My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
M511 - M516
PublicWorks
>
VAULT MAPS
>
Large Plans - LP
>
Drawer M
>
M402 thru M523
>
M511 - M516
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/8/2016 3:11:21 PM
Creation date
1/22/2016 6:44:10 PM
Metadata
Fields
Template:
Improvement Plans
Supplemental fields
DocCategory
Improvement Plans
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
GENERAL NOTES <br /> 1. All locations for new equipment are approximate. Final locations shall be determined in the <br /> field by the Engineer. s Exist *' <br /> i , N <br /> 3 1/2"C© �O. <br /> 2. Underground utility locations shall be verified prior to excavating. The --� --�, A <br /> Contractor shall be responsible to notify USA at 1 -800-642-2949 48 hours prior to -,T <br /> any excavation work. <br /> a <br /> 3. Signal sections shall be metal with 12" 0 indications, and backplates shall be \ ` N <br /> „ Existing Type 170 Traffic 6 a� <br /> louvered. Visors on the most arm mounted signals shall be tunnel" type and all /� o <br /> , <br /> Signal Controller to remain VC, 2#8 F <br /> others shall be full circle. \ i` <br /> -- . , Y-- in place. 2#10 Service <br /> 4. Flashing indications shall flash in red on all phases. <br /> 5. All pull boxes shall be No. 5 unless otherwise noted on the plans. O 04 { Exist 3 �PPB06 <br /> 6. Left turn signal heads shall use arrow designations. �2L <br /> 7. Installation of detector wire in saw cuts shall be done in the presence of the /� /� PP806 ____-; ``-- 2 O QExist. 3"C <br /> Engineer. MAIN AIN ST Exist <br /> C � �� j o ® <br /> ' a 0 .� _x.. .,a ` ` 08P PP908 <br /> B. All conductors and their terminators shall be clear) marked. PPB04 <br /> y �® 03 P 06 C•20\C <br /> 9. Pavement markings and striping shall be done by others. 6P - - / g34\- <br /> 10. All salvaged material shall be delivered by the contractor to the Public Works Maintenance 06 0 - <br /> yard at 1810 E. Hazelton Ave., Stockton, Co. 0g CB <br /> 03 JP $ 5 I �� 6340 <br /> w � <br /> APPLICABLE STANDARD PLANS06 <br /> ES - 1A ES - 3D ES - 5E ES - 6T ES - 14 6' <br /> ES - 1B ES - 3E ES- 6A ES -8 ` 05 ,0 <br /> 212U 6' se's <br /> ES - 3A ES - 5A ES - 6AA ES - 10 5J1U 01 <br /> s <br /> X 5 <br /> ES - 3B ES- 5B ES - 6Q ES - 11 02 35'� <br /> ES - 3C ES- 5C ES - 6S ES - 13 212L 2I4U \ O <br /> 2I41- 02 <br /> C 01 � 07 07 X02 PPB08 <br /> 04 / <br /> 0 - ---------- _ �w� <br /> BID 6 <br /> 0 1 1/2"C,2DLO - <br /> 02Pw � — -- ...- <br /> y 0 PPB04 Q04 ' O <br /> co PLAN PPB02 O 6 0 <br /> O <br /> OB <br /> SFA <br /> O _ <br /> F <br /> MAIN T FA I <br /> 1y>> n <br /> RC <br /> O <br /> 0B <br /> E OA-- OBjp - <br /> ,� +�— <br /> C <br /> ---*C 0A <br /> , <br /> Existing Light to be , <br /> removed by others NOTE: This plan accurate for electrical work only. <br /> PROJECT NOTES: <br /> ' ® � All existing ^ � _ 1. Contractor shall furnish and install ALL NEW CONDUCTORS for eight <br /> phase operations. <br /> hI Ped Equipment 0A <br /> r--, r--� r---i r--7 to be used in �� 2. New Detector Loops for Main Street and the south leg of Oro <br /> , <br /> ;' ---L-J---1L___L_l__.{ -' Modified System. ` y% PO4 Avenue shall be installed prior to the slurry sealing of the <br /> P06 intersection and the approaches. On the north leg of Oro Avenue <br /> P'B-- -----------_ ----------- <br /> - --- O\\\ �A ]3 GA O 04 7 �--� all detectors shall remain and no slurry seal will be required. <br /> �7 +' <br /> O B. y P06 1 <br /> -rF— 06 <br /> PO4 P0801 <br /> 231f ®�i'� ,.F2}...- _ " 0,B-�°°� E3 3. New phasing for the entire intersection shall be assigned as shown on <br /> - _w _ & 06 the plans, and all conductors labeled accordingly. <br /> uc i ® E—06 or <br /> 6r 02� i 04 ec 07 I I 05 01 for 4. ped. Push Button signs shall conform to Standard Plan ES-5C. Contractor <br /> B 08 1 shall furnish new sign for all Ped. Push Button locations. <br /> T� f 3 -- 1 y P02 03 ' m4 do 08 01 & 05 05-JEXISTING SIGNAL R� c �'', OB 02 & O6 03 & 07 03 09 <br /> PLAN 02 & 05 <br /> ^` 03 & 08 <br /> LLJ <br /> PHASING DIAGRAM <br /> a \ ` <br /> o DRAWN BY DATE PROJECT ENGINEER DATE CHECKED DATE SUBMITTED DATE APPROVED DATE SHEET TOTAL <br /> n��ln� ¢�93 ,� COUNTY OF SAN JUA UIN SCALE TRAFFIC SIGNAL AND HIGHWAY MAIN STREET AND ORO AVENUE NO S►,EErs <br /> 4,93 '�^^ iy3f � — ���3 ' �' � ¢%�3 ;� �,� ��/, Q o 20� 40' LIGHTING MODIFICATIONS TRAFFIC SIGNAL MODIFICATION 4 6 <br /> FILE NAME DRAWER I SHEET NO. I ACAD <br /> D:\MAIN-ORO\SIGMOD.DWG <br />
The URL can be used to link to this page
Your browser does not support the video tag.