| 1 .  All  improvements  shall  be  done  in  accordance  with  the  requirements  of  the  county  of
<br />    																																																																																						m
<br />      				San  Joaquin  Improvement  Specifications  and  Standards,  the  latest  edition  of  the
<br />    																																																																																						o
<br />      				State  of  California  Department  of  Transportation,  Division  of  Highways,  Standard  Specifications,     				22.  Excavations  of  5  feet  or  more  in  depth  will  require  an  excavation  permit  from  the  state
<br /> 																																of  California  department  of  industrial  safety.     For  trenches  5  feet  of  more  in  depth,  the
<br />      				and  the  special  provisions. 																					contractor  shall  comply  with  section  5-1 .20a  of  the  Caltrans  standards,  chapter  9  of  the
<br />      				2.  It  is  noted  that  these  plans  and  specifications  require  all  labor  and  materials  necessary   					state  of  excavation  permit  to  be  kept  on  site.
<br />      				and  proper  for  the  work  contemplated  and  that  the  work  be  completed  in  accordance  with  their 				23.  We  call  your  attention  to  title  8  California  administration  code  section  1540  (a)  (1 )
<br />      				true  intent  and  purpose.     The  contractor  shall  notify  the  engineer  immediately  regarding  any
<br />      				discrepancies  and  ambiguities,  which  may  exist  in  the  plans  and  specifications.     If  the     						of  the  construction  safety  orders  issued  by  the  occupational  safety  and  health  standards      																															C/�board  pursuant  to  the  California  occupations  safety  and  health  act  of  1973  as  amended  which
<br />      				plans  or  specifications  describe  portions  of  the  work  in  general  terms  but  not  in  complete       																																																										O   �
<br />      				detail,  it  is  understood  that  only  the  best  general  practice  is  to  prevail  and  that  only     						states:   (1)  Prior  to  opening  an  excavation  effort  shall  be  made  to  determine  whether     																																\
<br />      				materials  and  workmanship  of  the  first  quality  are  to  be  used.  												underground  installation;   i.e.  sewer,  water,  fuel,  electrical  lines,  etc.  will  be   																																				a
<br /> 																																encountered  and  if  so,  where  such  underground  installations  are  located.     When  the
<br />      				3.  Construction  staking  for  grading,  curb,  gutter,  sidewalk,  sanitary  sewer,  storm  drain  and    					excavation  approaches  the  approximate  location  of  such  installation,  the  exact  location   																																�   o
<br />      				water  shall  be  done  under  the  direction  of  Omni-Means,  Ltd.     The  contractor  shall  notify      					shall  be  determined  by  careful  probing  or  hand  digging;   and,  when  it  is  uncovered,  adequate
<br />      				the  engineer  seventy-two  (72)  hours  in  advance  of  this  need  for  staking.     Any  staking   						protection  shall  be  provided  for  the  existing  installation.     All  known  owners  of
<br />      				requested  by  the  contractor  or  his  subcontractors  that  is  above  and  beyond  normal  standard      				underground  facilities  in  the  area  concerned  shall  be  advised  of  proposed  work  at  least  48
<br />      				roadway  staking  needs,  will  be  subject  to  an  extra  back  charge  to  the  contractor.    							hours  prior  to  the  start  of  actual  excavation.
<br />      				4.  The  contractor  shall  exercise  due  caution  and  shall  carefully  preserve  benchmarks,       						24.  All  trenches  on  major  and  collector  streets  and  across  trenches  on  all  streets  shall  be
<br />      				reference  points  and  all  survey  stakes,  and  shall  bear  all  expense  for  replacement  and/or      					paved  with  temporary  paving  the  some  day  the  pavement  cut  is  made.
<br />      				errors  caused  by  their  unnecessary  loss  or  disturbance.
<br /> 																																25.  Appropriate  dust  control  shall  be  provided,  at  the  contractor's  expense  to  minimize  any
<br /> 																																dust  nuisance  and  shall  be  in  accordance  with  section  10  of  Caltrans  standard  s P ecifications       																															2
<br />      				5.  Contractor  agrees  that  he  shall  assume  sole  and  complete  responsibility  for  job  site
<br />      				conditions  during  the  course  of  construction  of  this  project,  including  safety  of  all    							and  the  requirements  of  San  Joaquin  County.
