Laserfiche WebLink
NOTES: <br /> 1 . The concrete washout sign shall be installed <br /> Earthen berm within 30 feet of the temporary concrete <br /> Plastic liner washout facility. <br /> - Plastic liner placed <br /> over be Earthen berm (entry 3' Min 2. Plastic liner shall be anchored with gravel—filled <br /> under berm entr 8" Min <br /> Gravel—filled side only) _4 bags for below grade concrete washout facility. <br /> bag Top of cut — Original ground Original ground <br /> 1 L _� 1 TYPICAL SECTION <br /> 1 3 EARTHEN BERM <br /> Plastic <br /> liner Plywood 4'x2' <br /> SECTION B-B + + painted white <br /> Plastic liner CONCRETE <br /> over berm ---- bEarthen WASHOUT Gla hck eighters <br /> Earthen berm Plastic Greavel —filled bag <br /> Lag screws <br /> Gravel—filled liner — Plastic liner <br /> bag over berm <br /> Original ground Staples (2 Plastic liner (4x4x8Wood post <br /> per bale) <br /> Wood or metal <br /> stakes (2 per bale) <br /> SECTION A-A <br /> Straw bales (2 <br /> bales high Max) CONCRETE WASHOUT <br /> 3' 15' Min 3' <br /> Original ground 1 ' Min SIGN DETAIL <br /> Typ Typ <br /> 2" <br /> Gravel—filled <br /> bags in corners SECTION C-C <br /> Gravel—filled Edge of Plastic <br /> bags -- Liner (See Note 2) <br /> 1 /8" Clio <br /> 15' Steel wire <br /> Min <br /> Edge of STAPLE DETAIL <br /> plastic liner 0 0 0 0 0 0 0 o a o <br /> --Straw <br /> c o bales <br /> C3 <br /> A <br /> C3 Wood or metal <br /> stakes <br /> Top of cut o <br /> o C C <br /> a o <br /> Earthen Wedge loose <br /> Berm straw between <br /> 1 :3 In <br /> bales <br /> C3 <br /> Gravel—filled TEMPORARY WATER POLLUTION <br /> a bags in <br /> CONTROL DETAILS <br /> 0 0 0 0 0 0 0 0 o a <br /> corners (CONCRETE <br /> " WASHOUT SYSTEM <br /> Entry side of 4 min ) <br /> Earthen —► �- ..__.. _.._ ._ PLAN <br /> washout facility - 6 Berm CONCRETE WASHOUT SYSTEM oFEssio <br /> Plastic liner placedOn Grade A <br /> under berm (entry ( ) REGISTERED CIVIL ENGINEER c <br /> PLAN side only) n I <br /> 5/20/2005 ICHAEL A. SANCHEZ ?� <br /> No. C60254 <br /> CONCRETE WASHOUT SYSTEM PLANS APPROVAL DATE <br /> Exp. 06-30-06 <br /> Q Quincy Engineering, Inc. sfq CIVIL <br /> (Below Grade) 3247 Ramos Circle lF of CAL\F�� <br /> Sacramento, CA 95827 <br /> DRAWN BY DATE PROJECT ENGINEER DATE CHECKED DATE APPROVAL RECOMMENDED DATE SHEET TOTAL <br /> W. Texler ff2�// COUNTY OF SAN JOAQUIN NO SCALE WPC _ 1 LOWER SACRAMENTO ROAD IMPROVEMENTS NO. SHEETS <br /> MICHAEL A. SANCHEZ 5/18/05 KEITH D. RHODES 5/19/05 !0 !0 HARNEY CURVE PROJECT 33 96 <br /> FILE NAME DRAWER SHE N0. ACAD REVISIONS DATE FOR REDUCED PLANS ORIGINAL a 1 2 3 <br /> �(.�L1 SCALE IS IN INCHES I I I I I sl66rwpcl.dwg, Thu, 19 May 2005 - 8:00pm, mikek <br />