My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SP1443 - SP1449
PublicWorks
>
VAULT MAPS
>
Small Plans - SP
>
SP1255 - SP1877
>
SP1443 - SP1449
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2024 3:46:50 PM
Creation date
1/23/2016 12:19:27 AM
Metadata
Fields
Template:
Small Plans - SP
Project
Taft Park Area Resurfacing
Year
1995
Project Engineer
M. Saqqa
Roads Worked
Mourfield Ave., Clayton Ave., Odell Ave.
Red Lines
No
Supplemental fields
Classification
Improvement Plans
Cross Ref
SP1443 - SP1449
Type
Resurfacing
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Const. <br /> • Limits of Clearing and GrubbingEL GEND <br /> Z' "X" i� "X" Z' Limits of Mailbox Relocation <br /> `Var. "Y" Pavement Reinforcing Fabric *Var. • 0.25' A.C. — Mourfield Ave. <br /> 2'-4' I 2'-4' Sta. 25+00 to Sta. 30+00 <br /> Conform _ Var. Var. _ Conform <br /> Var. far, <br /> • 0.15 A.C. — Mourfield Ave. <br /> Sta. 25+00 to Sta. 30+00 <br /> � 0.08'A.C. (Typ.) <br /> Shoulder <br /> TW�er Backing <br /> Existing Roadway <br /> X0.17' Asphalt Concrete Overlay GENERAL NOTES <br /> * Refer to Cross Sections for deviations in shoulder widths. 1. Asphalt Concrete shall be placed as noted below: <br /> Exact width of shoulder work to be determined by the Engineer. <br /> 0.25' A.C. Thickness — Two (2) layers of <br /> approximate equal thickness with pavement <br /> TYPICAL SECTION <br /> s reinforcing fabric between the layers. <br /> a <br /> a 0.17' A.C. Thickness — One (1) layer with <br /> pavement reinforcing fabric on existing pavement. <br /> 2. Asphalt Concrete used for Pavement Repair shall <br /> be placed in layers which do not exceed 0.50 in <br /> compacted thickness. <br /> ua Street Limits Length "X" "Y" "Z" <br /> D 3. Placement of the first layer of Asphalt Concrete <br /> :�E surfacing shall not begin until Asphalt concrete <br /> A Mourfield Ave. Downing Ave. to Clayton Ave. 1,640'± 11' 20' 1' used in Pavement Repair has been in place for a <br /> minimum of 36 hours. <br /> t m Mourfield Ave. Clayton Ave. to End 1,322'± 10' 18' 0' <br /> LTIZ 4. Water Valve frames and covers shall be adjusted Clayton Ave. Turnpike Rd. to Odell Ave. 1,750'± 11' 20' 1' to grade by California Water Service Company after <br /> zthe resurfacing project is complete. <br /> o Odell Ave. Clayton Ave. to End 1,300'± 10' 18' 0' <br /> 5. Gas valve frames and covers shall be adjusted to <br /> grade by Pacific Gas & Electric Company after <br /> Cn the resurfacing project is complete. <br /> 0 <br /> z <br /> 0 <br /> M COUNTY OF SAN JOAQUIN NO SCALE TYPICAL SECTION TAFT PARK AREA RESURFACING Sheet <br /> ' No <br /> Drawn By Date Project Engineer Date Checked Date / Submitted Date A r ecommended Date <br /> ��95 7l1d�r� lrt7io <br />
The URL can be used to link to this page
Your browser does not support the video tag.