<br />      				persons  and  property,   that  this  requirement  shall  apply  continuously  and  not  be  limited  to
<br /> 																																26.  The  contractor  shall  submit  to  San  Joaquin  County  prior  to  final  acceptance,  record  drawings    																														Q   o
<br />      				normal  working  hours;   and  that  the  contractor  shall  defend,  identify  and  hold  the  owner,  																																																														�   o
<br />      				engineer  and  the  county  harmless  from  any  and  all  liability,  real  or  alleged,  in  connection      					of  all  improvements  represented  by  the  project  plans  and  specifications.
<br />      				with  the  performance  of  work  on  this  project,  excepting  for  liability  arising  from  the  sole																																																												am°
<br />      				negligence  of  the  owner  or  the  engineer.     																	27.  After  construction  of  all  improvements,  the  contractor  shall  submit  one  set  of																																		0  0  0  0  0
<br />      				6.  Unless  otherwise  stated,  all  stations  indicated  on  the  improvement  plans  are  referenced    					reproducible  plans.     Final  invert  elevations  for  sewer  and  storm  drain  lines  that  are  to
<br /> 																																be  extended  for  future     													s  all  as
<br />      				to  the  centerline  of  the  street.     All  stations  off  center  are  perpendicular  to  or  radially       							enure  construction  sl  also  be  shown  on  the  record  drawings
<br />      				opposite  centerline  stations,  unless  otherwise  noted.       														provided  to  San  Joaquin  County  by  the  contractor.       																																										W
<br /> 																																																																																						Q  z  opo
<br />      				7.  The  contractor  shall  be  held  responsible  for  any  field  changes  made  without  written    						28.  The  contractor  shall  notify  Omni-Means,  Ltd.  at  least  48  hours  prior  to  backfilling  of
<br />      				authorization  from  the  approving  agency.     																	any  pipe,  which  stubs  to  a  future  phase  of  construction  for  invert  verification.     Tolerance																																		o
<br /> 																																shall  be  in  accordance  with  San  Joaquin  County  improvements  standards  and  specifications.       																																a     o
<br />      				8.  The  contractor  shall  provide  all  lights,  signs,  barricades,  flagman  or  other  devices																																																														W	�
<br />      				necessary  for  public  safety  in  accordance  with  the  current  issue  of    manual  of  traffic     						29•     All  manholes,  vaults,  DI's  and  water  valve  castings  and  covers  shall  be  adjusted  to  finish  																																	$�
<br />   																																rade  b    the  paving  contractor  after  street  improvements  are  completed.     All  manhole  testing,
<br />      				controls,  warning  signs,  lights  and  devices  for  use  in  performance  of  work  upon  highway						g    	y  	P       9    						P     				P     																																						W  	m
<br />      				published  by  the  state  of  California  business  and  transportation  agency. 										as  required  by  the  county,  shall  be  performed  at  the  contractors  expense.
