My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
M558 - M564
PublicWorks
>
VAULT MAPS
>
Large Plans - LP
>
Drawer M
>
M558 - M
>
M558 - M564
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2025 9:51:58 AM
Creation date
1/22/2016 6:48:46 PM
Metadata
Fields
Template:
Large Plans - LP
Project
Project Plans for Mountain House Parkway Resurfacing
Limits
500' south of Interstate 580 to 1,100' south of Interstate 205
Year
2003
Project Engineer
Jeff Levers
Roads Worked
Mountain House Pkwy.
Red Lines
Yes
Supplemental fields
Classification
Record Drawings
Cross Ref
M558 - M564
Type
Resurfacing
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
1' <br /> 83MV210 31AVN 3113 <br /> Construction <br /> Construction <br /> Limits of Cleari'g and Grubbing Limits of Clearing and Grubbing <br /> 30'-45' 12'-18' i 33'-66' <br /> 16'-55' 16'-17' <br /> 4' 0'-35' 12'-16' 12'-13' 4' Exist. romaMBGR or Bridge 4' <br /> Railing to remain in place. <br /> Exist. A.C. Dike to 24' Pavement Reinforcing Fabric Exist. A.C. Dike to Exist. Curb, Gutter, and I <br /> remain in place - remain in place. Sidewalk to remain in place. <br /> Sta. 42+56 to Sta. 43+56 I Existing Concrete <br /> _Var. _Var. I Var. r_ Var. _Var. r I median to <br /> `r. �r..� T - , - - \ remain in place. <br /> �'- ' 1 \ \ <br /> / \� /�� <br /> I <br /> 0.06' \ \ \ <br /> �- - - - - - - - - - - - - - - - - - - - - - <br /> - - - - 0.10' at Bridge Railing. Exist. Curb, Gutter, <br /> 0.10' at A.C. Dike. \ \ and Sidewalk to <br /> 0.10' - Sta. 42+56 to Sta. 43+56 0.25' Asphalt Concrete Existing Roadway 0.10' - Sta. 42+56 to Sta. 44+12 0.17' when adjacent to native shoulder. 0.17' Asphalt Concrete \ \ - remain in place. <br /> Var._ _ <br /> (Reduce to 0.04' in front of 0.06' - Sta. 44+12 to Sta. 45+60 Existing Roadway \ <br /> Asphalt Concrete Downdroin) Sta. 42+56 to Sta. 46+49 0.10' - Sta. 45+60 to Sta. 46+49 �'� <br /> 0.00' - Sta. 43+56 to Sta. 46+49 <br /> (Conform adjacent to Service Station Frontage) <br /> Sta. 58+06 to Sta. 63+50 - Right of rt Const. L- - - - - - - - - - - - - - - - - - 0.10' <br /> Sta. 58+34 to Sta. 63+50 - Left of Const. Existing Roadway o.f7' Asphalt Concrete <br /> Construction <br /> I � <br /> Limits of Clearing and Grubbing <br /> Construction <br /> 14'-55' 14'-16' <br /> Limits of Clearing and Grubbing <br /> 4'-10' 10'-45' 12' 2'-4' <br /> 28'-89' 16'-49' 4'-6' <br /> 24' Pavement Reinforcing Fabric Exist. A.C. Dike to <br /> I <br /> remain in place. 4' <br /> Var. <br /> -Var. I Var. ya�a 24' Pavement Reinforcing Fabric° 1' 4' 1' 12'-24' Pavement Reinforcing Fabric° <br /> NIXExist. Curb, Gutter, and <br /> Sidewalk to remain in place. <br /> 7- <br /> Vor. <br /> - � - � _Var.- •`••/• Va` Conform <br /> L - - - - - - - - - - - - - - - - -0.17' - StSta. 