My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SP1401 - SP1404
PublicWorks
>
VAULT MAPS
>
Small Plans - SP
>
SP1255 - SP1877
>
SP1401 - SP1404
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2024 3:36:25 PM
Creation date
1/23/2016 12:18:21 AM
Metadata
Fields
Template:
Small Plans - SP
Project
Union Road Resurfacing
Limits
Lathrop Road to French Camp Road
Year
1995
Project Engineer
Jose Zapada
Roads Worked
Union Rd.
Red Lines
No
Supplemental fields
Classification
Improvement Plans
Cross Ref
SP1401 - SP1404
Type
Resurfacing
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Const. <br /> Limits of Clearing and Grubbing <br /> I <br /> I <br /> 4' •4' 12' — 12' 4' <br /> 22' Pavement Renforcing Fabric <br /> Var. Var. <br /> Conform r $%- �8% — Var Conform <br /> �� <br /> Imported I <br /> Borrow (Typ.) Existing Roadway i 0.25' Asphalt Concrete Overlay <br /> TYPICAL SECTION <br /> Sta. 185+80 to Sta. 323+00 <br /> GENERAL NOTES: <br /> D <br /> n <br /> D <br /> C1D <br /> D p <br /> } GEN 1 . All earthwork (except for final grading of the shoulders 4. Asphalt Concrete surfacing shall be placed in 2 layers of <br /> and placement of shoulder backing material) shall be approximately equal thickness. Pavement Reinforcing Fabric <br /> . Limits of Mailbox Relocation completed prior to placing finished course of shall be placed between the layers, <br /> m asphalt concrete. <br /> * Limits of Earthwork (Misc Areas)—See 5. Survey Monument Frames and Covers shall be adjusted <br /> M General Note #1 to finished grade at the following locations: Sta. 264+51t, <br /> Z 2. The Imported Borrow shall be a cohesive type material and Sta. 317+49t. Exact locations to be determined by <br /> D • Gravel Shoulder—See General Note #3 selected for its ability to resist erosion. The the Engineer. <br /> M Resistance (R—Value) and Sand Equivalent <br /> requirement shall be waived. 6. Place Survey Monument Frame and Cover at Sta. 291+07t . <br /> Exact location to be determined by the Engineer. <br /> ry 3. Graveled shoulders shall be constructed by uniformly <br /> D placing shoulder backing material at the rate of 3 tons 7. The contractor shall conduct the A.C. Planing operation <br /> £ per station per side. The completed shoulder shall be in a manner as not to damage the Traffic Signal Loop <br /> • m graded flush with the edge of pavement. Detector at Lathrop Road Intersection. <br /> COUNTY OF SAN JOAQUIN NO SCALE TYPICAL SECTION UNION ROAD RESURFACING Sheetof No. <br /> `ti GENERAL NOTES Lathrop Road to French Camp Road <br /> Drawn By Date Project Engineer Date Checked Date Submitted Date p prataRecommended Date <br /> San Adlong 2/95 kT4 3' ys 1X*4d 'x//31 .g -/K` 47I✓ <br />
The URL can be used to link to this page
Your browser does not support the video tag.