<br />      				9.  San  Joaquin  County  Public  Works  Department  and  shall  be  notified  at  least  24      							30.     Compaction  Tests:     Contractor  to  provide  compaction  tests  in  streets  as  required  																																			%'
<br />     				hours  in  advance  of  any  work. 																				by  San  Joaquin  County,  at  the  contractors  expense.     																																									Q  W  	I
<br />     				10.  P.  G.  &  E.  Telephone  and  cable  TV  underground  work  shall  be  completed  prior  to      						31 .     Prior  to  any  corrective  action,  by  the  contractor,  which  is  necessary  due
<br />     				construction  of  the  curb,  gutter,  sidewalk  and  paving.    														to  alleged  staking  error,  the  contractor  shall  notify  Omni-Means,  Ltd.  for  restaking
<br />																																and  verification  of  previous  staking.     Should  any  corrective  work  be  done  prior  to
<br />     				11.  San  Joaquin  County,  associated  utility  companies,  residencies  and  businesses  to  be  affected  				notification,  or  if  the  original  staking  is  done  by  others,  Omni-Means,  Ltd.  assumes
<br />     				shall  be  notified  immediately  upon  any  utility  service  disruption  other  than  those  specified  on  these   			no  liabilities  for  the  costs  incurred  for  this  work.     Where  it  is  determined  that  any
<br />     				improvement  plans  and  a  24  hour  notice  shall  be  given  for  any  planned  disruption.   							corrective  action  will  require  financial  participation  by  Omni-Means,  Ltd.,  that  amount
<br />																																shall  be  agreed  upon  in  writing  prior  to  taking  of  corrective  action.     Failure  to  obtain
<br />																																written  acceptance  from  Omni-Means,  Ltd.  will  negate  all  requirements  of
<br />     				12.  The  contractor  shall  obtain  an  encroachment  permit  from  San  Joaquin  County,  Department    				financial  assistance  for  corrective  work.
<br />     				of  Public  Works  or  any  other  applicable  agencies  prior  to  commencement  of  work  within
<br />     				existing  county  right-of-way  and  an  encroachment  permit  from  Caltrans  for  work  in  the						32.    Omni-Means,  Ltd.  has  exercised  reasonable  and  acceptable  standards  of  care  in
<br />     				highway  right-of-way.     The  contractor  shall  be  responsible  for  all  permits  and  licenses   						preparation  of  these  plans.     However,  the  design  process
<br />     				required  for  the  construction  and  completion  of  the  project.													includes  activities  that  occur  after  plan  signature.     These  activities
<br /> 																																include  calculation,  plan  check  and  verifications  during  construction.     Should     																																						Q
<br />     				13.  All  traffic  street  signs  and  pavement  markings  shall  conform  to  San  Joaquin  County 						persons,  other  than  Omni-Means,  Ltd.,  perform  the  construction  staking       																																					Z       Z
<br />     				improvement  standards  and  to  the  manual  on  uniform  traffic  control  devices  (Caltrans)  and  					operations,  they  shall  indemnify  Omni-Means,  Ltd.  from  any  damages
<br />     				as  shown  on  the  plans.       																					resulting  from  failure  to  perform  those  tasks  or  any  expense  or  damage      																																					W       W
<br />																																resulting  from  the  omission  or  error  contained  in  the  plans  which  would     																																							0
<br />     				14.  Asphalt  concrete  shall  be  placed  only  when  the  atmospheric  temperature  is  above  50•.     					reasonably  have  been  discovered  and  corrected  had  Omni-Means  done      																																				0
<br />																																the  construction  staking.   																																																	Z
<br />     				15.  Contractor  is  responsible  for  coordination  of  the  removal  or  relocation  of  all  existing
<br />      																																																																																					U.
<br />   																																																																																							�1 	Q
<br />     				utilities  with  respective  utility  companies.     																	33.     INDEMNITY  CLAUSE.--Contractor  agrees  to  assume  sole  and  complete  responsibility  for   																															(n       J W U
<br />																																job  site  conditions  during  the  course  of  construction  of  this  project,  including  safety  of  all
<br />     				16.  Drawing  numbers  shown  on  the  plans  refer  to  drawings  contained  in  the  San  Joaquin  County 				persons  and  property,   this  requirement  shall  apply  continuously  and  not  be  limited  to																																	Q       Q
<br />     				improvement  standards,  (i.e.  dwg.  S-7),  unless  otherwise  noted.												normal  working  hours;   and  that  the  Contractor  shall  defend,  indemnify  and  hold  harmless 																																J	W 0 }
<br />																																the  County  of  San  Joaquin,  its  elected  officials,  officers,  employees,  and  agents  from  anya     	, Z Z
<br />     				17.  Prior  to  commencing  any  work,  it  shall  be  the  contractor's  responsibility  to  have  each      					and  all  claims,  costs  of  litigation,  damages,  and  attorney's  fees,  for  personal  injury  or
<br />     				utility  company  locate,  in  the  field,  their  main  and  service  lines.     The  contractor  shall      						property  damage  of  whatever  nature  which  are  claimed  to  have  occurred  during  the  termZ  		1 71
<br />																																																																																									0
<br />     				notify  members  of  the  underground  service  alert  (U.S.A.)  48  hours  in  advance  of  performing 					of  this  project.
