Laserfiche WebLink
i <br /> 16. CONTRACTOR TO REFERENCE AND RESTORE ALL "RECORDED" EXISTING <br /> GENERAL NOTES (CIVIL): AB ANCHOR BOLT/AGGREGATE BASE JP JOINT POLE <br /> MONUMENTS AND/OR PROPERTY CORNER REFERENCES DESTROYED, REMOVED NEW FASTING DESI RIPiTON AC ASPHALTIC CONCRETE <br /> 1. ALL NEW IMPROVEMENTS SHALL BE IN ACCORDANCE WITH THE REQUIREMENTS OR DISTURBED DURING THE COURSE OF CONSTRUCTION. <br /> OF THESE PLANS AND SPECIFICATIONS, AND THE LATEST EDITION OF SAN KV KILOVOLT <br /> JOAQUIN COUNTY STANDARD SPECIFICATIONS AND PLANS AND THE JULY 1992 17, WHERE EXISTING FENCES ARE TO BE REMOVED FOR CONSTRUCTION PURPOSES ® ® DFOP INLET BC BEGINNING OF CURVE <br /> STATE OF CALIFORNIA DEPARTMENT OF TRANSPORTATION STANDARD CONTRACTOR SHALL REMOVE AND REPLACE THE FENCING IN KIND. WHERE THE ® CAT^H BASIN BM BENCH MARK LF LINEAL FEET a <br /> SPECIFICATIONS. EXISTING FENCE IS USED FOR PROPERTY SECURITY AND/OR CONTAINMENT BDC BACK OF CURB LIN LINEAR <br /> CONTRACTOR SHALL ERECT TEMPORARY FENCING DURING (NOT SHOWN ON 0 AGRIC ILTURAL IRRIGATION VALVES DOW/BW BACK OF WALK LP LOW POINT <br /> 2. THE INTENT IS THAT THESE PLANS REQUIRE ALL LABOR AND MATERIALS PLANS) CONSTRUCTION AS SHOWN HEREON OR AS DIRECTED BY THE OWNERS @ STORM DRAIN MANHOLE <br /> (EXCEPT AS SPECIFIED IN THE SPECIFICATIONS) NECESSARY AND PROPER FOR REPRESENTATIVE. • 0 ROOF DRAIN CB CATCH BASIN MAX MAXIMUM <br /> THE WORK CONTEMPLATED AND THAT THE WORK BE COMPLETED INo STAND PIPES CC CENTER TO CENTER MB MACHINE BOLT <br /> ACCORDANCE WITH THEIR TRUE INTENT AND PURPOSE. THE CONTRACTOR SHALL 18, CONTRACTOR SHALL OBTAIN AN ENCROACHMENT PERMIT AND PAY ALL FEES CIP CAST IRON PIPE AIN MAINTENANCE HOLE <br /> NOTIFY THE ENGINEER IMMEDIATELY REGARDING ANY DISCREPANCIES AND DUE FOR SAID PERMIT PRIOR TO START OF CONSTRUCTION. CL CENTERLINE ANN MINIMUM <br /> AMBIGUITIES WHICH MAY EXIST IN THE PLANS OR SPECIFICATIONS. IF THE 0 (D CLEANOUT CMP CORRUGATED METAL PIPE MON MONUMENT <br /> ALL WORK IN PUBLIC RIGHT-OF-WAY SUBJECT TO THE APPROVAL AND <br /> PLANS DESCRIBE PORTIONS OF THE WORK IN GENERAL TERMS BUT NOT IN 19. ACCEPTANCE OF SAN JOAQUIN COUNTY PUBLIC WORKS DEPARTMENT © SANITARY SEWER MANHOLE CMU CONCRETE MASONRY UNIT <br /> . <br /> COMPLETE DETAIL, IT IS UNDERSTOOD THAT ONLY THE BEST GENERAL PRACTICE CONK: CONCRETE NIC NOT IN CONTRACT <br /> IS TO PREVAIL AND THAT ONLY MATERIALS AND WORKMANSHIP OF THE FIRST 19, CONTRACTOR AGREES TO ASSUME SOLE AND COMPLETE RESPONSIBILITY FOR ® OO WATER METER CDNT CONTINUOUS NIS NOT TO SCALE <br /> QUALITY ARE TO BE USED. JOBSITE CONDITIONS DURING THE COURSE OF CONSTRUCTION OF THIS PROJECT, ® O BLOWOFF VALVE CR CURB RETURN <br /> 3. THE TYPES, LOCATION, SIZES AND/OR DEPTHS OF EXISTING UNDERGROUND INCLUDING