46+88 0.25' Asphalt Concrete Overlay Existing Roadway 0.10' - In front of existing A.C. <br /> Dike and 1-580 on ramp. <br /> 0.10' - Sta. 46+88 to Sta. 48+72 _ _ _ <br /> Sta. 46+49 to Sta. 48+72 °'10 - - - - - - J Shoulder Backing �yP ) <br /> 0.25' Asphalt Concrete <br /> Existing Roadway <br /> ° Pavement Reinforcing Fabric 0.25' Asphalt Concrete <br /> (sta. 67+00 to sta. 89+48) Sta. 63+50 to Sta. 89+48 <br /> N4t0; No Pavement Reinforcing Fabric between <br /> Station 51+10 to Station 67+00 <br /> Construction <br /> I q <br /> I <br /> Limits of Clearing and Grubbing <br /> Construction <br /> 24'-52' 24'-43'f <br /> I <br /> -Limits of Clearing and Grubbing and Mailbox Relocation <br /> 10'-25' a a 14'-42' 14'-33't 10' <br /> 4' 15'-28' ►I 15'-23' 4' <br /> 24' Pavement Reinforcing Fabric <br /> _Var. I Var. <br /> Var. - Var._ f <br /> Var. Var. Var. Conform <br /> L - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -� Conform r <br /> Existing Roadway 0.17' Asphalt Concrete 0.10' / - - \' \\ <br /> Sta. 51 +10 to Sta. 54+24 / Shoulder Backing \ <br /> (Typical) Existing Roadway 0.25' Asphalt Concrete <br /> This edge of pavement is: <br /> 1) 0.10' when adjacent to existing A.C. Dike or concrete bridge railing. <br /> 2) 0.06' in front of MBGR, also 1' away from face of roiling. Sta. 89+48 to Sta. 126+00 + <br /> 3) to conform with 0.10' Asphalt Concrete in the 1-580 "on-ramp' area. <br /> `'• � sem--3+}°Ii{•T+'¢ <br /> Construction <br /> I <br /> Limits of Clearing an Grubbing <br /> c GENERAL NOTES <br /> 32'-38' 10'-15' 33'-42' 0.10' L Const. 1. 0.25' Asphalt Concrete surfacing shall be placed in two (2) layers of <br /> '-38' 4' I approximate equal thickness. <br /> 4' 25'-31' 3' 1'� 29ty 4' Var. 2. Placement of Asphalt Concrete overlay shall not begin until the Asphalt <br /> Concrete used in Pavement Repair has been in place for 18 hours. <br /> Exist. A.C. Dike to Exist. MBGR 3. Shoulder Backing at all intersection radii shall be blended with the top 6" of <br /> remain in lace. or Bridge Conform Exist. A.C. Surface <br /> P I native soil material as directed by the Engineer. Payment for blending shall <br /> _Var. 1 Radmg• be considered as included in the contract unit price paid for Shoulder Backing. <br /> Var• 1 Exist. A C. Dike to <br /> �Z__ ------ __ ___________ 4. The contractor shall conduct Shoulder Backing operations so as not to disturb <br /> \ remain in place L -- ------ or obstruct any existing drainage. <br /> 0.- - - - - - - - - - - - - Var. - Vo_.a ` ----- ---- 5. All earthwork, except final grading of the shoulders, shall be completed prior to <br /> L - - - - _ _ _ - Grading Plane placing final layer of asphalt concrete. No Shoulder Backing shall be deposited <br /> or drifted on the final lift of asphalt concrete surfacing. <br /> 0.10'• Existing Roadway 0.17' Asphalt Concrete I I LONGITUDINAL PLANING DETAIL 6. All existing frontage improvements shall remain in place unless otherwise noted. <br /> • 0.10' when adjacent to Bridge Railing. L - - - - - - -=- - - -J 0.10' <br /> Existing Roadway 0.17' Asphalt Concrete <br /> Sta. 54+24 to Sta. 56+03 - Left of Const. <br /> Ul Sta. 54+24 to Sta. 56+46 - Right of Const. <br /> SHEET TOTAL <br /> DRAWN BY DATE PROJECT ENGINEER DATE CHECKED DATE APPROVAL RECOMMENDED DATE <br /> COUNTY OF SAN JOAQUIN NO SCALE TYPICAL SECTIONS MOUNTAIN HOUSE PARKWAY RESURFACING NO. SHEETS <br /> *j/p,3 3�ZI 1 a3 07 j� �d 3,Izole / GENERAL NOTES :1(500' south of Interstate 580 to 1,100' south of Interstate 205) 2 7 <br /> C <br /> FILE NAME DRAWER SHEET NO. ACAD REVISIONS DATE <br />
The URL can be used to link to this page
Your browser does not support the video tag.