Laserfiche WebLink
ADJUST MANHOLE SHOULDER BACKING <br /> See Note Below FRAMES AND COVERS Location Quantity <br /> Existing Surface Location Quantity Thirteenth Street <br /> Sta. 10+40 to Sta. 11 +10 8 Tons <br /> Eleventh Street <br /> Sta. 13+73t Rt.) 1 Each <br /> Sta. 16+62t Rt. 1 Each <br /> — -- Sta. 20+78t Rt. 1 Each <br /> Sta. 30+15t Lt.) ' Each ASPHALT CONCRETE (Type B) <br /> ro.50 Asphalt Concrete sta. 30+80t Lt. 1 Eacn <br /> 5 Each Location Quantity <br /> Note: Width, length and locations to be Ash Street Eleventh Stregt <br /> determined by the Engineer. Sta. 3+24t (Lt.) 1 Each Roadway 1,112 Tons <br /> Pavement Repair 13 Tons <br /> PAVEMENT REPAIR DETAIL 1 Each <br /> Laurel Stree <br /> Thirteenth Street 1,125 Tons <br /> t <br /> Sta. 13+65f (Rt.) 1 Each Roadway 88 Tons <br /> 1 Each 88 Tons <br /> Ash Street <br /> Total 7 Each Roadway 157 Tons <br /> 157 Tons <br /> Thirteenth Stree <br /> PAVEMENT REPAIRt <br /> a Roadway 475 Tons <br /> j Pavement Repair 20 Tons <br /> r <br /> D Location Quantity <br /> 0 o 495 Tons <br /> Eleventh Street <br /> v 2 Sites 34 S.Y. Total 1,865 Tons <br /> Thirteenth Street <br /> 2 Sites 47 S.Y. <br /> N Total 81 S.Y. <br /> n <br /> m <br /> m <br /> PLANING ASPHALT <br /> m CONCRETE PAVEMENT <br /> V z Location Quantity <br /> Eleventh Street 2,115 S.Y. <br /> Ash Street 174 S.Y. <br /> A Thirteenth Street 205 S.Y. <br /> 0 <br /> 0 Total 2,494 S.Y. <br /> z <br /> O COUNTY OF SAN JOAQUIN NO SCALE CONSTRUCTION DETAILS MORRISON GARDENS sheet No. <br /> AND SUMMARY OF QUANTITIES (Phase 2) 6 ,f 6 <br /> DRAWN BY DATE PROJECT ENGINEER DATE CHECKED DATE SUBMITTED DATE APPROV ECOMMENDEE DATE <br />