My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
F220 - F227
PublicWorks
>
VAULT MAPS
>
Large Plans - LP
>
Drawer F
>
F148 thru F266A
>
F220 - F227
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/8/2016 3:11:02 PM
Creation date
1/22/2016 1:14:51 PM
Metadata
Fields
Template:
Improvement Plans
Supplemental fields
DocCategory
Improvement Plans
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
R/W 1❑ 1 1 /2" C, with Twisted Loop Conductors per ES-5A <br /> R/W Sta. 144+8134 (French Camp Road) _ <br /> 1 1 /2 C, 3 DLC, 3 # 10 <br /> Sta . 326+9683 (Union Road) R/W <br /> E F 3�3 , � Const. 2" C, 3 #2 1 1 /2 C, 1 DLC, 3 # 10 / <br /> R W <br /> E.P. 232 P.R Service Point 1 1 /2" C, 3 # 10 <br /> PEC E.P. (Existing <br /> Utility Pole) R/W <br /> p to o6 -- <br /> s _._ a <br /> 1 <br /> C) ___ <br /> 12' 212(1 _m_-. ._ `�' _.- 7 ', � 4 o 4 - --- -----_77 -� --- _ stop _bar Y <br /> o O <br /> r - 4 � _ <br /> _ <br /> a <br /> __ _ <br /> � .- - �� 1 � 6J4 <br /> N <br /> �So '� �- `- 214 44 _.- t _ <br /> H �o — _ <br /> s .ob 1 111 _ <br /> Or <br /> E. P. N N __ -._ i <br /> 145 <br /> DH ! o2 DH <br /> 46 N <br /> 3 # 10 -- p _153 <br /> . _..- 1❑ <br /> -� ,_ �.__._ ca 400' to _ <br /> µ <br /> r- <br /> stop bar C° � <br /> R/W 1 112 C, 1 DLC ; 3 # 10 <br /> _ .._ <br /> 2 1 <br /> E. P. ,_. \._. .. _ m2 D E.P. E. P. E.P. <br /> 1 1 /2 C, 2 DLC , 3 # 10 O 4 5 - <br /> R/W See Detail A "= / tele hone Cab ,eat 239 ' 308' <br /> R/W 6 R/W R/W <br /> CM X r,~1,n R/W <br /> 12' a DH 1 1 /2 C, 2 DLC, 3 # 10 <br /> N+ x <br /> 5 # 10, '� Furnish and @ FRENCH CAMP ROAD <br /> 3 # 14 ,J, 4 install Type `; ��� 4 R/W <br /> 6 —�- 170 Controller <br /> and model <br /> 332 cabinet. 6, <br /> Const. <br /> �' vy ES-2D R/W APPLICABLE STANDARD PLANS <br /> No. 21258 <br /> Up. 9-30-97 III-A F 1 1 /2 C 2 #6E. <br /> P. sA '\ „ ES - 1A ES - 3C ES - 5B ES - 6T <br /> �9r civic �\P `\ �2' 131 /2 C ES - 1 B ES - 3D ES - 5E ES - 8 <br /> FBF CAL1E0� <br /> CONTROLLER/SERVICE PAD G �2' ES - 2A ES - 3E ES - 6A ES - 10 <br /> D ETAI L A <br /> 2 R/W ES - 2C ES - 4B ES - 6P ES - 1 1 <br /> NO SCALE 0 E. P. ES - 2D ES - 4C ES - 6R ES - 13 <br /> Z ' <br /> ES - 3A ES - 5A ES - 6S ES - 14 <br /> GENERAL NOTES <br /> 286 l � � 51 � aPK 1 1/ 2 C ES - 3B <br /> 1 . All locations for new equipment are approximate. Final locations shall be determined in the 3 # 10 /DLC <br /> field by the Engineer. d Q <br /> 2. Underground utility locations shall be verified prior to excavating . The Contractor shall Q R/W -o <br /> be responsible to notify USA at 1 -800-642-2949 48 hours prior to any excavation work. 6 o PHASE DIAGRAM <br /> 3. Signal sections shall be metal with 12" indications, and backplates shall be louvered . Visors <br /> E. P. <br /> on the mast arm mounted signals shall be tunnel type and all others shall be full circle. i O o6 o 6 o4 <br /> 319' <br /> 4. Flashing indications shall flash in red on all phases. 12' R W on- <br /> o4 <br /> E.P. o 2 <br /> 5. All pull boxes shall be No. 5 unless otherwise noted on the plans. ' <br /> ) r <br /> 6. Left turn signal heads shall use arrow designations. R/W ^\2 >� 2 <br /> 01 <br /> 7. Installation of detector wire in saw cuts shall be done in the presence of the Engineer. E. P. <br /> o 1 & o6 m 2 & la 6 o4 <br /> 8. All conductors and their terminators shall be clearly marked. <br /> NOTE: Steady Demand Sequence <br /> w 9 . Pavement markings and striping shall be done by others. This plan accurate for electrical work only. <br /> Z <br /> IR <br /> 10. Foundation for controller cabinet and Type III Service Cabinet shall be combined " <br /> w <br /> into one oversize pad as dimensioned in Detail A. z <br /> LL <br /> DRAWN BY DATE 0 20 4.0 SHEET TOTAL c <br /> PROJECT ENGINEER DATE CHECKED DATE SUBMITTED DATE APPROVED DTE TRAFFIC SIGNAL AND FRENCH CAMP ROAD No. SHEETS ry <br /> Ej� 5,12 s�)l �1p4 � �a� �� ��, COUNTY OF SAN JOAQUIN Scale in Feet HIGHWAY LIGHTING PLAN RESURFACING & SIGNALIZATION 5 8 <br /> FILE NAME DRAWER SHEET N0. ACAD <br /> ROAD F F:\DATA\FR_CMP\SHEET5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.