My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Q015 - Q020
PublicWorks
>
VAULT MAPS
>
Large Plans - LP
>
Drawer Q
>
Q001 thru Q020
>
Q015 - Q020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/8/2016 3:26:24 PM
Creation date
1/22/2016 7:16:12 PM
Metadata
Fields
Template:
Improvement Plans
Supplemental fields
DocCategory
Improvement Plans
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
STORM WATER POLLUTION PREVENTION PLAN TEMPORARY STABILIZED CONSTRUCTION ENTRANCE GENERAL: <br /> THE ENTRANCE SHALL BE MAINTAINED IN A CONDITION THAT WILL PREVENT TRACKING OR I. A CONSTRUCTION ENTRANCE SHALL BE INSTALLED PRIOR TO COMMENCEMENT OF GRADING. LOCATION OF <br /> WITH THE EXCEPTION OF PROPERLY DESILTED AND pH NEUTRALIZED WATER FROM SITEFLOWING OF SEDIMENT ONTO PUBLIC RIGHT-0F-WAYS. THIS MAY REQUIRE PERIODIC TOP THE ENTRANCE MAY BE ADJUSTED BY THE CONTRACTOR TO FACILITATE GRADING OPERATIONS. ALL <br /> DEWATERING, THE CONTRACTOR SHALL NOT 015CHARCE ANY MATERIALS AND/OR LIQUIDS DRESSING WITH ADDITIONAL STONE AS CONDITIONS DEMAND, AND REPAIR AND/OR CLEANOUT CONSTRUCTION TRAFFIC ENTERINb THE PAVED ROAD MUST CROSS THE CONSTRUCTION ENTRANCE. <br /> TO THE STORM DRAINAGE SYSTEM. ACTIVITIES OF PARTICULAR CONCERN ARE: OF ANY MEASURES USED TO TRAP SEDIMENT. ALL SEDIMENT SPILLED, DROPPED, WASHED, 2. CHANGES TO TH15 EROSION AND SEDIMENT CONTROL PLAN TO MEET FIELD CONDITIONS SHALL BE MADE <br /> OR TRACKED ONTO PUBLIC RIGHT-0F-WAYS WILL BE REMOVED IMMEDIATELY. WHEN ONLY WITH THE APPROVAL OF, OR AT THE DIRECTION OF THE COUNTY ENGINEER. DURING THE RAINY SEASON, <br /> A. CONTRACTOR SHALL DESIGNATE A CONCRETE TRUCK GLEAN-OUT AREA. COUNTY NECESSARY, WHEELS SHALL BE GLEANED TO REMOVE SEDIMENT PRIOR TO ENTRANCE PUBLIC ROADWAY SHALL BE KEPT CLEAR OF EARTH MATERIAL AND DEBRIS. <br /> INSPECTOR APPROVED BEST MANAGEMENT PRACTICES SHALL AT ALL TIMES BE FULLY ONTO PUBLIC RIGHT-OF-WAYS. THE SITE SHALL BE MAINTAINED 50 THAT A MINIMUM OF SEDIMENT LADEN RUNOFF ENTERS THE STORM <br /> IMPLEMENTED AT AND AROUND THE GLEAN-OUT AREA. DRAINAGE SYSTEM AND PUBLIC ROADWAY. THIS PLAN COVERS ONLY THE FIRST WINTER FOLLOWING <br /> B. TACK GOAT AND PRIME GOAT ASPHALTS SHALL BE CAREFULLY SPRAYED AND ANY GsRADTEMPORARY STRAW BALE DIKE AROUND INLETS SUBSEIQUENTLANS SHALL BE RESUBMITTED YEAR UNTIL THE PROPOSED IMPOR ROVEMENTS ARSE ICOMPLETED. <br /> TO E�BER IST OF EACH <br /> EXCESS MATERIAL SPILLED SHALL BE GLEANED UP IMMEDIATELY BY PROPER <br /> METHODS. I. BALES SHALL BE PLACED WITH ENDS TIGHTLY ABUTTING AROUND INLETS. 3. CONTROL MEASURES SHALL BE INSPECTED AND REPAIRED AT THE END OF EACH WORKING DAY AND, IN <br /> G. ALL EQUIPMENT REFUELING IN THE PROJECT AREA SHALL BE GAREFULY DONE TO 2. EACH BALE SHALL BE EMBEDDED IN THE SOIL 4 INCHES IF IT IS INSTALLED ADDITION, AFTER EACH STORM. <br /> AVOID SPILLAGE. ANY SPILLS SHALL BE CONTAINED AND GLEANED UP IMMEDIATELY OVER SOIL. <br /> IN ACCORDANCE WITH STATE AND LOCAL REQUIREMENTS. ALL FUELING VEHICLES <br /> SHALL BE EQUIPPED WITH SPILL CLEANUP MATERIALS AND EQUIPMENT. 