SAFETY OF ALL PERSONS AND PROPERTY; THIS REQUIREMENT SHALL * FIRE HYDRANT ASSEMBLY CTR CENTER OC ON CENTER <br /> UTILITIES AS SHOWN ON THESE PLANS WERE OBTAINED BY THE DESIGN APPLY CONTINUOSLY AND NOT TO BE LIMITED TO NORMAL WORKING HOURS; N pd WATER VALVE CY CUBIC YARD OD OUTSIDE DIAMETER <br /> ENGINEER FROM "OUTSIDE SOURCES," BELIEVED TO BE RELIABLE. HOWEVER, AND THAT THE CONTRACTOR SHALL DEFEND, INDEMNIFY AND HOLD HARMLESS, OG ORIGINAL GROUND <br /> THE CONTRACTOR IS CAUTIONED THAT ONLY ACTUAL EXCAVATION WILL REVEAL THE COUNTY OF SAN JOAQUIN, ITS ELECTED OFFICIALS, OFFICERS, EMPLOYEES, POST INDICATOR VALVE D STORM DRAIN <br /> THE TYPES, EXTENT, SIZES, LOCATION, AND DEPTHS OF SUCH UNDERGROUND AND AGENTS FROM ANY AND ALL CLAIMS, COSTS OF LITIGATION, DAMAGES, AND 4 ct FIRE DEPARTMENT CONNECTION DI DROP INLET RAV PAVEMENT <br /> UTILITIES. KJELDSEN, SINNOCK & NEUDECK ASSUMES NO RESPONSIBILITY FOR ATTORNEY'S FEES, FOR PERSONAL INJURY OR PROPERTY DAMAGE OF WHATEVER ® IRRIGATION CONTROL VALVE DIA DIAMETER pB PULL BOX <br /> THE COMPLETENESS OR ACCURACY OF ITS DELINEATION OF SUCH NATURE WHICH ARE CLAIMED TO HAVE OCCURED DURING THE TERM OF THIS o PRESSURE VACUUM BREAKER DMI DIMENSION PC PRIMARY CONTROL <br /> UNDERGROUND UTILITIES WHICH MAY BE ENCOUNTERED BUT WHICH ARE NOT PROJECT. a BACKFLOW PREVENTER DW DOMESTIC WATER PN POST INDICATOR VALVE <br /> SHOWN ON THESE DRAWINGS. 19. TRAFFIC SIGNS AND MARKINGS SHALL CONFORM TO THE MANUAL OF TRAFFIC PL PROPERTY LINE OR PLATE <br /> 4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THE LOCATION OF CONTROLS CALTRANS , SAN JOAQUIN COUNTY STANDARDS AND AS SHOWN ON E ELECTRIC POC POINT OF CONNECTION <br /> ( ) ■ ❑ PULL BOX EA EACH Pp POWER POLE <br /> ALL EXISTING UNDERGROUND UTILITIES AND SHALL CONTACT THE RESPECTIVE THE PLANS • O UTILITY POLE EB ELECTRICAL BOX PR PAIR <br /> UTILITY COMPANIES PRIOR TO COMMENCEMENT OF WORK. HE SHALL BE a-0 # LIGHT EC END OF CURVE PRC POINT OF REVERSE <br /> RESPONSIBLE FOR THE LOCATION AND PRESERVATION OF ALL SUCH FACILITIES EJ EXPANSION JOINT CURVATURE <br /> IN THE AREA OF CONSTRUCTION, AND SHALL NOTIFY UTILITY COMPANIES o-o TEMPORARY LIGHT <br /> TWENTY-FOUR HOURS IN ADVANCE OF ANY CONSTRUCTION UNDERGROUND CONSTRUCTION NOTES: ELEV ELEVATION PSI POUNDS PER SQUARE FOOT <br /> ( EP EDGE OF PAVEMENT PSI POUNDS PER SQUARE INCH <br /> SERVICE ALERT 1 -800-642-2444). 