Laserfiche WebLink
"a <br /> EXCAVATION P,AGKFILI_ E:XG YATION �G {r;t_ pXCAV�` ION BAC <FiLL <br /> ter, ;nal Ground r 1AICKE GROVE ROAD EXTENSION <br /> _ <br /> vrcdm plane Roadway cut before <br /> ,- Original Ground g Vew r Orr• nt �- -- -- ridge-Construction rodinc <br /> _.... <br /> .. <br /> Plane Ground ' ' S15— sI6 v <br /> Flow Line Pipe <br /> _ y - P <br /> ...- a. <br /> Roadwa or Ditch \ Original G _ <br /> li I <br /> �.x C._.V17tICnI I'I '" -!'f-.. 't '�w`•' %` : "l°;'�.,a7.�'' ,��a \ - -_ ___.— -�.. <br /> - i - <br /> �4��� .� t r, . . . t -=•� i r•-��`-- .•_ � v _ _ Grading <br /> T-4- <br /> Plane HEADWALLS Plane <br /> t $; Embankment in place before <br /> When concrete Is being aid for as Glass A Concrete(Minor Structure -. t ELEVATION <br /> PIPE CULVERT IN TRENCH g p ` structure cxcava on a made <br /> the cost of Excavation and Backf111 Is Included in the price paid for Class A �y Slope Qr1 <br /> Concrete(Minor Structure) Grading Plane r''` ' ,' T <br /> CULVERTIN TRENCH Grading P!or)e �- _ , T <br /> Roadway ` - \`* rFr`� D D <br /> Embankment °I <br /> Plane i r4 - -� I C' _t \ Ground4"F , I Roadway �� I <br /> r � �.�y Excavation <br /> Original- <br /> Grading <br /> Top of Box,� �v v �`�� v � I New <br /> .y r �_Roodwoy 'j I - <br /> " " - <br /> -� \; <br /> ,, Embankment <br /> 1 'Embankment � _ \ io <br /> lam_- <br /> ,.\ Tie Notes _ Gradin Original Ground or j a I D <br /> Plane �radi Plane ------- 0 0 <br /> -- � - > <br /> ,i.. ° .� of Excavating T G <br /> = PIPE CULVERT IN NEW EMBANKMENT s <br /> Original Ground <br /> Height c, Top of Embankment Before Excova in far Pipe t` � -------- <br /> CULVERT <br /> - <br /> CULVERT IN EMBANKMENTShol1 Be As Follows I'� i' - - i �- ^—i' <br /> For pipe 24"did or less.6"above top of pipe,or 30"max. <br /> For CMPover 24"to 90"dia 30"above bottom of pipe. RETAINING WALLS -/ <br /> For C M P over 90"dia : 1/3 point of dia above bottom of pipe Note If no roadway excavation is involved at the wail 1 PLAN � ' i :' Side Slope <br /> Paving Notch. For field d assembled ipld e culvert:bove bottom <br /> of uia above bottom B <br /> - _ grading p pip ' \ WJ' EXCAVATION BACKFILL j or Grading <br /> of pipe Structure Backfill b above to of pipe the original round i J - r <br /> Plane Structure excavation will be measured from y ane <br /> ti =" � Roadway For payment quantities excavation and backfill concrete i eT= min Toe of Embankment <br /> '' P Y q G P <br /> ., �', Embankment wall thickness as shown in AA_S.HO M170 for ClassM Pipe,Woll A <br /> On ingi Ground 1 ri Ground Surface at tinie <br /> 9 For „ M P T= 0-00 CULVERT EXCAVATION BACKFILL <br /> L °� structure excavation ------- Rdwy E�mt <br /> g i� is made.; <br /> - \ <br /> PIPE CULVERTS RODS 81DEADMEN �" ' <br /> p — -= Exocovat on Orf incl GroundI : Finished <br /> t P - \ y l f ,_. l Sloe -- ° <br /> GRADE TOP CULVERT 1 <br /> Exce t Underdrains 8i Overside Drains ""` g <br /> BOX CULVERTS cuLVERT8 i, <br /> Grading <br /> ��� r �Plone or <br /> P - %. <br /> Ell - <br /> g f 4 r Original Ground Original Ground <br /> �A . Original Ground -� , <br /> - 1 — Steepened Normal P PLAN OFWINGWALL SECTION A- A SECTION B- B I <br /> Slope Slope <br /> p When bridge piers ore in water course, quality and compaction requirements <br /> EXCAVATION Roadway BACKFILL <br /> for bockf ill will be waived and full compensation for backfilling the excavation <br /> j <br /> Toe of Cut at-� .- -- '� ---- - Embankment - <br /> 15' _ __ .