My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
W736 - W747
PublicWorks
>
VAULT MAPS
>
Large Plans - LP
>
Drawer W
>
W624 thru W798
>
W736 - W747
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/8/2016 3:38:58 PM
Creation date
1/22/2016 10:46:09 PM
Metadata
Fields
Template:
Improvement Plans
Supplemental fields
DocCategory
Improvement Plans
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
'ON 133HS 83MV8a 3AVN 311.1 <br /> DUST CONTROL RETROFIT CURB RAMP DETECTABLE MINOR CONCRETE (CURB. GUTTER AND SIDEWALK) (Continued from Bottom of Left Column) <br /> (NON—WORKING HOURS) WARNING SURFACE Location Quantity MINOR CONCRETE (Cont) <br /> (DRIVEWAYS) <br /> Location Quantity Location Quantity Mendocino Avenue Wallace Avenue <br /> Throughout Project 20 Each Mendocino Avg/Wisconsin Ave SE Quadrant 1 Each Ste 18+25 to Ste 25+34 (Rt) 712 LFSte 26+31 to Ste 34+14 (Rt) 780 LF Left Side Quantity Right Side Quantity <br /> Wallance Ave/Sonoma Ave NW Quadrant 1 Each Ste 18+24 to Ste 25+35 (Lt) 708 LF Ste 1+16 14 SY Ste 3+09 6 SY <br /> Ste 26+34 to Ste 34+14 (Lt) 784 LF <br /> Total 2 Each Sta 1+47 16 SY Sta 3+23 6 SY <br /> Monterey Avenue Ste 2+09 8 SY Ste 5+45 5 SY <br /> RECONSTRUCT STORM DRAIN INLET Ste 0+50 to Ste 7+78 (Rt & Lt) 1460 LF Ste 2+54 5 SY Ste 5+91 6 SY <br /> Wallace Avenue Ste 2+78 5 SY Ste 6+54 15 SY <br /> Ste 0+38 to Ste 1+50 (Rt) 112 LF <br /> Location Quantity Sta 3+36 8 SYSta 9+16 20 SY <br /> ROADWAY EXCAVATION Ste 2+45 to Ste 3+86 (Rt) 140 LF <br /> Mendocino Avenue Ste 4+86 to Ste 7+22 (Rt) 235 LF Sta 5+25 3 SY Sta 9+70 13 SY <br /> Ste 18+22 (14' Lt) 1 Each Location Ste 8+23 to Ste 10+86 (Rt) 263 LF Ste 6+61 12 SY * Ste 10+45 2 SY <br /> Ste 25+34 (14' Lt & Rt) 2 Each Ste 0+69 to Ste 3+85 (Lt) 318 LF Ste 8+36 1 SY <br /> Ste 26+31 (14' Lt & Rt) 2 Each Mendocino Avenue Ste 4+82 to Ste 7+10 (Lt) 229 LF Ste 8+71 4 SY <br /> Monterey Avenue Ste 17+91 to Ste 34+53 3,148 CY Ste 8+14 to Ste 10+48 (Lt) 235 LF <br /> e Ste 9+40 10 SY <br /> Ste 7+80 (14' Lt & Rt) 2 Each Monterey Avenu <br /> Mendocino Ave/Wisconsin Ave 45 LF Sta 10+10 9 SY <br /> Wallace Avenue Ste 0+14 to Ste 8+14 1 ,663 CY Mendocino Ave/Kirk Ave 105 LF <br /> Ste 0+09 (38' Rt) 1 Each Wallace Avenue Monterey Ave/Kirk Ave 102 LF <br /> Ste 0+36 59' Lt) 1 Each Ste 0+15 to Ste 11+35 1 ,628 CY Wallace Ave/Michigan Ave 112 LF Total (Left) 95 SY Total (Right) 73 SY <br /> Ste 7+23 Rt) 1 Each Wallace Ave/Monterey Ave 101 LF Total Project (Left) 432 SY Total Project (Right) 411 SY <br /> Ste 7+90 (36 Rt) 1 Each Total 6,439 CY Wallace Ave/Mendocino Ave 214 LF <br /> Total 11 Each Wallace Ave/Sonoma Ave 168 LF Project Total (Left + Right) 843 SY <br /> Wallace Ave/Alpine Ave 202 LF <br /> Concrete Walkway <br /> Total 7,025 LF <br /> ADJUST FRAME AND COVER (MAINTENANCE HOLE) MAINTAIN EXISTING LAWN (SOD) <br /> Location Quantity Location Quantity MINOR CONCRETE <br /> Locations Within Curb, Gutter and Sidewalk Replacement Areas (DRIVEWAYS) FRAMES AND GRATES <br /> Mendocino Avenue Mendocino Avenue Monterey Avenue M <br /> Sta ,8+02 (Lt) (Storm) 1 Each (SDI TYPE ) <br /> Ste 17+91 to Ste 34+53 344 SY <br /> Left Side Quantity Right Side Quantity <br /> Wallace Avenue Monterey Avenue Ste 0+91 11 SY Ste 0+95 8 SY Location Quantity <br /> Ste 0+84 (Center) (Sanitary) 1 Each Sta 0+14 to Ste 8+14 166 SY <br /> Ste 2+64 (Center) (Sanitary) 1 Each Wallace Avenue Ste 1+63 8 SY Sta 1+62 t3 SY Mendocino Avenue <br /> Ste 3+11 (Center) (Sanitary) 1 Each Ste 0+15 to Ste 11+35 239 SY Ste 2+11 5 SY Ste 2+30 9 SY Ste 18+22 (14' Lt.) 1 Each <br /> Ste 5+96 (Center) (Sanitary) 1 Each Ste 2+36 5 SY Ste 2+99 5 SY <br /> Ste 9+33 (Center) (Sanitary) 1 Each Total 749 SY Wallace Ave Michigan Ave <br /> Sta 11 +22 (Center) (Sanitary) 1 Each Ste 2+65 1 SY Ste 4+39 12 SY Ste 0+09 (38' Rt) 1 Each <br /> Ste 2+99 16 SY Ste 5+03 18 SY Ste 0+36 (59' Lt) 1 Each <br /> Total 7 Each Ste 4+39 29 SY Ste 5+69 8 SY Wallace Ave/Sonoma Ave <br /> Sta 5+07 7 SY Ste 6+37 8 SY Ste 7+23 (17' Rt) t Each <br /> CLASS 2 AGGREGATE BASE Ste 5+76 8 SY c Ste 6+81 1 SY Ste 7+90 (36' Rt) 1 Each <br /> Ste 6+45 SY <br /> ADJUST FRAME AND GRATE (STORM DRAIN INLET) Location Quantity Ste 6+66 t5 SY Sta 7+20 21 SY <br /> Total 5 Each <br /> Location Quantity Mendocino Avenue 1 ,200 CY Ste 7+10 8 SY <br /> Monterey Avenue 578 CY Ste 7+49 8 SY <br /> Mendocino Avenue <br /> Sta 25+34 (14' Lt & Rt) 2 Each Wallace Avenue 809 CY Total left 123 SY Total (Right) 103 SY <br /> Ste 26+31 (14' Lt & Rt) 2 Each Wallace Ave/Monterey Ave 109 CY Mendocino Avenue <br /> Wallace Ave/Mendocino Ave 156 CY <br /> Montergy Avenue Wallace Ave/Sonoma Ave 181 CY Left Side Quantity Right Side Quantity SOIL STABILIZATION FABRIC <br /> Ste 7+80 (14' Lt & Rt) 2 Each <br /> Total 3,033 CY Sta 18+90 a SY Sto 18+90 11 SY <br /> Total 6 Each Ste 19+45 9 SY Ste 19+45 5 SY Location Quantity <br /> Ste 20+23 8 SY Ste 19+90 8 SY Mendocino Avenue <br /> Ste 20+94 9 SY Ste 20+38 9 SY Ste 17+91 to Ste 18+25 173 SY <br /> ASPHALT CONCRETE (TYPE B) Ste 21+70 7 SY Stu 20+94 4 SY StSte 18+25 to Ste 23+00 1,372 SY <br /> Ste 23+00 to Sta 25+34 682 SY <br /> RELOCATE ROADSIDE SIGN Ste 22+40 22 SY >Ic Ste 21+32 3 SY Ste 26+34 to Ste 28+00 480 SY <br /> Location Quantity Ste 23+23 11 SY Ste 21+45 7 SY Ste 28+00 to Ste 33+00 1,444 SY <br /> Location Quantity Ste 33+00 to Ste 34+14 329 SY <br /> Mendocino Avenue Ste 23+87 8 SY Ste 21+94 7 SY Ste 34+14 to Ste 34+53 195 SY <br /> Mendocino Avenue Sto 17+91 to Ste 18+25 57 Tons Ste 24+67 12 SY Ste 22+44 