Laserfiche WebLink
I <br /> 4 <br /> GENERAL NOTES <br /> Limits of Cearinq & Grubbing <br /> Lane Limits of Earthwork (Roadway Widening) 1. Trees and shrubs shall remain in <br /> Line place unless otherwise noted on <br /> 9' 9' 2' 6' Sheet No. 3. <br /> 2. Existing highway and utility facilities <br /> Place A.C. Dike(Type A) shall remain in place unless otherwise <br /> 1, Refer Std Plan RSP — A87. Conform noted on Sheet No. 3. <br /> 3. Placement of the top layer of asphalt <br /> — - — — 0% 1 � <br /> Concrete sha <br /> 1Il not begin until the lower <br /> �.JJJ- layers have been in place a minimum <br /> i �� !r of 12 hours. <br /> 0.08' f� � i i� y r 0.70' <br /> ' ;— I Natural Ground <br /> Existing Pavement <br /> A.C. Gutter Grade <br /> 0.90' Asphalt Concrete ((Type B) bA_1 <br /> 2"A Reinforced Concrete <br /> Drain Pipe. \exist. <br /> ocate exist. Type 1—B <br /> Remove exist. Pull Box. Install . & Equipment. Refer <br /> TYPICAL SECTION — ROAD WIDENING No. 5 Traffic Pull Box Std. Plan ES-6A. R&D <br /> & adjust to grade. Refer to foundation. <br /> Sto. 5+2',: to Sta. 7+70t Std. Plan ES-8 for Details. <br /> Finished Grade Structural Section <br /> Conform to Top of A.C. Dike � <br /> 5t <br /> D <br /> v Height <br /> c Trans. 1' <br /> (TYp•) <br /> 8 /Select Native Material - <br /> (90% Relative Compaction) Exist. Pull Box to remain <br /> in place. <br /> M <br /> M <br /> Z � _ ExistiQWWidth <br /> LDriveway Conform 25' Rt+ from base Line. <br /> M DRIVEWAY NOTES 0 <br /> 1. A.C. Dike height shall be reduced 1•� 0.D. �1• Note: 1. Actual location of Traffic Signal will <br /> to 0.12' across driveway openings. be determined by the Engineer. <br /> 2. Driveway Type D = 0.30' A.C. over D. + 2' <br /> .� A shaped & compacted native material. <br /> �V m <br /> A TYPICAL DRIVEWAY TYPICAL TRENCH DETAIL RELOCATION TRAMC SIGNAL DETAIL <br /> ZTYPICAL SECTION PERSHING AVENUE—RIGHT TURN WIDENING Sheet No. <br /> COUNTY OF SAN JOAQUIN SCALE AS SHOWN CONSTRUCTION DETAILS Joan Avenue to Hammer Lane 2 of 4 <br /> Drawn By Date Project Engineer Date Checked By Dnte Associate Engineer Date =t ocommiended By Dnte <br />