Laserfiche WebLink
1 . All improvements shall be done in accordance with the requirements of the county of <br /> m <br /> San Joaquin Improvement Specifications and Standards, the latest edition of the <br /> o <br /> State of California Department of Transportation, Division of Highways, Standard Specifications, 22. Excavations of 5 feet or more in depth will require an excavation permit from the state <br /> of California department of industrial safety. For trenches 5 feet of more in depth, the <br /> and the special provisions. contractor shall comply with section 5-1 .20a of the Caltrans standards, chapter 9 of the <br /> 2. It is noted that these plans and specifications require all labor and materials necessary state of excavation permit to be kept on site. <br /> and proper for the work contemplated and that the work be completed in accordance with their 23. We call your attention to title 8 California administration code section 1540 (a) (1 ) <br /> true intent and purpose. The contractor shall notify the engineer immediately regarding any <br /> discrepancies and ambiguities, which may exist in the plans and specifications. If the of the construction safety orders issued by the occupational safety and health standards C/�board pursuant to the California occupations safety and health act of 1973 as amended which <br /> plans or specifications describe portions of the work in general terms but not in complete O � <br /> detail, it is understood that only the best general practice is to prevail and that only states: (1) Prior to opening an excavation effort shall be made to determine whether \ <br /> materials and workmanship of the first quality are to be used. underground installation; i.e. sewer, water, fuel, electrical lines, etc. will be a <br /> encountered and if so, where such underground installations are located. When the <br /> 3. Construction staking for grading, curb, gutter, sidewalk, sanitary sewer, storm drain and excavation approaches the approximate location of such installation, the exact location � o <br /> water shall be done under the direction of Omni-Means, Ltd. The contractor shall notify shall be determined by careful probing or hand digging; and, when it is uncovered, adequate <br /> the engineer seventy-two (72) hours in advance of this need for staking. Any staking protection shall be provided for the existing installation. All known owners of <br /> requested by the contractor or his subcontractors that is above and beyond normal standard underground facilities in the area concerned shall be advised of proposed work at least 48 <br /> roadway staking needs, will be subject to an extra back charge to the contractor. hours prior to the start of actual excavation. <br /> 4. The contractor shall exercise due caution and shall carefully preserve benchmarks, 24. All trenches on major and collector streets and across trenches on all streets shall be <br /> reference points and all survey stakes, and shall bear all expense for replacement and/or paved with temporary paving the some day the pavement cut is made. <br /> errors caused by their unnecessary loss or disturbance. <br /> 25. Appropriate dust control shall be provided, at the contractor's expense to minimize any <br /> dust nuisance and shall be in accordance with section 10 of Caltrans standard s P ecifications 2 <br /> 5. Contractor agrees that he shall assume sole and complete responsibility for job site <br /> conditions during the course of construction of this project, including safety of all and the requirements of San Joaquin County. <br /> persons and property, that this requirement shall apply continuously and not be limited to <br /> 26. The contractor shall submit to San Joaquin County prior to final acceptance, record drawings Q o <br /> normal working hours; and that the contractor shall defend, identify and hold the owner, � o <br /> engineer and the county harmless from any and all liability, real or alleged, in connection of all improvements represented by the project plans and specifications. <br /> with the performance of work on this project, excepting for liability arising from the sole am° <br /> negligence of the owner or the engineer. 27. After construction of all improvements, the contractor shall submit one set of 0 0 0 0 0 <br /> 6. Unless otherwise stated, all stations indicated on the improvement plans are referenced reproducible plans. Final invert elevations for sewer and storm drain lines that are to <br /> be extended for future s all as <br /> to the centerline of the street. All stations off center are perpendicular to or radially enure construction sl also be shown on the record drawings <br /> opposite centerline stations, unless otherwise noted. provided to San Joaquin County by the contractor. W <br /> Q z opo <br /> 7. The contractor shall be held responsible for any field changes made without written 28. The contractor shall notify Omni-Means, Ltd. at least 48 hours prior to backfilling of <br /> authorization from the approving agency. any pipe, which stubs to a future phase of construction for invert verification. Tolerance o <br /> shall be in accordance with San Joaquin County improvements standards and specifications. a o <br /> 8. The contractor shall provide all lights, signs, barricades, flagman or other devices W � <br /> necessary for public safety in accordance with the current issue of manual of traffic 29• All manholes, vaults, DI's and water valve castings and covers shall be adjusted to finish $� <br /> rade b the paving contractor after street improvements are completed. All manhole testing, <br /> controls, warning signs, lights and devices for use in performance of work upon highway g y P 9 P P W m <br /> published by the state of California business and transportation agency. as required by the county, shall be performed at the contractors expense. <br /> 9. San Joaquin County Public Works Department and shall be notified at least 24 30. Compaction Tests: Contractor to provide compaction tests in streets as required %' <br /> hours in advance of any work. by San Joaquin County, at the contractors expense. Q W I <br /> 10. P. G. & E. Telephone and cable TV underground work shall be completed prior to 31 . Prior to any corrective action, by the contractor, which is necessary due <br /> construction of the curb, gutter, sidewalk