13 SY Monterey Avenue <br /> Ste 18+25 to Ste 23+00 457 Tons <br /> Ste 18+32 Lt , Each Ste 24+88 4 SY Ste 23+05 9 SY Ste 0+14 to Ste 5+00 1,404 SY <br /> Sta 25+38 Rt 1 Each Ste 23+00 to Ste 25+34 227 Tons <br /> Sta 26+36 Lt 1 Each Sta 26+34 to Sta 28+00 160 Tons Sta 26+82 5 SY Sta 23+64 8 SY Sta 5+00 to Sta 7+78 803 SY <br /> Ste 33+00 Rt 1 Each Ste 28+00 to Ste 33+00 481 Tons Ste 7+78 to Ste 8+14 179 SY <br /> Sta 33+00 to Sta 34+14 110 Tons Ste 27+17 8 SY Ste 24+31 10 SY Wallace Avenue <br /> Sto 34+21 IRt 1 Each M <br /> Ste 34+14 to Ste 34+53 65 Tons Ste 28+16 11 SY Ste 24+88 8 SY Ste 0+15 to Ste 0+69 251 SY w <br /> Monte venue Ste 0+69 to Ste 3+85 913 SY <br /> Sta 0+38 JLRt <br /> t1 Each Monterey Avenue Ste 29+03 9 SY * Ste 25+20 2 SY Ste 4+86 to Ste 7+10 647 SY <br /> Ste 1+09 Rt1 Each Ste 0+14 to Ste 5+00 468 Tons Ste 29+75 8 SY Ste 26+76 8 SY Ste 8+23 to Ste 10+48 650 SY aSte 6+59 Rt 1 Each Ste 5+00 to Ste 7+78 268 Tons Ste 10+48 to Ste 1 1+33 520 SYSte 7+32 Lt1 Each Ste 7+78 to Ste 8+14 60 Tons Ste 30+33 11 SY Stu 27+50 8 SY ZSte 7+77 1 Each Wallace Avenue Ste 30+97 13 SY Ste 28+26 14 SY Street Intersections <br /> Wallace Ave/Mendocino Ave 629 SY <br /> Wallace Avenue Ste 0+15 to Ste 0+69 83 Tons Ste 31+60 14 SY Ste 28+97 5 SY Of <br /> Ste 0+62 Lt 1 Each Stu 0+69 to Ste 3+85 304 Tons Wallace Ave/Monterey Ave 55 SY t- <br /> Ste 3+88 Rt 1 Each Ste 4+86 to Ste 7+10 216 Tons Ste 32+24 16 SY * Sta 29+41 2 SY Wallace Ave/Sonoma Ave 714 SY z <br /> Ste 4+75 Lt 1 Each Ste 8+23 to Ste 10+48 217 Tons <br /> Ste 10+75 (Lt) �olc 1 Each Ste 10+48 to Ste 11+33 173 Tons Sta 32+89 13 SY Sta 29+67 11 SY o <br /> Ste 11+00 (Rt) 1 Each Ste 33+49 8 SY Ste 30+46 8 SY W <br /> Street Intersections Total 11,440 SY it <br /> m <br /> Ste 31 +23 <br /> Sonoma Avenue 1 Each Wallace Ave/Mendocino Ave 209 Tons Stu 32+24 12 SY <br /> 1 Each r v <br /> Ste 9+52 {Rt) Wallace Ave/Monterey Ave 18 Tons <br /> Sta 10+48 (Lt) Wallace Ave/Sonoma Ave 238 Tons Ste 32+78 25 SY x <br /> Total 17 Each Sto 33+49 16 SY <br /> New Posts and Hardward Required Total 3,8„ U <br /> Tons Sta 33+80 ,4 sY <br /> O <br /> Total (Left) 214 SY Total (Right) 235 SY y <br /> UJ <br /> 3 <br /> (Continues on Right Top Column) <br /> a <br /> z <br /> DRAWN BY DATE PROJECT ENGINEER DATE CHECKED DATE APPROVAL RECOMMENDED DATE SHEET TOTAL <br /> C n ort� 11/06 EN s T COUNTY OF SAN JOAQUIN SCALE SUMMARY OF QUANTITIES WEST COUNTRY CLUB RECONSTRUCTION, NO. SHEETS ul <br /> ZC?J' &o 08w&lIS' 3/07 Y la� ��+/�, �i. M/f . as SHOWN PHASE 3 t2 t2 a <br /> FILE NAME I DRAWER SHEET NO, ACAD REVISIONS DATE <br /> \oRacff\=7\11. oowy aw osaYr■\ <br /> [WM.3&.00ty"\aw 0 a.e nay <br />
The URL can be used to link to this page
Your browser does not support the video tag.