My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
L686 - L781
PublicWorks
>
VAULT MAPS
>
Large Plans - LP
>
Drawer L
>
L610 thru L781
>
L686 - L781
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/29/2024 11:01:34 AM
Creation date
1/22/2016 6:30:48 PM
Metadata
Fields
Template:
Large Plans - LP
Project
Lower Sacramento Road Improvements Harney Curve Project
Limits
Between Armstrong Road and 300 Feet North of Harney Lane
Year
2005
Project Engineer
Michael Sanchez
Roads Worked
Lower Sacramento Rd.
Red Lines
No
Supplemental fields
Classification
Improvement Plans
Cross Ref
L686 - L781
Document Relationships
Extension Road (Formerly Sacramento Road Ext.)
(Message)
Path:
\VAULT MAPS\*CARD CATALOG*\E
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CONDUCTOR SCHEDULE EQUIPMENT SCHEDULE <br /> CONDUCTOR DESIGNATION NUMBER OF CONDUCTORS VEHICLE SIGNAL <br /> RUN NUMBER STANDARD MOUNTING + PEDESTRIAN PPB HPS <br /> 1 2 4 5 6 8 9 NO. SIG. MA LUM. MA MAST SIGNAL + LUMINAIRE STATION OFFSET REMARKS <br /> N0. 14 CONDUCTORS TYPE ft ft ARM POLE MOUNTING 0 ARROW (WATTS) <br /> 01 3 3 3 MAS FURNISH AND INSTALL D3 (HARNEY) AND <br /> 3 3 3 3 OA 29-5-129 50 15 SV-1 -UM 250 561 +10.50 55.38 RT R73-2(CA) SIGNS ON SMA. INSTALL EV(A) <br /> 02 3 3 3 <br /> MAS ON SIGNAL HEAD. <br /> 03 1 3 313 3 <br /> 04 13 3 6 613 © 1 -B TP-1 -UM 2P RIGHT 560+77.12 59.00 RT FURNISH AND INSTALL R9-3a ON STANDARD. <br /> 05 3 3 3 3 316 613 3 3 (7') <br /> 06 3 3 3 3 . 3 . <br /> 07 3 3 3 3 31 1 1 -B TV-2-UM 110+62.40 29.11 LT <br /> 08 1 1313 3 6 6 3 3 <br /> 02P 2 212 2 2 2 MAS FURNISH AND INSTALL D3 (LOWER SACRAMENTO) <br /> 04P 12 2 4 4 2 O 19-4-129 30 15 SV-1 -UM SP-1 -UM 2P LEFT 250 110+55.63 31 .43 RT AND R73-3(CA) SIGNS ON SMA. <br /> PPB(02P) 1 1 11 1 1 1 1 1 MAS INSTALL EV(B) ON SIGNAL HEAD. <br /> PPB(04P) 1 122 1 <br /> PPB COMMON 1 1 1 1 2 2 1 OE 1 -B TV-2-UM SP-1 -UM 4P RIGHT 559+88.27 48.23 RT <br /> SPARES 3 . 3 . 3 3 3 6 6 3 3 3 <br /> 02 SIGNAL HEAD SHALL BE 17 ABOVE GRADE. <br /> PEU 1 3 MAS SV-1 -UM FURNISH AND INSTALL D3 (HARNEY) AND <br /> Q 61 -5-129 60 15 MAS 250 559+72.95 64.26 LT R73-2(CA) SIGNS ON SMA. FURNISH AND <br /> SV-1 -UM INSTALL PEU ON STANDARD. INSTALL EV(C) ON <br /> TOTAL NO 14. CONDUCTORS 9 13 19 24 28 53 50 2215 9 <br /> MAS SIGNAL HEAD. <br /> NO. 8 CONDUCTORS © FURNISH AND INSTALL R9-3a SIGN ON THE <br /> SIGNAL COMMON 1 I 1 I 1 1 1 I 1 I 1 1 1 1 <br /> 1 -B TV-2-UM SP-1 -UM 4P RIGHT 109+33.63 33.47 RT STANDARD. <br /> STREET LIGHTING 2 2 212 2121 2 21 1 <br /> MAS INSTALL D3 (LOWER SACRAMENTO) AND <br /> OH 19-4-129 25 15 SV-1 -UM 250 109+20.73 25.20 LT R73-3(CA) SIGNS ON SMA. INSTALL R9-3a <br /> TOTAL NO 8. CONDUCTORS 3 3 313 3131 1 13 3 1 MAS SIGN ON STANDARD. INSTALL EV(D) ON SIGNAL <br /> NO. 6 CONDUCTORS 1 11 <br /> HEAD. <br /> SIGNAL POWER 1 12 O1 -B TV-2-UM 560+78.72 51 .37 LT <br /> FURNISH AND INSTALL R9-3a SIGN ON <br /> DETECTOR LEAD-IN CABLE (DLC) THE STANDARD. <br /> 01 -1 1 1 1 1 1 FURNISH AND INSTALL ADVANCE FLASHING <br /> 02-1 , 02-2 1 2 2 21 1 -B TV-1 -UM 113+74.35 21 .28 LT BEACON INSTALLATION. SEE STATE STANDARD <br /> PLAN ES-4C FOR DETAIL. FURNISH AND INSTAL <br /> 02-3, 02-4 2 2 2 (FB) W3-3a SIGN ON STANDARD. <br /> 03-1 1 1 1 1 1 FURNISH AND INSTALL ADVANCE FLASHING <br /> 04-1 , 04-2 1212 2 O 1 -B TV-1 -UM 556+18.38 45.70 RT BEACON INSTALLATION. SEE STATE STANDARD <br /> PLAN ES-4C FOR DETAIL. FURNISH AND INSTAL <br /> 05-1 1 1 1 (FB) W3-3a SIGN ON STANDARD. <br /> 06-1 , 06-2 2 212 212 , FURNISH AND INSTALL ADVANCE FLASHING <br /> TV-1 -UM BEACON INSTALLATION. SEE STATE STANDARD <br /> 06-3, 06-4 2 2 2 2 2 © 1 -B (FB) 556+18.57 1 .13 RT <br /> PLAN ES-4C FOR DETAIL. FURNISH AND INSTAL <br /> 07-1 1 1 1 W3-3a SIGN ON STANDARD. <br /> 08-1 , 08-2 212 2 2 21 FURNISH AND INSTALL ADVANCE FLASHING <br /> O <br /> 1 -B TV-1 -UM 106+30.77 18.87 RT BEACON INSTALLATION. SEE STATE STANDARD <br /> (FB) PLAN ES-4C FOR DETAIL. FURNISH AND INSTAL <br /> TOTAL DLC 3 3 8 16 1618 5 5 W3-3a SIGN ON STANDARD. <br /> N0. 10 CONDUCTORS I * OTHER REQUIREMENTS ARE COVERED BY NOTES, LEGENDS, SPECIAL PROVISIONS AND STANDARD SPECIFICATIONS. FOR <br /> FLASHING BEACON 2 2 2 2 2 2 �� �� TYPE OF STANDARD, VEHICLE AND PEDESTRIAN MOUNTING, SEE STANDARD PLANS. <br /> 1 + SEE THE UNIMOUNT PEDESTRIAN AND VEHICLE SIGNAL MOUNTING DETAIL ON THIS SHEET. <br /> EMERGENCY VEHICLE DETECTOR CABLE \ / <br /> CHANNEL A <br /> CHANNEL B 1 1 1 1 <br /> CHANNEL C <br /> CHANNEL D 1 1 1 1 a --�-- <br /> TOTAL CABLES 1 1 1 2 2 4 4 1 1 \ / <br /> CONDUIT SIZE (INCHES) 2 2 3 3 1/ 3 3 2 16" MIN I- �oFON,�� <br /> FILLED 13 15 13 15 16 1 1 18 12 19 <br /> �� REGISTERED CIVIL ENGINEER KIN Y. CHAN <br /> TWO 3 TYPICAL PEDESTRIAN SIGNAL MOUNTING TYPICAL VEHICULAR SIGNAL MOUNTING <br /> 5/20/05 No. 55391 <br /> UNIMOUNT MOUNTING HARDWARE (UM) PLANS APPROVAL DATE EXP, 12-31-06 <br /> (NO SCALE) yy y&C 71 mmff170Jf1001mTA701Rm sf�T CIVILRAMOS <br /> SACRAM 0,CIRCLE <br /> S5M E OF CA���� <br /> 7E1:(91e)W6-0000 FAX:(91S)M-E000 <br /> DRAWN BY DATE PROJECT ENGINEER DATE CHECKED DATE APPROVAL RECOMMENDED DATE SIGNAL AND LIGHTINGLOWER SACRAMENTO ROAD WIDENING SHO. SHEETS TOTAL <br /> SH-YEA CHOONG 5/05 VINCENT FLING 5/05 KIN CHAN 5/05 S`i�Q COUNTY OF SAN JOAQUIN NO SCALE HARNEY LANE/LOWER SACRAMENTO ROAD HARNEY CURVE REALIGNMENT 94 96 <br /> 7o b CONDUCTOR AND EQUIPMENT SCHEDULE E-2 <br /> FILE NAME DRAWER SHEET N0. ACAD REVISIONS DATE FOR REDUCED PLANS ORIGINAL 0 1 2 3 <br /> SCALE IS IN INCHES I I ( I I I <br />
The URL can be used to link to this page
Your browser does not support the video tag.