Laserfiche WebLink
' zzi 1 <br /> F- :A FEDERAL PROJECT No. EARL SHEET <br /> SHEETS <br /> L.V. No STATE E°ER PR yE _'- <br /> -- CALIF <br /> 7 5-907 CQ "phase 2" 10 LIO, <br /> Roadway cut before _.— <br /> ° = �° ".. R' rEE_"'°" SNEE. I `°T,._ <br /> J EXCAVATION BACKFILL EXCAVATION BACKFILL Bridge Construction Sub rade X SJ 907_ ) —LO-1 10 <br /> Subgrade <br /> � <br /> Original Ground III,New Embankment Approval Recommended <br /> Original Ground f -- J Ong. Ground <br /> Pipe Pipe <br /> 1 \ Assistant State Highway Engineer–Bridges <br /> Ditch at Flow Line Channel " - <br /> Excavation p Subgrade ` `1 <br /> I -4 1 III--+IIF- Embankment in place beforeELEVATIONS an a igNiway gineer-Operations <br /> PIPE HEADWALLS structure excavation is made <br /> Approved AUQust 17 1953 <br /> PIPE IN TRENCH I <br /> a e HignWaf ngmeer <br /> Civil weer License 2084 <br /> Slope or / D I \ D / <br /> Subgrade Subgrade \ To Accompany Plans Doted�/1//�e_-27,19SS <br /> \Roadwa Em Cine t \ <br /> \`, l \ \ I'r\ Orig. Ground - ------ I -- <br /> - or Cut Slope a �1 III <br /> See Notes D <br /> A <br /> C ;I A D n I <br /> New Embankmen <br /> \ \ \ Orig. Ground a-° Ong. Ground <br /> II <br /> \ or Subgradeor Subgrade <br /> X B li jll II <br /> u <br /> PIPE IN NEW EMBANKMENT <br /> top of pipe ..a•o,,tl ., .;.. I _I 1_ ------ -`------ <br /> Height of Top of Embankment Before Excavating For Pipe — <br /> Shall Be As Follows:- <br /> For pipe 24" or less dia: 6aabov <br /> For C.M.P. over 24"to 90"dia:30'above bottom of pipe B PLAN <br /> For C.M.P. over 90'dla� 1/3 point of dia. above bottom of pipe RETAINING WALLS I \, <br /> For R.C.P. over 24dia: 30 above bottom of pipe I I I BACKFILL <br /> For field assembled plate culvert: 1/3 point of dia. above.bottom Toe of Embankment EXCAVATION 4ARdwy <br /> e Slope <br /> of pipe <br /> Structure Backfill 6"Above Top of Pipe I I Subgrad <br /> I I ' <br /> Culvert Rdwy Emb. <br /> I I �• Ground surface at time PIPES RODS 81 DEADMEN I excavation is madeExcept Underdrains a Downdrains I B � EXCAVATION BACKFILL <br /> P <br /> EXCAVATION BACKFILL Roadway Excavation Ori .Ground <br /> °S o: <br /> ' ongGroa <br /> und Subgrade Orig. Groun <br /> .Original Ground PLAN OF WING WALL — Da. <br /> y <br /> vr <br /> SECTION B_ <br /> SECTION A—A <br /> ° EXCAVATION RoadwayBACKFILL <br /> ' Embonkment ® Rdwy. Emb. <br /> Side Slope <br /> CULVERT IN TRENCH <br /> Orig. Ground e' FInw I or Subgrade ° <br /> e< Ground surface at time structure Subgrade ;. <br /> excavation is made A ° <br /> �-I I' I--- 1' I- -�-I I'I-�--4 I'I•.-- D.° nOrig Ground �,a <br /> Subgrade SECTION A—A � <br /> Top of Bo Roa y o� toadway EmbankmeFlt " <br /> mbankmOn o ° <br /> '° Rdwy. Excavation •e 7.. <br /> Roadway Orig. Ground <br /> Embankment <br /> ,. Subgrade <br /> Culvert,, ;� Subgrade <br /> DFIg. Ground d,., 0 4 °. i w '.e : o.a'�' ba n'..;:. L •Sa .:$£�5.., d <br /> _ <br /> Roadway Excavation <br /> ' <br /> I <br /> -1 I � I I•r— <br /> CULVERT IN EMBANKMENT <br /> I <br /> SECTION D—D <br /> . e,,.r,;:�. SECTION C—C <br /> Orig. Ground Ditch <br /> Excavation Flaw Line BRIDGE ABUTMENTS & ADJOINING WING WALLS <br /> -Paving Notch g SECTION B—B LEGEND <br /> Subgrade <br /> �� <br /> Roadway Embankment WING WALLS <br /> rOriground � o; � Structure Excavation <br /> T • I' � I' f� I' Structure Backfill <br /> GRADE TOP CULVERT <br /> Ditch 81 Channel Excavation <br /> BOX CULVERTS EXCAVATION BACKFILL EXCAVATION <br /> BACKFILL ® Roadway Embankment <br /> Roadway Excavation <br /> .r <br /> F Embankment or Note : Subgrade shall be lowest subgrade as <br /> A Original Ground ° ° defined in the Standard Specifications <br /> Embankment or °'° ''' Embankmen or <br /> Original Ground ° Embankment or , 1 <br /> g Original Ground Original Ground STATE OF CALIFORNIA <br /> _ 4" :> � DEPARTMENT OF PUBLIC WORKS <br /> Orig. Ground Const. Joint a ;: DIVISION OF HIGHWAYS <br /> Channel or Ori Gr. Channel or Ori •Gr, x I' <br /> g ,\ ,\ ,\ Const. Joint <br /> Ditch 81 Channel Ditch & Channel =e <br /> ExcavationExcavation :I <br /> o�.a <br /> Top limit of structure excavation and backfill is original Top limit of structure excavation and backfill is original STRUCTURE EXCAVATION AND <br /> ground if channel is not excavated ground if channel is not excavated <br /> � SLOPE PAVING STRUCTURE BACKFILL <br /> MONOLITHIC CONCRETE SLOPE PAVING, RIPRAP CONCRETES 0 _. , ,^: r SCALE: BRIDGE: FILE: DRAWING: a <br /> Revised: 5-19-55 Revised: 10-1-54 Revised 2-19-54 A 62 <br /> Key on Retaining Walls Title a Coping <br />