Laserfiche WebLink
'ON 133HS 83MVd JO <br /> GENERAL NOTES <br /> s' <br /> 1. The Asphalt Concrete (0.12' resurfacing) shall be placed in one (1) layer. �r 2.5' <br /> (TYP.) EXPANSION <br /> Carrst. 2. All Pavement Repair and Crock Sealing must be completed 24 hours prior JOINT <br /> to placement of Asphalt Concrete. <br /> Limits of Clearing and Grubbing and Mailbox Relocation a ° ° a <br /> WLIN <br /> See .* See 3. Contractor shall scarify native soil adjacent to pavement at Intersection FL UTTER °���D° a <br /> OF GUTTER 3'-0' <br /> Shoulder 12 �12 Shoulder radii to a depth of 6" and blend shoulder backing material prior to •a — i I — — <br /> Details Details Typical Section Station compaction. Limits of this work shall be confined to intersection radii a000D% I, <br /> eExisting <br /> Var Streets Begin End plus 50 feet in each direction. Payment for blending shall be considered ° <br /> Second Street 10+65 13+82 as included in the price for Shoulder Backing. EXPANSION Exist. 18" SDI <br /> 9+88 17+52 JOINT <br /> Rocdwo 0.12' A.C. Overio Sixth Street 4, The contractor shall conduct the Shoulder Backing operations so as not to Y Y 17+76 25+27 disturb or obstruct any existing drainage. <br /> Seventh Street 9+88 13+70EXPANSION JOINT LOCATIONS AT EXISTING 18„ SDI <br /> TYPICAL SECTION 13+95 21 +40 5. Surface preparation of existing pavement (2' wide pavement planing at raised <br /> 9+88 14+95 transverse block cracks and crock sealing) shall be as directed by the Engineer. <br /> See Typical Section Table (Right) for Streets k Stations Elm Street 16+30 24+12 Payment for this work will be by Item No. 2 Crack Sealing as a Lump Sum. <br /> 3/e” <br /> Ponderosa Street 9+88 15+05 <br /> 6. French Comp School will be Closed from June 26, 2008 to July 4, 2008. <br /> McKinley Avenue 9+88 12+10 Summer school session will begin on July 5, 2006. Frontage Improvement <br /> Willow Street 9+96 16+90 work, as shown on these Plans, on Elm Street and Fourth Street along <br /> French Camp School shall be constructed and completed during school closure. <br /> c Ash Street 1 11+15 1 12+79 16'1 (Rt. k Lt. Side) After July 5, 2006, the school shall have access to its property at least on <br /> *Fourth Street 10+12 13+77 * = 18'1 (Rt. Side) one of their frontages, either Elm Street or Fourth Street, Refer to Shoulder EXPANSION JOINT <br /> (Crown is 6' Rt. of Const Details 4 & 5 on this sheet for Frontage Improvements adjacent to French <br /> Camp School. REFER TO SHEET NO. 3 FOR LOCATIONS <br /> 7, Replacements for broken or missing Bumper Blocks will be supplied by Manteca <br /> Shoulder Detail 1 EP Unified School District. Contractor can call John Leandro, Construction Manager <br /> for MUSD, at (209) 825-3200, Ext. 767 for additional details. V-6" MIN, V-6" MIN. <br /> Limit of Clearing k Grubbing 1 5.8. Decorative Gravel frontages within the limits of work shall be removed within FL PAVING <br /> SIDE STREETS <br /> 0.12' A,C. Overlay 3' of the Edge of Pavement and relocated offer all Shoulder work Is completed, g" 1/y" RADIUS TYPICAL <br /> SHOULDER DETAILS Payment for removal and relocating of Decorative Gravel shall los Considered " CLASS 2 CONCRETE <br /> Station Street Side $hOUlder as included in the price for Shoulder Backing. 