Laserfiche WebLink
FPLACE ASPHALT TERMINAL SECTION <br /> FCONCRETE DIKE T e A <br /> (Type C) (Low Dike) Location Quantity <br /> Location Quantity Bridge No. 29C-028 <br /> Sta. 214+37 to Sta. 215+75 (Rt.) 88 L.F. Northwest Corner 1 Each <br /> Sta. 218+85 to Sta. 219+52 (Lt.) 67 L.F. Southeast Corner 1 Each <br /> Sta. 269+51 to Sta. 270+08 (Lt.) 57 L.F. Bridge No. 29C-022 <br /> Sta. 274+79 to Sta. 275+67 (Lt.) 88 L.F. Northwest Corner 1 Each <br /> Total 300 L.F. Southwest Corner 1 Each <br /> Total 4 Each <br /> METAL BEAM <br /> GUARD RAILING TERMINAL SECTION <br /> Location Quantity (Ty p e C <br /> Bridge No. 29C-028 Location Quantity <br /> Northwest Corner 37.5 L.F. Bridge No. 29C-028 <br /> Southeast Corner 62.5 L.F. Northwest Corner 1 Each <br /> Bridge No. 29C-022 Southeast Corner 1 Each <br /> Northwest Corner 62.5 L.F. Bridge No. 29C-022 <br /> Southwest Corner 31 .5 L.F. Northwest Corner 1 Each <br /> TotalSouthwest Corner 1 Each <br /> 194.0 L.F. <br /> v >Total 4 Each <br /> CABLE ANCHOR ASSEMBLY <br /> N <br /> (Breakaway, Type A <br /> Location Quantity <br /> n, <br /> Z Bridge No. 29C-028 <br /> dD Northwest Corner 1 Each <br /> 3 <br /> rn Southeast Corner 1 Each <br /> Bridge No. 29C-022 <br /> ty Northwest Corner 1 Each <br /> A Southwest Corner 1 Each <br /> a <br /> m Total 4 Each <br /> X <br /> COUNTY OF SAN JOAQUIN No SCALE SUMMARY OF QUANTITIES11 TRACY BOULEVARD RESURFACING Sheet No. <br /> Platti Road to Howard Road 12 of 12 <br /> Drawn By Date Project Engineer Date Checked Date Submitted Date A prow t Recommended Date <br />