1. THE CONTRACTOR SHALL LAYOUT IMPROVEMENTS FROM THE ® GAS REGULATOR ESCP EXTRA STRENGTH CONCRETE PIPE PUE PUBLIC UTILITIES EASEMENT <br /> 5. THE CONTRACTOR'S ATTENTION IS DIRECTED TO SECTION 1540 (A)(1) OF THE DIMENSIONS SHOWN ON THE PLANS. ANY CLARIFICATION ON © © GAS METER EW EACH WAY PVCP POLYVINYLCHLORIDE PIPE <br /> CONFLICTS, DISCREPANCIES OR AMBIGUITIES SHOULD BE DIRECTED H pd GAS VALVE EXIST/(E) EXISTING <br /> CONSTRUCTION SAFETY ORDERS (TITLE 8 CALIFORNIA ADMINISTRATION CODE TO THE DESIGN ENGINEER PRIOR TO THE CONSTRUCTION OF THE R RADIUS <br /> SECTION 1540), ISSUED BY THE OCCUPATIONAL SAFETY AND HEALTH IMPROVEMENTS. FDC FIRE DEPARTMENT CONNECTION RCP REINFORCED CONCRETE PIPE <br /> STANDARDS BOARD PURSUANT TO THE CALIFORNIA OCCUPATIONAL SAFETY AND FDN FOUNDATION ROW REINFORCED <br /> HEALTH ACT OF 1973, AS AMENDED, WHICH STATES: 2. THE CONTRACTOR SHALL BE RL,-PONSIBLE FOR MATCHING EXISTING . o POST OR BOLLARD <br /> PRIOR TO OPENING AN EXCAVATION, EFFORT SHALL BE MADE TO DETERMINE SURROUNDING LANDSCAPE AND G HER IMPROVEMENTS WITH A FF FINISHED FLOOR RWD REDWOOD <br /> WHETHER UNDERGROUND INSTALLATION: I.E., SEWER, WATER, FUEL, ELECTRIC TRANSITION IN PAVING, CURBS, GUTILRS. SIDEWALKS, GRADES, 'I SIGN POST LOCATION FG FINISH GRADE R/W RIGHT OF WAY <br /> LINES, ETC., WILL BE ENCOUNTERED AND, IF SO, WHERE SUCH UNDERGROUND ETC., AND TO AVOID ANY ABRUPT OR 'PPARENT CHANGES IN FH FIRE HYDRANT <br /> INSTALLATIONS ARE LJCATED. WHEN THE EXCAVATION APPROACHES THE ROSS SLOPES, LOW SPOTS OR HAZARDOUS CONDITIONS. S-0.003 PIPE SLOPE, GUTTER SLOPE FTN FINISH S SLOPE <br /> APPROXIMATE LOCATION OF SUCH AN INSTALLATION, THE EXACT LOCATION FL FLOW LINE SD STORM DRAIN <br /> SHALL BE DETERMINED BY CAREFUL PROBING OR AND DIGGING; AND WHEN IT 3. WHERE PAVEMENT IS TO BE EXTENDED, EXISTING PAVEMENT SHALL o5F e�° SPOT ELEVATION FLR FLOOR SPEC SPECIFICATION <br /> IS UNCOVERED, ADEQUATE PROTECTION SHALL BE PROVIDED FOR THE EXISTING BE SAW-CUT. �' k FM FORCE MAIN So SQUARE <br /> INSTALLATION. ALL KNOWN OWNERS OF UNDERGROUND FACILITIES IN THE AREA FOC/FC FACE OF CURB SOFT SQUARE FEET <br /> CONCERNED SHALL BE ADVISED OF PROPOSED WORK AT LEAST 48 HOURS 4. ALL NEW CONCRETE FLATWORK SHALL BE DRILLED AND DOWELED FT FEET SQYD SQUARE YARD <br /> PRIOR TO THE START OF ACTUAL EXCAVATION. AND/OR KEYED INTO EXISTING FLATWORK IN ACCORDANCE WITH FW FIRE WATER SS SANITARY SEWER <br /> SAN JOAQUIN COUNTY STANDARD PLANS AND SPECIFICATIONS. STA STATION <br /> 6, THE CON- R',CTOR SHALL PROVIDE SHORING, BRACING, SLOPING OR PROVISIONS GA GAUGE SID STANDARD <br /> TO PROTECT WORKMEN FOR ALL AREAS TO BE EXCAVATED TO A DEPTH OF FIVE 5. THE CONTRACTOR SHALL PROVIDE AND MAINTAIN TEMPORARY G GAS <br /> FEET OR MORE. SAID PROTECTION TO BE DONE IN ACCORDANCE WITH THE SIGNS FOR ALL REGULATOR TRAFFIC SIGN REMOVED DURING THE GAL GALLON TEL TELEPHONE <br /> REQUIREMENTS OF LOCAL, STATE, AND FEDERAL REGULATIONS (CAL-OSHA, OSHA). 