8 <br /> Begin lBegin I Left I Right I Detail <br /> Conform Exist. EP Second Street COMPACTED CLASS 2 A.B. MATERIAL TO 95X <br /> Shoulder Backing 10+65 113+821 x I 1 1 <br /> 10+65 113+821 1 Sixth Street x ' CONCRETE VALLEY G UTTE R <br /> +0 <br /> SHOULDER DETAIL 1 100 17+52 x 1 <br /> *Second Street (Sto. 12+00 to Sta. 13+20, Rt. Side Only) 4' of Top Soil 9 +0 17+52 x 1 <br /> (Top Soil shall be Sandy Loam and to be Paid by Shoulder Backing Item) <br /> 17+76 25+15 x 1 See Note Below NOTES <br /> 17+76 25115 x 1 1. CONSTRUCT EXPANSION JOINTS, PER AGENCY REQUIREMENTS <br /> Seventh Street Existing AND OTHER FIXED AT BEGINNING & ENDS OF OBJECTSCURBS, EACH SIDE OF CATCHBASINS <br /> Surface <br /> 10+12 13+70 x 1 2. CONCRETE VALLEY GUTTER FLOWLINE SHALL BE 17' RIGHT OF <br /> 9+88 13+70 X 1 CONSTRUCTION CENTERLINE ALONG ELM STREET AND 13.5' LEFT <br /> 13+95 21+40 x 1OF CONSTRUCTION CENTERLINE ALONG FOURTH STREET. <br /> 3. SEE SHEET NO. 5 FOR GUTTER GRADES. <br /> 13+95 21+52 x 1 Q FOUR - 5/8" X 24" LONG STEEL DOWELS, GREASED AND WRAPPED <br /> Elm Street ONE SIDE THROUGH ALL EXPANSION JOINTS. <br /> 9+88 14+95 x 1 030 Asphalt © 4 - #4 BARS CONTINUOUS WITH #4 BARS AT 48" ON CENTER <br /> ED <br /> ETW Shoulder Detail 2 10+68 14+95 x 1 Concrete ® TOEASTFORM D 17B51R EXPANSION JOINT FILLER CONFORMING <br /> Exist. AC Frontage 16+30 24+00 x 1 <br /> r <br /> Limit of Clearing dr Grubbing� 16+30 18+25 x i PAVEMENT REPAIR DETAIL <br /> 1' 19+20 24+12 x 4 <br /> 0.12' A.C. Overlay 4' McKinlev Avenue Approximate dimensions used for estimating purposes <br /> Vor, 090--- 9+88 111+181 x 1 1 2 are available upon request, Dimensions and locations <br /> 11+18 12+10 <br /> x I 1 1 ars subject to change of Engineers discretion. <br /> 10+20 12+10 1 1 x 1 1 Note: Width (4' minimum). <br /> Exist. ETW Conform Ponderosa Street <br /> 10+12 12+60 1 x 1 <br /> SHOULDER DETAIL 2 13+60 15+05 1 x 2 <br /> 10+00 15+05 1 1 x 1 3 <br /> Ponderosa Street: Sta. 13+60 to Sto. 15+05 (Lt) <br /> McKinley Avenue: Sta. 9+88 to Sta. 11+18 (Lt.) WiIIOW Street <br /> 9+96 16+90 x 1 riable depth Asphalt Concrete <br /> over existing paved driveway. <br /> 9+96 16+90 x 1 Conform O E.P. <br /> Fourth Street <br /> 10+12 13+75 x FF Va <br /> 5 a' <br /> 10+12 13+77 x 1 1 <br /> EP Ash Street 4' <br /> Shoulder Detail 3 11+15 12+91 x 1 R <br /> Limit of Clearing do Grubbing 10+12 12+50 x 1 Concrete Volley Gutter <br /> Earthwork Mic. Arens <br /> * (Swab * 1' i, Place a catch R - Conform to Conform <br /> 6 6' ter :,. basin filter existing radii <br /> 2 Asphalt Concrete Resurfacing <br /> 0.12' A.C. Overlay <br /> 4' Conform <br /> Vor. __ � <br /> �� ___---- - unit iCatchDBasinmFilltQr)rotgec4 