Laserfiche WebLink
PAVEMENT REPAIR SHOULDER BACKING ASPHALT CONCRETE (TYPE B) <br /> Location Quantity Location Quantity Location Quantity <br /> 4 Sites Throughout Project 77 S.Y. Sta. 156+40 to Sta. 261 +70 1 ,272 C.Y. Main Roadway 4.648 Tons <br /> Leveling Coarse 1 ,000 Tons <br /> Pavement Repair 26 Tons <br /> PLANING ASPHALT Copperopolis Rd. Intersection (West Leg) 48 Tons <br /> CONCRETE PAVEMENT Copperopolis Rd. Intersection (East leg) 53 Tons <br /> Milton Rd. Intersection 35 Tons <br /> Location Quantity Driveways Type D 32 Tons <br /> Sta. 156+40 to Sta. 156+90 134 S.Y. DRIVEWAYS Driveways Type E 9 Tons <br /> Copperopolis Rd. Intersection (West Leg) 107 S.Y. Total 5,851 Tons <br /> Copperopolis Rd. Intersection (East Leg) 86 S.Y. Quantity <br /> Milton Rd. Intersection 58 S.Y. Type <br /> Sta. 261 +30 to Sto. 261 +70 107 S.Y. No. Area <br /> Total 492 S.Y. D 3 159 S.Y.E 2 87 S.Y. <br /> PAVEMENT REINFORCING FABRIC <br /> Location Quantity <br /> EARTHWORK (MISC. AREAS) <br /> a D <br /> D Sta. 156+90 to Sta. 261 +30 25,520 S.Y. <br /> Location Quantity <br /> Sta. 156+40 to Sto. 261 +70 106 Sta. 1270 REINFORCED DRIVEWAY PIPE <br /> (CLASS IV) <br /> o Z Location Quantity <br /> IMPORTED BORROW <br /> 3 Copperopolis Road Intersection N/E Coner 8 L.F. <br /> M <br /> Sta. 221 +75 Lt. 40 L.F. <br /> Location Quantity Sto. 226+08 Lt. 48 L.F. <br /> tj Sta. 156+40 to Sto. 261 +70 2,160 C.Y. Total 96 L.F. <br /> C/) A <br /> D <br /> M <br /> ;a <br /> COUNTY OF SAN JOAQUIN N❑ SCALE SUMMARY OF QUANTITIES COUNTY ROAD RESURFACING Sheet6of 6 <br /> ° <br /> (Copperopolis s Road to 2.0 Miles North) <br /> Drawn B Dnte Project Engineer Dnte Checked Date Submitted Dnte pr ecommended Date <br /> .. _ <br />