<br />     				any  excavation  work  by  calling  the  toll-free  number  (800)  642-2444.     The  contractor  shall																																																											L	W IM V
<br />     				record  the  U.S.A  order  number  and  furnish  order  number  to  owner  prior  to  any  excavation.      																																																												W       Z
<br />      																																																																																					W
<br />     				It  shall  be  the  contractor's  sole  responsibility  to  protect  all  existing  utilities  so  that   																																																														a: Z Z
<br />     				no  damage  results  to  them  during  the  performance  of  this  contract.     Any  repairs  necessary  																																																												� 0
<br />  																																																																																								LU
<br />     				to  damaged  utilities  shall  be  paid  for  by  the  contractor.     The  contractor  shall  be  required
<br />     				to  structures,  utilities  and  service  to  the  development.																																																																				o       '^       Q
<br />     				18.  The  contractor  shall  be  responsible  for  protecting  existing  improvements  from  damage.    																																																														0
<br />     				19.  A  traffic  control  plan  (TCP)  shall  be  submitted  to  and  deemed  acceptable  by  county  prior  to  																																																											Q       Z
<br />     				start  of  work.     This  shall  address  all  phased  of  work  which  impact  public  traffic.       																																																																Q
<br />     				Conformance  with  the  TCP  shall  be  maintained  at  all  times.     A  minimum  of  one  10'  traffic
<br />     				lane  shall  be  maintained  at  all  times,  with  traffic  delays  limited  to  a  maximum  of  15
<br />     				minutes.     A  minimum  of  two  10'  traffic  lanes  shall  be  maintained  during  non-working  hours.
<br />     				Traffic  control  shall  be  in  accordance  with  section  12  of  the  Caltrans  standard
<br />     				specifications.     All  pavement  cuts  shall  be  neatly  line  cut.     Pavement  restoral  for
<br />     				longitudinal  trenches  shall  not  result  in  a  "cold  joint"  within  three  feet  of  an  existing
<br />    				edge  of  pavement  (i.e.  no  "ribbon  patches").
<br />    				20.  Whenever  pavement  is  broken  or  cut  in  the  installation  of  the  work  covered  by  these
<br />    				specifications,  the  pavement  shall  be  replaced,  after  proper  backfilling,  with  pavement
<br />    				materials  equal  to  or  better  than  the  materials  used  in  the  original  paving.     The  finished
<br />  																																																																																					SCALE    	NONE
<br />    				pavement  shall    e  subject  to  the  approval  of  San  Joaquin  Pubic  Works  Department,  or
<br />  																																																																																					JOB NO.     25-3177-01
<br />    				Caltrans  where  applicable.     See  the  Special  Provisions.
<br />  																																																																																					DESIGNED 	CSN
<br />       																																																																																					WN    	CAS
<br />    				21.  Payment  for  pavement  will  be  made  only  for  areas  shown  on  the  plans.     Replacement  of 																																																										DRADRAOWG
<br />    				pavement  which  is  broken  or  cut  during  the  installation  of  the  work  covered  by  these																																																												FILE QRpFESs/oN  		CHECKED    040C15.15.
<br />    				specifications,  and  which  lies  outside  of  said  areas,  shall  be  included  in  the  contractor's  																																																						O       				C E£   	5 RG 00
<br />    				unit  price  for  pavement,  and  no  additional  payment  shall  be  made  for  such  work.     See
<br />    				the  Special  Provisions.       																																																																									G,  	SHEET No.
<br />      																																																																																			zC1w				m
<br />																																																																																No. 			M
<br />			a																																																																													Exp OS'  (•O       •
<br />      																																																																															rT	CIVIL       �P
<br />																																																																																9TH  OF CAL�F���     				DF   12
<br />   							S400-3   				l  C.p
<br /> |