__-� _- __ A will be considered as included in the price paid for structure excavation . <br /> Finished Grade <br /> PLAN --- <br /> I glow �.ine <br /> NOTE - Slopes and dimensions B - Ori incl Ground _ ___ <br /> may vary to fit field a "' g Grading Grading Side Slopes Rdwy Eng , <br /> conditions <br /> PLAN OF WARPED WINGWALL � � _ �EI I Plane , 5,_0,,� �- r Grading I <br /> EXCAVATION BACKFILL SECTION A -A min. �2'min. Finished Roadway Plane <br /> { III- EXCAVATION � I' . BACKFILL �'� below y Slop <br /> v Original Grou <br /> irder e\ xc <br /> 9 <br /> Roadway _ . . <br /> C - . �„ Original �_ � , � -., \ \ � _ _ � E a ation , ri in rid o� <br /> Structure „ <br /> F b e t <br /> I ",.,Ground , _m ankm • I y`\� �i I' p - !' <br /> Excavation -__ '-�• -�_ -� ---- �:- � 'i v , <br /> A A � - '-� --- � � � � Grading --- <br /> SECTION � � f <br /> GradingStructure _ ___� ._ _.—_ �-�_-_-- _ __-� <br /> Plane Backfill Culvert �� Culvert ..; �. __ Plane >� <br /> ---- ! SECTION C-C <br /> T Grading - ;t �1 <br /> >r r��J' <br /> 1--1�' PlaneJ `l may„ j F;ow l ne on details sLE <br /> hown <br /> ABUTMENT IN EMBANKMENT <br /> Culvert Ori Inas_ l g � Roadway or Drfch = � 1 I SECTION D - D <br /> I'�. : Culvert Ori incl Ground <br /> Ground Flow "' I ' �' Excavation I SE 0 <br /> Line <br /> - _ �_- SECTION B - B <br /> SECTION %� ��� �" ; , � - I' F- Ground Surface t t <br /> Gr n a line Roadway--'77 <br /> structure excavation - • <br /> WING WALLS Embankment '— <br /> LJ e <br /> Roadway is mode i • ,. <br /> When concrete is <br /> for as Class <br /> CULVERT INLETS� Structure <br /> Excavation ExcavationBackfill Structure <br /> r Original Ground _- NOTE : If no roadway excavation is involved at bridge <br /> paid Concrete( <br /> Minor <br /> custof Excevationand Backfillismciuded m the price paid forClass A " Grading Plane Structure excavation will be measured from <br /> Concrete (Minor Structure ) ; SECTION B - B <br /> l — <br /> i %: Roadway �_-- • � the original ground. - f <br /> -- e <br /> WARPED WING WALLS - _ Excavation n _ <br /> Ditch ROADWAY ,'- -PRISM <br /> � I E- I �- SECTION C-G <br /> Excovat on - '� Roadwa __. ._ Embankment Roadway <br /> �1 .0 , ---- -- --- --- - ---- -- - - -- ------ - - - Excavation ABUTMENT IN ORIGINAL. GROUND <br /> Excavation <br /> Regardless of <br /> To of BRIDGE PIERS , ABUTMENTS & ADJOINING WING WALLS <br /> CutDltch � � ; shape of gutter <br /> 1 I i j i i '• I---T----7T-r7— <br /> EXCAVATION <br /> EXCAVATION BACKFILL EXCAVATION BACKFILL <br /> Embankment or Embankment or Embankment or � Embankment or <br /> ! `�1�� u`!±!I ! 1 R - Original Ground Original Ground <br /> Bench <br /> - �- 5�min � i I � j � i ' � ' I �l i <br /> �T Original Ground . .n ° . . ;. ' • - Original Ground °- ' Original Ground <br /> Gutter ' Rj <br /> Gutter � g r Construction Joint, <br /> Grading <br /> i <br /> Pone n r , - � , ' ', - -- Construction Joint <br /> Meda ^ Roadway or Ditch 'Ditch or Roadway or Ditch i ,• `Ditch or <br /> All Ditch Excavation <br /> Gutter Contiguous Excavation 1 Original Ground <br /> Original Ground - ° Excavation /i: <br /> 5 GUtte6 � �-- r r r <br /> t Top limit of structure excavation and backfill is original Top limit of structure excavation and backfill is original <br /> Ditch Excavation ground if ditch is not excavated. ground if ditch is not excavated <br /> PAVED DITCH -• - ---- ---- <br /> MONOLITH! IC CONCRETE SLOPE PROTECTION CONCRETE SLOPE PROTECTION <br /> rn Ditch <br /> � . I VI-- Less than l2 LEGEND <br /> STATE OF CALIFORNIA <br /> y oadwa DEPARTMENT OF PUBLIC WORKS <br /> y - - - <br /> Excavation <br /> ' - Grading Plane ^' , I i I I Structure Excavation ® Roadway Excavation DIVISION OF HIGHWAYS <br /> DIKE AND GUTTER , <br /> Excavation and Backfill included m Structure Backfill `'; Roadway Embankment <br /> 12'or more — EXCAVATION AND BACKFILL A 62-2 <br /> the price paid for Dikes ROADWAY EXCAVATION — DITCH EXCAVATION ditch Excavation original Ground <br /> Y • nut .. e <br />