS SHOWN AND GENERAL NOTES (Kasson Rd./Grant Line Rd. to Interstate Route 5) 5 5 <br /> FILE NAME DRAWER S H Etf N 7C-AD- REVISIONS DATE <br /> All.dwg �' ��� ��Accdtemp�projects�1 lth Street�AlLdwg <br /> Ali <br />
The URL can be used to link to this page
Your browser does not support the video tag.