6. ALL GRADING TO BE DONE IN ACCORDANCE WITH THE GALV GALVANIZED TC TOP OF CURB <br /> RECOMMENDATIONS CONTAINED IN THE GEOTECHNICAL GPM GALLONS PER MINUTE TOG TOP OF GRATE <br /> INVESTIGATION PREPARED BY: KLEINFELDER, INCORPORATED. GR GRATE TOW TOP OF WALK <br /> 7. CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATION OF THE REMOVAL TP TELEPHONE POLE <br /> AND/OR RELOCATION OF ALL EXISTING UTILITIES WITH RESPECTIVE UTILITY 7, CUT/FILL SLOPES SHALL BE NO STEEPER THAN TWO HORIZONTAL HORR HORIZONTAL TPB TELEPHONE PULL BOX <br /> COMPANIES. TO ONE VERTICAL. HP HIGH POINT TFR TRANSFORMER <br /> 8. FINAL PAVEMENT WORK SHALL NOT OCCUR WITHIN THE ROAD RIGHT-OF- WAY TYP TYPICAL <br /> PRIOR TO COMPLETION OF UTILITY RELOCATION WITHOUT SPECIFIC APPROVAL OF 8. THE INTENT IS TO BALANCE THE FR IS RORK AT THE ROUGH ID INSIDE DIAMETER (DIM) <br /> GRADING STAGE. THE CONTRACTOR A SHALL <br /> SBILE FOR IG INTERRUPTABLE GAS W WATER <br /> THE SAN JOAQUIN COUNTY PUBLIC WORKS DEPARTMENT. <br /> VERIFYING THE GRADING QUANTITIES AND SHALL COMPENSATE FOR SYMBOLS IN INCH <br /> 9. ALL TRENCHES AND CROSS TRENCHES WITHIN EXISTING STREETS SHALL BE BACK ANY FUTURE UNDERGROUND UTILITY TRENCH SPOIL. IF DURING INV INVERT YD YARDS <br /> 10. FILLED AND PAVED WITH TEMPORARY PAVING THE SAME DAY THE PAVEMENT CUT IS THE GRADING PROCESS THE CONTRACTOR DETERMINES THERE IS IP IRON PIPE <br /> MADE OR COVERED WITH STEEL PLATES AS DIRECTED BY SAN JOAQUIN COUNTY EITHER AN EXCESS OR SHORTAGE OF DIRT, THE CONTRACTOR 1M IRRIGATION <br /> PUBLIC WORKS DEPARTMENT. SHALL NOTIFY THE ENGINEER OF THE APPROXIMATE SHORTAGE OR INTX INTERSECTION <br /> EXCESS YARDAGE OF DIRT, IN TURN THE ENGINEER WILL MAKE <br /> 10. ASBESTOS CEMENT MATERIALS SHALL NOT BE USED IN THE CONSTRUCTION OF ANY ADJUSTMENT TO THE PLAN TO ACCOMODATE THE QUANTITY <br /> FACILITIES WITHIN THIS PROJECT. DISCREPANCY. <br /> BENCH MARK <br /> 11. THE CONTRACTOR SHALL EXPOSE ALL EXISTING SEWERS, STORM DRAINS. AND Q - CONTROL POINT OR T.B.M. <br /> CLEARANCES OF KNOWN CROSSINGS WITH OTHER UTILITIES BEFORE INSTALLING NEW <br /> PIPELINES. IF THE CONTRACTOR DETERMINES THE EXISTING INVERTS ARE NOT IN DETAIL INDICATOR <br /> CONFORMANCE WITH THE PLANS, HE SHALL NOTIFY THE ENGINEER BEFORE 5 DETAIL IDENTIFICATION NUMBER ABBREVIATIONS <br /> PERFORMING ANY WORK. C1.01 <br /> DRAWING WHERE DETAIL IS SHOWN <br /> 12. PRIOR TO PLACEMENT OF ANY FINISH ASPHALT CONCRETE OR CONCRETE, THE COUNTY WIDE STANDARDS <br /> CONTRACTOR SHALL VERIFY ALL FINISH GRADES AND SLOPES FOR COMPLIANCE DETAIL INDICATOR <br /> WITH THE AMERICANS WITH DISABILITIES ACT (ADA). DRAWING NUMBER DRAWING TITLE O NOTE: DRAWING NOTE WILL IDENTIFY <br /> WHERE DETAIL IS SHOWN <br /> 13. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY FIELD CHANGES MADE WITHOUT CW- TYPE 2 CURB INLET CR & SIDE PROPOSED EXISTING DESCRIPTION <br /> WRITTEN AUTHORIZATION FROM THE OWNER REPRESENTATIVE. CW-C7 VERTICAL CURB, GUTTER & SIDEWALK REVISION <br /> CW-C11 TYPE 1 COMMERCIAL DRIVEWAY <br /> R-24 BARRICADES FOR TERMINATING STREETS A REVISION NUMBER — 2"SD — - - STORM DRAIN UNE <br /> 14. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGE TO THE SITE AND R-26 TRAFFIC SIGNS <br /> SURROUNDING AREAS RESULTING FROM OPERATIONS PRIOR TO ACCEPTANCE OF HIS R-32 STREET LIGHTING POLES AND SYMBOLS SECTION INDICATOR - ®- - SANITARY SEWER LINE <br /> 5 DETAIL IDENTIFICATION NUMBER <br /> WORK. 2. DRAWING WHERE DETAIL IS DRAWN 1 O"W — - - -10"W- - - WATER LINE <br /> 15. DURING CONSTRUCTION THE CONTRACTOR SHALL MAINTAIN THE INTEGRITY OF GAS - - -GAS- - - GAS LINE <br /> EXISTING FACILITIES. THE CONTRACTOR IS RESPONSIBLE TO REPAIR, TO THE SHEET DESCRIPTIONS MATCH LINE - <br /> SATISFACTION OF SAN JOAQUIN COUNTY, ANY FACILITIES DAMAGED DURING SHADED PORTION IS THE SIDE CONSIDERED TEL - -TEL- - - COMMUNICATION LINE <br /> SN <br /> CONSTRUCTION AT NO COST TO THE OWNER. FF[ DESCRIPTION 5 NUMBER INDICATES ADJACENT DRAWING <br /> 1 TITLE SHEET 12KV - - -12KV-- - ELECTRICAL LINE <br /> 15. A TRAFFIC CONTROL PLAN (TCP) SHALL BE SUBMITTED TO AND DEEMED 2 GENERAL CIVIL NOTES NOTE INDICATOR <br /> ACCEPTABLE BY COUNTY PRIOR TO START OF WORK. tHIS SHALL ADDRESS ALL 3 LAYOUT PLAN 5 1"C - - -1"C- - - ELECTRICAL CONDUIT <br /> PHASED OF WORK WHICH IMPACT PUBLIC TRAFFIC. cONFORMANCE WITH THE TCP 4 STRIPING PLAN ❑ NOTE NUMBER AS INDICATED <br /> SHALL BE MAINTAINED AT ALL TIMES. A MINIMUM OF ONE 10' TRAFFIC LANE SHALL 5 ROUGH GRADING <br /> BE MAINTAINED AT ALL TIMES, WITH TRAFFIC DELAYS LIMITED TO A MAXIMUM OF 15 6 DETAIL SHEET <br /> MINUTES. A MINIMUM OF TWO 10' TRAFFIC LANES SHALL BE MAINTAINED DURING 7 DETAIL SHEET <br /> NON-WORKING HOURS. TRAFFIC CONTROL SHALL BE IN ACCORDANCE WITH <br /> SECTION 12 OF THE CALTRANS STANDARD SPECIFICATIONS. ALL PAVEMENT CUTS <br /> SHALL BE NEATLY LINE CUT. PAVEMENT RESTORAL FOR LONGITUDINAL TRENCHES <br /> SHALL NOT RESULT IN A "COLD JOINT" WITHIN THREE FEET OF AN EXISTING EDGE <br /> OF PAVEMENT (i.e. NO "RIBBON PATCHES" <br /> GENERAL NOTES COUNTY WIDE STANDARDS, SHEET NUMBERS CONVENTIONS LINETYPES <br /> 'F' <br /> -WD-227-26 CPN SSs � SAN JOAQUIN COUNTY Revisions Design MRC Scale Job No. <br /> K KJELDSEN <br /> No. Date B Description nts 1548-0020 <br /> S SI N N OC K Post Office Box Avenue <br /> IMPROVEMENTS FOR y P Drawn <br /> etre C � ~ N0. 32192 T� 711 N. Pershing Avenue DMA Sheet Number <br /> EXP. 12/31 2004 N N E U DECK Stockton, <br /> (2o)9946''-02684 THORNTON ROAD REALIGNMENT Check SKS 2 Of 7 <br /> 1 / rrq O V1 INC. Co suiting Engineers Faxes: (209) 946-0296inc.coGENERAL CIVIL NOTES Date <br /> d�`' and Land Surveyors E-mail: KSN®ksninc.com O1 /1 $/01 File Number <br />