Laserfiche WebLink
Const. GENERAL NOTES <br /> • <br /> Limits of Clearing and Grubbing 1 . The Contractor shall notify Mr. Greg <br /> Carney of Stockton Terminal and Eastern <br /> 2 f X11 11 Railroa* days pro ( l21 <br /> iortobeginniingwwork on Golden <br /> Gate Avenue in the vicinity of the <br /> 20' Pavement Reinforcing Fabric railroad crossing. Attention is directed to <br /> C:0?Referto <br /> Sec. 7-1.14 "Cooperation" and Sec. <br /> 8-1.10 "Utility and Non—Highway <br /> Facilities" of the Standard Specifications. <br /> Var. _ Var. Var. _ V Conform Stockton Terminal and Eastern Railroad <br /> Co. will be reconstructing the rails across <br /> Golden Gate Avenue. This work will require <br /> emove and d spose ofs The o exstng A.0ractor II <br /> ■ within 2' of the rails and repave the <br /> 0.17' A.C. area after the railroad has completed <br /> their work. Payment for removing and <br /> Existing Roadway 0.17' Asphalt Concrete Overlay replacing A.C. within 2' of rails will be by <br /> laning <br /> Detail Sheet No. 10 Shoulder backing Item 1, Force Account. <br /> 2. The existinq drainage facilities located <br /> within the limits of Clearing and Grubbing <br /> shall not be disturbed or obstructed <br /> Shoulder Detail TYPICAL SECTION by the Contractor's operation, unless <br /> Shoulder Detail otherwise noted on the plans. <br /> With Curb and- Gutter Sto 5+91f to Sta 54+32t Without Curb and Gutter 3. The Contractor shall conduct the work <br /> • so as not to damage or bury existing <br /> water meter encasements and sanitary <br /> Limits of Mailbox relocation = 0.08' A.C. Sta. 34+93 to Sta. 41 +00 Rt. sewer cleanouts located in the shoulder <br /> n area. <br /> / 4. Water valve frames and covers shall be <br /> o 0 f = 3' Sta. 5+91 to Sta. 6+16 Rt. A = 4' Sta. 6+16 to Sta. 34+72 Rt. <br /> 0 Dv = 7' Sta. 5+91 to Sta. 7+24 Lt. = 4' Sta. 9+48 to Sta. 18+27 Lt. adjusted to grade by California Water <br /> 8' Sta. 7+24 to Sta. 9+48 Lt. = 4' Sta. 23+27 to Sta. 34+72 Lt. Service Company after the resurfacing <br /> m = 8' Sta. 18+27 to Sta. 23+27 Lt. = 2' Sta. 34+72 to Sta. 38+50 Rt. project is completed. <br /> = 11'-22' Sta. 35+00 to Sta. 43+55 Lt. = 4' Sta. 38+50 to Sta. 54+32 Rt. 5. Gas valve frames and covers shall be <br /> m <br /> 4' Sta. 43+55 to Sta. 54+32 Lt. adjusted to grade by Pacific Gas & <br /> r- Electric Company after the resurfacing <br /> M project is complete. <br /> N Z + = Var. Sta . 5+91 to Sta. 6+16 Rt. * = 0' Sta. 6+16 to Sta. 25+10 Rt. <br /> a = 10' Sta. 18+27 to Sta. 23+27 Lt. = 0' Sta. 9+48 to Sta. 18+27 Lt. 6. Placement of Asphalt Concrete surfacing <br /> M = 0' Sta. 23+27 to Sta. 25+10 Lt. shall not begin until Asphalt Concrete <br /> = 0' — 5' Sto. 25+10 to S to. 27+00 Lt.&Rt. used in pavement repair has been in <br /> 5' Sta. 27+00 to Sta. 33+60 Lt.&Rt. in place for a minimum of 36 hours. <br /> tj = 5' —1 1 'Sta. 33+60 to St a. 34+72 Rt. 7. The Contractor shall obtain a permit from <br /> =11 ' Sta. 34+72 to Sta. 38+50 Rt. <br /> £ =1 1 '— 0' Sta. 38+50 to St a. 42+34 Rt. the City of Stockton for work within the <br /> M = 0' Sta. 42+34 to Sta. 54+32 Rt. City's jurisdiction. <br /> A = 0' Sta. 43+55 to Sta. 54+32 Lt. <br /> COUNTY OF SAN JOAQUIN NO SCALE TYPICAL SECTION GOLDEN GATE AVE. RESURFACING Sheet No. <br /> Fremont Street to Waterloo Road 2 of 12 <br /> Drawn By Date Project Engineer Date Checked Date Submitted Date ApprovadRecommended I n+. <br /> bn 6/ 9le 6//a/y3 MI)A IGw.su 4/15 �Jjl io �'rr� <br /> �Q� <br />