My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
L686 - L781
PublicWorks
>
VAULT MAPS
>
Large Plans - LP
>
Drawer L
>
L610 thru L781
>
L686 - L781
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/29/2024 11:01:34 AM
Creation date
1/22/2016 6:30:48 PM
Metadata
Fields
Template:
Large Plans - LP
Project
Lower Sacramento Road Improvements Harney Curve Project
Limits
Between Armstrong Road and 300 Feet North of Harney Lane
Year
2005
Project Engineer
Michael Sanchez
Roads Worked
Lower Sacramento Rd.
Red Lines
No
Supplemental fields
Classification
Improvement Plans
Cross Ref
L686 - L781
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Sta ke Stake <br /> Stake © 2' O.C, typ Min <br /> Fiber Roll Rope Rope <br /> NOTES: <br /> Fiber Roll Fiber Roll -- <br /> Excavated material <br /> 1 . Temporary fiber roll spacing <br /> from furrow Notch � varies depending upon slope <br /> ° O <br /> Slope inclination. <br /> 2. Installations shown in the <br /> ^ Slope — . perspectives are for slope <br /> °� �J Stake inclination of 10: 1 and steeper <br /> 1 /2"x1 /2" <br /> / Notch <br /> 2' 2' 6" <br /> SECTION SECTION PLAN ELEVATION <br /> TEMPORARY FIBER ROLL TEMPORARY FIBER ROLL STAKE NOTCH DETAIL <br /> TYPE 1 TYPE 2 <br /> Grading Conform or <br /> Grading Conform or To of Slope <br /> Top of Sloe P p P <br /> 6' Below Grading <br /> 6' Below Grading Conform <br /> Conform <br /> a <br /> / <br /> / Varies <br /> _ Varies <br /> °oqo � Slope Inclination oGaQz Slope Inclination <br /> Fiber Roll <br /> ej � :\��ej � z Fiber Roll <br /> � ��� Z�Z� Stagger Fiber Roll Joints <br /> Stagger Fiber Roll Joints Excavated 5 to 10' <br /> 5 to 10' Material <br /> Above <br /> Toe boneof 5 <br /> �— Toe ofSlape �— TEMPORARY WATER POLLUTION <br /> CONTROL DETAILS <br /> Grading Conform Or Grading <br /> Slope Or (TEMPORARY FIBER ROLL) <br /> Toe n <br /> Toe of Slope pe <br /> PERSPECTIVE PERSPECTIVE �/2� ""` `S�ar�° �o Ql10FESS/ONq� F <br /> REGISTERED CIVIL ENGINEER Vy� <br /> TEMPORARY FIBER ROLL (TYPE 1 ) TEMPORARY FIBER ROLL (TYPE 2) ICHAEL A. SANCHEZ ?� <br /> 5/20/2005 Na. C60254 A <br /> PLANS APPROVAL DATE 4` Exp. 06-30-06 <br /> Quincy Engineering, Inc. CIVIL <br /> 13 3247 Ramos Circle lF OF Cpl\FO`s <br /> Sacramento, CA 95827 <br /> DRAWN BY DATE PROJECT ENGINEER DATE CHECKED DATE I APPROVAL RECOMMENDED DATE LOWER SACRAMENTO ROAD IMPROVEMENTS SHEET TOTAL <br /> W. Texlern� /_ COUNTY OF SAN JOAQUIN NO SCALE WPC' 5 NO. SHEETS <br /> 1Ga <br /> MICHAEL A. SANCHEZ 5/18/05 KEITH D. RHODES 5/19/05 � s i� HARNEY CURVE PROJECT 37 96 <br /> FILE NAME DRAWER SHEET NO. ACAD REVISIONS DATE FOR REDUCED PLANS ORIGINAL <br /> u SCALE IS IN INCHES I I I I I sl66rwpc5.dwg, Thu, 19 May 2005 - 8:02pm, mikek <br />
The URL can be used to link to this page
Your browser does not support the video tag.