3. BALES SHALL BE SECURELY ANCHORED IN PLACE BY TWO STAKES OF REBARS <br /> D. CONTRACTOR SHALL CONTROL AND PROPERLY DISPOSE OF ALL LIQUIDS DURING DRIVEN THROUGH THE BALES IF INSTALLED OVER SOIL. THE FIRST STAKE IN EACH <br /> BALE SHALL BE DRIVEN TOWARD THE PREVIOUSLY LAID BALE TO FORGE THE BALES <br /> SAWCUTTING ACTIVIES. TOGETHER. <br /> 4. THE DIKE SHALL BE INSPECTED AFTER EACH STORM AND REPAIRS OR REPLACEMENT SHALL <br /> BE MADE PROMPTLY,AS NEEDED. <br /> GRAVEL AND WIRE MESH FILTER 5. BALES SHALL BE REMOVED WHEN THEY HAVE SERVED THEIR PURPOSE 50 AS NOT TO <br /> I. PLACE A WIRE MESH OVER THE DROP INLET 50 THAT THE WIRE EXTENDS A MINIMUM OF BLOCK OR IMPEDE STORM FLOW OR DRAINAGE. <br /> I FOOT BEYOND EACH SIDE OF THE INLET STRUCTURE. IF MORE THAN ONE STRIP IS <br /> NECESSARY, OVERLAP THE STRIPS. PLACE FILTER FABRIC OVER WIRE MESH. <br /> 2. PLACE 3/4 TO 3 INCH GRAVEL OVER THE FILTER FA IRIC/WIRE MESH. THE DEPTH OF THE <br /> GRAVEL SHOULD BE AT LEAST 12 INCHES OVER THE ENTIRE INLET OPENING. <br /> 2 REBARS, STEEL PIG <br /> OR 2"x2" STAKES 1.5' TO 2' <br /> IN GROUND <br /> ANGLE STAKES TOWARDS <br /> B ' B ADJACENT BALE <br /> 5TRAW BALES STAKED <br /> 2"x4"-4' LONG (OR WITH TWO STAKES PER CATCH BASIN ick <br /> 2"x2" WOOD POST, STANDARD OR BETTER <br /> #b REBAR 4' LONG STAKED AND ENTRENCHED BALE. SEE DETAILS I WIRE OR NYLON BOUND <br /> IF WOOD WILL NOT STRAW BALE AND 3 THI5 SHEET 8 END AND SIDE OVERLAP BALLS PLACED ON THE <br /> PENETRATE GROUND) AT CORNERS <br /> (2 PER BALE) CONTOUR FILTERED FABRIC MATERIAL 36" WIDE <br /> ROLLS STAPLED TO POST (TYP) <br /> BINDING WIRE OR TWINE iv it <br /> COMPACTED 501L TO B B �— \ FILTER FABRIC <br /> PREVENT PIPING _— N MATERIAL n <br /> FILTERED RUNOFF —� �� 4" VERTICAL FLOW <br /> SEDIMENT LADEN FACE 1 III-11 -1111—I =1 1 -11 —I —I I1=11 -III=III=111 <br /> =III= _ <br /> RUNOFF CATCH BASIN =n it —i —i n—i n n—i n-i ni n—iTi=iii—iTi—iii-iii—i n—iI I n -� <br /> Tr �� I1— BACKFILL d COMPACT <br /> BURY BOTTOM OF FILTER <br /> I II I THE EXCAVATED SOIL — <br /> U MATERIAL IN 4x4 TRENCH U <br /> ' t MAX. IN TRENCH AND ON <br /> 8 <br /> / BOTH SIDES OF FILTER 8„ <br /> 4” MIN. FENCE FABRIC. SET <br /> FILTER FABRIC INTO <br /> SOIL. <br /> STRAW BALE CATCH BASIN STRAW BALE OR FIBER ROLLS SECTION <br /> 5TRAW BALE DETAIL SEDIMENT BARRIER DIKE DETAIL SILT FENCE DETAIL <br /> N.T.S. N.T.S. N.T.S. 4 N.T.5. <br /> PURPOSE: TEMPORARY INLET FILTER LOWERED INTO CATCH BASINS AND HELD IN <br /> PLACE BY THE bRAT£. DESIGNED TO IMPROVE THE QUALITY OF THE <br /> WATER BEING DISCHARGED TO INLETS OR CATCH BASINS BY FILTERING <br /> SILT AND SEDIMENT FROM RUNOFF. <br /> APPLICATION: • CONSTRUCTION SITES WITH DISTURBED OR UNVEGETATED AREAS <br /> WHERE SEDIMENT LADEN WATER CAN ENTER CATCH BASINS OR <br /> INLETS. <br /> 3/4" TO 3" GRAVEL M BER ROLLS • WHERE POLLUTION OF WATERCOURSES OR DRAINAGE 5Y5TEM <br /> (12" MIN. DEPTH) WIRE MESH (1/2" OPENINGS) CLO661N6 FROM SEDIMENT LADEN STORM WATER 15 A CONCERN. <br /> NO RUNOFF WATER WOODEN STAKE <br /> MIN, W/ SEDIMENT W/ FILTER FABRIC ON TOP FIBER ROLLS ARE PREFERABLEE AND IS A GOOD LIMITATIONS: • SHOULD BE USED ONLY AS A SECONDARY SEDIMENT CONTROL <br /> 000000000 o ALTERNATIVE TO HAY BALES INCLUDING SILT SEDIMENT ROLL IN CONJUNCTION WITH PRIMARY EROSION CONTROL MEASURES <br /> y °o FENCE IN ALM05T EVERY 51TUATION SUCH AS HYDROSEEDING/HYDROMULCHINS, OR EROSION CONTROL <br /> �i+\ °000°ooa°oo°°oo°°o�pOo°° <br /> 000000000°000°000°0o°°oOp Ooo <br /> 00000°oo°°°op°000 0000°000°000°000000 BLANKETS <br /> 0°000°oo°°00°000°°00 =III;III II=III=III= <br /> 0 0 0 00 0 0 0 00 0o III °o i��— FINISHED GRADE <br /> oo°oo°oo°0000000000p00000°°0000°°0 0 INSTALLATION: : REMOVE DRAIN GRATE „ <br /> fi <br /> 0 00 0 0 000o000 000 000 000 0°° 00° 000 00 o J ° PLACE ROLLS INTO KEY TRENCH 3 INCHES DEEP o <br /> Jl�� INSERT CATCH BASIN FILTER INTO BASIN LEAVING 3 FLAP EXPOSED <br /> 0 00 o0°Ooo°°oo°OoOpOo°poo°°o°000000 00 _ 111 <br /> 0 0p00 0 Doo p00000 oop00oO 000 oo 0000000000000 <br /> SEDIMENT PLACE EXCAVATED SOIL ON UPHILL OR FLOW • REPLACE GRATE TO BASIN THEREBY PINCHING FABRIC BETWEEN <br /> 'o 00000 0 00000000000000000000000000000 ° °oo <br /> SIDE OF THE ROLL 3 GRATE AND GATGH BASIN AND HOLDING FILTER IN PLACE <br /> n o0 0°000 °Op Oo°0000 0000 0°00� o°o°O)Ooo�0 <br /> I-I/2 GRAVEL o 00 0 0 00 0 0°0 0 0°0 0 0 0 0 00 0 0 0° ROLLS SHOULD BE ABUTTED AT THE ENDS, NOT <br /> 000000 0 0°000000 0000° 000 INSPECTION d • INSPECT CATCH BASIN FILTERS WEEKLY AND AFTER EVERY <br /> 0 000o0000000��000 OVERLAPPED '> MAINTENANCE: RAIN EVENT <br /> 0 <br /> 00 0°°° P� � ALTERNATE STAKES ON BOTH SIDES OF THE ROLL ENTRENCHMENT DETAIL • EMPTY CATCH BASIN FILTERS WHEN FILTERS APPEAR TO BE <br /> b' MIN. EVERY b INCHES IN FLAT AREA HALF FULL <br /> • DISPOSE OF TRAPPED SEDIMENT IN ACCORDANCE WITH LOCAL <br /> FILTERED WATER REGUIR• CLEAN AND REUSE INLET FILTERS OR DISCARD AND REPLACE <br /> GRAVEL CONSTRUCTION ENTRANCE GRAVEL AND WIRE MESH FILTER FOR DRAIN INLET �..7� FIBER ROLLS GRATE AS NECESSARY. <br /> •J N.T.S. N.T.S. I N.T.S. � a CATCH BASIN INLET FILTERS <br /> 9 r <br />�... N. .5. <br /> ` Htuv�1 ►L) L)H 1YVIIN ` FILTER <br /> c4ffodkNO CIIeI1Qos BPV <br /> ���p dl�wir�p Should DON ve... <br /> CATCH BASIN <br /> MMf1111 ftI BV k"Dectfno Thp III <br /> REVISIONS JOB NO, : 00647P5 Q QBOTEFS/O D M M D <br /> N0. DESCRIPTION DATE BY DATE : � i .-' 1 ���NEST F. SI�UI IT I� c �o �M EMU <br /> SHEET <br /> �` QUASHNICK ROAD <br /> SCALE HORIZ. : a�s�Tz ` �' 221 WEST OAK STREET, SUITE B-2 PHONE (los) 334-6523 <br /> SCALE VERT. : LODI, CALIFORNIA 95240 IMPROVEMENTS <br /> DRAWN KD 9 OF CALL ODATE: Co-- I l— 03 OF 6 <br /> — <br /> DESIGN : EFS R.C.E. NO.: 15372 EROSION CONTROL PLAN <br /> CHECK EFS E. F. SMITH, DESIGN ENGINEER EXP. DATE: 3-31 -05 FILE NO. 00647P5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.