Laserfiche WebLink
i <br /> Existing surface <br /> See Note ADJUST MANHOLE MODIFY STORM DRAIN INLET <br /> FRAMES and COVERS <br /> — — — — — Location Quantit Location Quantity <br /> - - - - Thirteenth St. <br /> Clover Ln. <br /> Sto. 3+81 Lt. 1 Each <br /> - - - - - - - - - - - - - - - - - - - - <br /> Sta. 9+05 Rt. 1 Each <br /> Sta. 12+00 Rt. 1 Each <br /> 0.50' Asphalt Concrete Sto. 15+95 Rt. 1 Each <br /> Subtotal 3 Each <br /> PAVEMENT REPAIR Eleventh St., <br /> Sta. 12+00 Rt. 1 Each <br /> Note: Width, length, and locations Sta. 16+00 Rt. 1 Each PAVEMENT REPAIR <br /> to be determined by Engineer. Subtotal 2 Each <br /> Gerald Ave., Location Quantity <br /> Sta. 6+55t Rt. 1 Each Gerald Ave., <br /> 7 Sites 72 S.Y. <br /> ABANDON STORM DRAIN INLET Thirteenth St., <br /> Location Quantity Thirteenth St. 2 Sites 4 S.Y. <br /> Eleventh St. Sta. 3+80 Rt. 1 Each Twelfth St., <br /> Sta. 8+41t Lt. Lump Sum Sta. 6+25 Lt. 1 Each Turnaround <br /> Sta. 6+90 Rt. 1 Each 1 Site 8 S.Y. <br /> Twelfth St.Subtotal 3 Each Total 84 S.Y. <br /> Sta. 3+50 Rt. 1 Each <br /> Sta. 6+50 Rt. 1 Each <br /> RESET SALVAGED FRAME Subtotal 2 Each <br /> 3 AND GRATE <br /> p Location Quantity Twelfth St. Turnaround <br /> o Thirteenth St. Sta. 4+95 Rt. 1 Each PLANING ASPHALT <br /> 0 <br /> Sta. 4+05 Lt. 1 Each Total 12 Each CONCRETE PAVEMENT <br /> Location Quantity <br /> Clover Ln. 203 S.Y. <br /> Eleventh St. 206 S.Y. <br /> m Gerald Ave. 94 S.Y. <br /> z ADJUST WATER METER BOX ADJUST STORM DRAIN INLET Thirteenth St. 92 S.Y. <br /> Twelfth St. 94 S.Y. <br /> d <br /> M m Location Quantity FRAME and GRATE Total 689 S.Y. <br /> Thirteenth St. Location Quantity <br /> Sta. 4+14 Lt. 1 Each Thirteenth St. <br /> Sta. 3+81 Rt. 1 Each <br /> V7 <br /> . m <br /> A <br /> o G CONSTRUCMON_ DETAILS A MORRISON GARDENS RESURFACINsheet No. <br /> - COUNTY OF SAN JUAQUIN No SCALE SUMMARY-OF QUANTITIES 10 of 11 <br /> Drawn By Date Protect Engineer Date Checked Date /Submitted Date p a Recommended Date <br /> 1/43 1193 / Y f <br />