My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SP1405 - SP1410
PublicWorks
>
VAULT MAPS
>
Small Plans - SP
>
SP1255 - SP1877
>
SP1405 - SP1410
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2024 3:36:54 PM
Creation date
1/23/2016 12:18:27 AM
Metadata
Fields
Template:
Small Plans - SP
Project
Escalon-Bellota Road Resurfacing
Limits
Copperopolis Road North 2.0 Miles
Year
1995
Project Engineer
Jose Zapada
Roads Worked
Escalon-Bellota Rd.
Red Lines
No
Supplemental fields
Classification
Improvement Plans
Cross Ref
SP1405 - SP1410
Type
Resurfacing
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Show annotations
View images
View plain text
Const. <br /> 49 Limits of Clearing and Grubbing — a 12' 12' Q� <br /> Li w <br /> 4' A8' 12' 12' A8' 4' <br /> C <br /> C <br /> 22' Pavement Reinforcing Fabric <br /> Conform I Conform <br /> Var. Var. <br /> Imported Borrow 0.25' Asphalt Concrete Overlay <br /> (Typical) Existing Roadway7� <br /> TYPICAL TRAFFIC <br /> LANE LAYOUT <br /> TYPICAL SECTION <br /> Sta. 156+40f to Sta. 261 +70f <br /> M GENERAL NOTES <br /> a <br /> aD <br /> i D <br /> 0 1 . All earthwork (except for final grading of the shoulders 4. Asphalt Concrete surfacing shah be placed in 2 layers of <br /> 0 and placement of shoulder backing material) shall be approximately equal thickness. Pavement Reinforcing Fabric <br /> completed prior to placing finished course of asphalt shall be placed between the layers. Pavement markers may <br /> LEGEND concrete. remain in place. <br /> F_ 2. Gravel shoulders shall be constructed by uniformly 5. Survey Monument Frames and Covers shall be adjusted <br /> o m • Limits of Mailbox Relocation placing shoulder backing material at the rate of 6 tons to finished grade at the following locations: Sta. 158+15.10±, <br /> 0 D per station per side. The completed shoulder shall be Sta. 211 +08.62± and Sta. 237+62.16±. Exact location to be <br /> U' 3 SIE Limits of Earthwork (Mist. Areas)—See graded flush with the edge of pavement. determined by the Engineer. <br /> M <br /> General Note No. 1 <br /> 3. Placement of Asphalt Concrete Leveling or Surfacing <br /> Gravel Shoulder—See General Note No. 3 shall not begin until asphalt concrete used in pavement <br /> ty repair has been in place for 36 hours. <br /> U) A <br /> D <br /> M <br /> .Z) <br /> Z TYPICAL SECTION ESCALON—BELLOTA ROAD RESURFACING Sheet No. <br /> COUNTY OF SAN JOAQUIN NO SCALE GENERAL NOTES (Copperopolis Road to 2.0 Miles North) 2 of 6 <br /> Drawn By Date Protect Engineer Date Checked Date Submitted Date v Recor�nended Date <br />
The URL can be used to link to this page
Your browser does not support the video tag.
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).