n TYPE E <br /> 0.5 -- — - roman in place and functioning <br /> Existing from the beginning of the working <br /> Ground days until the and of the project, 0.30' Asphalt Concrete over <br /> Shoulder Backing Conform Slope.BX and shall be paid by Force Account, shaped and compacted native <br /> Slope-Vor, Conform O E.P. <br /> SHOULDER DETAIL 3 PROTECTION FOR EP <br /> Ponderosa Street (Sta. 10+40 to Sta. 15+05) (Rt. Side only) (Swale- 12'wide) EXISTING DRAINAGE INLET <br /> *Ponderoso Street (Stu, 10+00 to Sta, 10+40:3') (Rt. Side Only) (Swale•6'wide) <br /> 4' <br /> R W (Fence) Shoulder Detail 5 ETW <br /> E1W Shoulder Detail 4 (Fence) 21'1 Conform <br /> 271 Limit of Clearing Qc Grubbing Const. <br /> Limit of Clearing B Grubbing 19'S' Limits of Clearing k Grubbing Exist. Miedth <br /> n. <br /> Roadway <br /> 22 Excavation 12' 1' ; -„ w " ' A �{ TYPE F� <br /> Roadway Limits 3 I . 4 i . A•� 'p r : St `.,w J_LL <br /> Excavation 8 �T� 4' NOTE: Portion of existing concrete driveway from <br /> 12.52'1r3p 2'1 10' { lrrin� ;14 _ _�,_ to 4' shall be removed. <br /> Limits I 0.12' A.C. Overlay - - Cone of pavement beyond ha <br /> 1.5 2'1 3' 2'1 14.5''---�4' Vor or. --- - P`�tl� SJ Z - ,�,...._ ._� Concrete shall los sow cut to provide a neat straight <br /> y `_ -- - �"�-- joint at the conform line. <br /> 0.12' A.C. Overlay 1'+I °°°°°°° ° ° tt< �' _ �' _- _ Removal of concrete shall be considered as included <br /> Vora or V 0.10' A.C. Overlay °° ° i't Sia 1SIp(, rl�:l")ravonq }Zhn fln ✓,,:. in the contract Lump Sum unit price for Clearing and <br /> °°°°°°° Bumper Block (Remove/Reset) Grading Plans for remain nroplacs Grubbing. <br /> Concrete Drivewov <br /> 0.10' A.C, Overlay Volley Gutter 3' Wide 0.30' Pavement Repair 309 E. Seventh St. Sto: 20+171 (Lt.) <br /> 0,12' A.C. Overlay ( y ( > ) ( yp,) ep° LONGITUDINAL PLANING DETAIL <br /> 0�. Valley Gutter (3' Wide) Portland Cement Concrete T <br /> Pavement (Portland Cement Concrete) Note: Flowline of Volley Gutter (See Detail on this Sheet) TYPICAL DRIVEWAYS <br /> epa'r (See Detail on this Sheet) 22'1 Left of School Fence Ponderosa Street: Sta. 13+60 to Sto. 15+OS (Lt.) <br /> (Typ,y (approx. 17' Rt, of Const. �) Note: Flowline of Valley Gutter McKinley Avenue: Sta. 9+88 to Sto. 11+18 (Lt.) <br /> SHOULDER DETAIL 4 along Elm Street SHOULDER DETAIL 5 (app}oxRight ofSchool <br /> cofolcF Fence <br /> Fourth Street (Sta. 10+12 to Sta. 13+75) along Fourth Street <br /> Elm Street (Sta. 19+20 to Sta. 24+12) (Left Side Only) <br /> (Right Side Only) <br /> DRAWN BY DATE PROJECT ENGINEER DATE CHECKED DATE APPROVAL RECOMMENDED DATE TYP. SECTION, CONSTRUCTI0N FRENCH CAMP STREETS RESURFACING SHEET TOTAL <br /> J. ��«�u 2/06 COUNTY OF SAN JOAQUIN NO SCALE N0. SHEETS <br /> �, CA . 3106 erAWt •f//o/06 y ,"4;, 41)d1,69 DETAILS & GENERAL NOTES (Various Streets) z 5 <br /> FILE NAME ±DRAWER SHEET NO. 1 ACAD REVISIONS DATE <br /> 1251 1 E:\Projects\2006\French Camp Streets\Plans 17771 <br />