My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SP347 - SP365
PublicWorks
>
VAULT MAPS
>
Small Plans - SP
>
SP0001 - SP0396
>
SP347 - SP365
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2024 9:32:12 AM
Creation date
1/22/2016 11:30:37 PM
Metadata
Fields
Template:
Small Plans - SP
Project
Road District III Reconstruction & Resurfacing 1977-78 Phase II
Year
1978
Project Engineer
R.S. Baer
Red Lines
No
Districts
District 3
Supplemental fields
Classification
Improvement Plans
Cross Ref
SP347 - SP365
Type
Reconstruction & Resurfacing
Document Relationships
Beyer Lane (Stockton) See Darigo Road
(Message)
Path:
\VAULT MAPS\*CARD CATALOG*\BA - BH
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
i <br /> ® =.Cir77/t9 of mai/bor re%anion <br /> 41177/1s of C/ecring �t Gcubbing i Corthwork (Wwy. Wide17in7 - <br /> 3" /O' 2' 4' 3' <br /> 0 <br /> hoc _var. <br /> L— — — — — — — — — - - - <br /> A.B. A.8.. `� Gutter Grode or Conform to exist. <br /> Gutter Grode ®0.23 LI.C. Over/oy O.S'A.C. X 0=2' Typico/ Both Sides <br /> Existing �Poodway <br /> ® Refer to Sheet No. 17 for /ocotion and P�ofi/e <br /> for A.C Leve/ii7g, <br /> 2/. 7 STATS <br /> TYPICAL STMON <br /> CNo Sco/e) <br /> i <br /> Fo i <br /> o � <br /> C � � <br /> E.P. <br /> o � <br /> v C0179t MU17 d Ave L' Consf. Munforo' <br /> .Q i <br /> z I <br /> A.C. Over/oy <br /> Contbr/n to exist ,Pod/i <br /> o___ ,2Z Cross Slope 51o.13,,57 fo 9/b 17,,75 <br /> H/GHWAY 99 E. A-POWTAM 0 MARIPOSA ROAD <br /> 1AITE2.7ECRON DETAILS <br /> C//o .Ycale) <br /> COUNTY OF SAN JOAQUIN SCALE: None MUNFORD AVENUE ROAD DISTRICT III RECONSTRUCTION sneer No. <br /> ((�� 8 RESURFACING 1977-78 PHASE 11 14 of 19 <br /> f/ <br /> Project Engineer Date Checked B _ Data Aesocfote En ineer Date Approval Recommended 8 Date <br /> 11 G'. �. !8� 5•7f 1 o s s/,y 7 78 <br />
The URL can be used to link to this page
Your browser does not support the video tag.