and paving. to alleged staking error, the contractor shall notify Omni-Means, Ltd. for restaking <br /> and verification of previous staking. Should any corrective work be done prior to <br /> 11. San Joaquin County, associated utility companies, residencies and businesses to be affected notification, or if the original staking is done by others, Omni-Means, Ltd. assumes <br /> shall be notified immediately upon any utility service disruption other than those specified on these no liabilities for the costs incurred for this work. Where it is determined that any <br /> improvement plans and a 24 hour notice shall be given for any planned disruption. corrective action will require financial participation by Omni-Means, Ltd., that amount <br /> shall be agreed upon in writing prior to taking of corrective action. Failure to obtain <br /> written acceptance from Omni-Means, Ltd. will negate all requirements of <br /> 12. The contractor shall obtain an encroachment permit from San Joaquin County, Department financial assistance for corrective work. <br /> of Public Works or any other applicable agencies prior to commencement of work within <br /> existing county right-of-way and an encroachment permit from Caltrans for work in the 32. Omni-Means, Ltd. has exercised reasonable and acceptable standards of care in <br /> highway right-of-way. The contractor shall be responsible for all permits and licenses preparation of these plans. However, the design process <br /> required for the construction and completion of the project. includes activities that occur after plan signature. These activities <br /> include calculation, plan check and verifications during construction. Should Q <br /> 13. All traffic street signs and pavement markings shall conform to San Joaquin County persons, other than Omni-Means, Ltd., perform the construction staking Z Z <br /> improvement standards and to the manual on uniform traffic control devices (Caltrans) and operations, they shall indemnify Omni-Means, Ltd. from any damages <br /> as shown on the plans. resulting from failure to perform those tasks or any expense or damage W W <br /> resulting from the omission or error contained in the plans which would 0 <br /> 14. Asphalt concrete shall be placed only when the atmospheric temperature is above 50•. reasonably have been discovered and corrected had Omni-Means done 0 <br /> the construction staking. Z <br /> 15. Contractor is responsible for coordination of the removal or relocation of all existing <br /> U. <br /> �1 Q <br /> utilities with respective utility companies. 33. INDEMNITY CLAUSE.--Contractor agrees to assume sole and complete responsibility for (n J W U <br /> job site conditions during the course of construction of this project, including safety of all <br /> 16. Drawing numbers shown on the plans refer to drawings contained in the San Joaquin County persons and property, this requirement shall apply continuously and not be limited to Q Q <br /> improvement standards, (i.e. dwg. S-7), unless otherwise noted. normal working hours; and that the Contractor shall defend, indemnify and hold harmless J W 0 } <br /> the County of San Joaquin, its elected officials, officers, employees, and agents from anya , Z Z <br /> 17. Prior to commencing any work, it shall be the contractor's responsibility to have each and all claims, costs of litigation, damages, and attorney's fees, for personal injury or <br /> utility company locate, in the field, their main and service lines. The contractor shall property damage of whatever nature which are claimed to have occurred during the termZ 1 71 <br /> 0 <br /> notify members of the underground service alert (U.S.A.) 48 hours in advance of performing of this project. <br /> any excavation work by calling the toll-free number (800) 642-2444. The contractor shall L W IM V <br /> record the U.S.A order number and furnish order number to owner prior to any excavation. W Z <br /> W <br /> It shall be the contractor's sole responsibility to protect all existing utilities so that a: Z Z <br /> no damage results to them during the performance of this contract. Any repairs necessary � 0 <br /> LU <br /> to damaged utilities shall be paid for by the contractor. The contractor shall be required <br /> to structures, utilities and service to the development. o '^ Q <br /> 18. The contractor shall be responsible for protecting existing improvements from damage. 0 <br /> 19. A traffic control plan (TCP) shall be submitted to and deemed acceptable by county prior to Q Z <br /> start of work. This shall address all phased of work which impact public traffic. Q <br /> Conformance with the TCP shall be maintained at all times. A minimum of one 10' traffic <br /> lane shall be maintained at all times, with traffic delays limited to a maximum of 15 <br /> minutes. A minimum of two 10' traffic lanes shall be maintained during non-working hours. <br /> Traffic control shall be in accordance with section 12 of the Caltrans standard <br /> specifications. All pavement cuts shall be neatly line cut. Pavement restoral for <br /> longitudinal trenches shall not result in a "cold joint" within three feet of an existing <br /> edge of pavement (i.e. no "ribbon patches"). <br /> 20. Whenever pavement is broken or cut in the installation of the work covered by these <br /> specifications, the pavement shall be replaced, after proper backfilling, with pavement <br /> materials equal to or better than the materials used in the original paving. The finished <br /> SCALE NONE <br /> pavement shall e subject to the approval of San Joaquin Pubic Works Department, or <br /> JOB NO. 25-3177-01 <br /> Caltrans where applicable. See the Special Provisions. <br /> DESIGNED CSN <br /> WN CAS <br /> 21. Payment for pavement will be made only for areas shown on the plans. Replacement of DRADRAOWG <br /> pavement which is broken or cut during the installation of the work covered by these FILE QRpFESs/oN CHECKED 040C15.15. <br /> specifications, and which lies outside of said areas, shall be included in the contractor's O C E£ 5 RG 00 <br /> unit price for pavement, and no additional payment shall be made for such work. See <br /> the Special Provisions. G, SHEET No. <br /> zC1w m <br /> No. M <br /> a Exp OS' (•O • <br /> rT CIVIL �P <br /> 9TH OF CAL�F��� DF 12 <br /> S400-3 l C.p <br />