My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SP1558 - SP1561
PublicWorks
>
VAULT MAPS
>
Small Plans - SP
>
SP1255 - SP1877
>
SP1558 - SP1561
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/15/2024 9:13:26 AM
Creation date
1/23/2016 12:22:28 AM
Metadata
Fields
Template:
Small Plans - SP
Project
Harney Lane Resurfacing
Limits
Davis Road to Extension Road
Year
1996
Project Engineer
Jose Zapada
Roads Worked
Harney Ln.
Red Lines
Yes
Supplemental fields
Classification
Record Drawings
Cross Ref
SP1558 - SP1561
Type
Resurfacing
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Const. <br /> Limits of Clearing and Grubbing IN <br /> 10' 10' <br /> d a: <br /> ui u; <br /> Var. 10• 10' 4 Var. <br /> V-4' <br /> 18' Pavement Reinforcing Fabric M. <br /> 0 <br /> U <br /> Conform O Exist. onform O Exist. <br /> Top of slope(Typ.) <br /> Top of slope(Typ.) -.OIL Vor, Var. �i V <br /> °moi <br /> L- — — — — — — - - � — - - - - - - - 1 <br /> Existing Roadway 0.30' Asphalt Concrete Overlay TYPICAL TRAFFIC <br /> �TYP J <br /> Omits of Mailbox relocation. TYPICAL SECTION LANE LAYOUT <br /> 33 Sto. 0+50 to Sto. 66+70 <br /> o <br /> [A o GENERAL NOTES <br /> M <br /> 1. Material used for Shoulder Backing shall be 'Selected Materiae 4. Placement of the top layer of Asphalt Concrete shall not begin until <br /> (Top Soil) from Sta. 65+00 to Sta. 66+70(Lt.). the next lower layer has been in place for a minimum of 12 hours. <br /> w <br /> x <br /> rn 2. All earthwork (except for final radio of the shoulders <br /> ra ( P grading ) 5. Place Survey Monument Frames dt Covers at Sta. 26+47.75 (4't Rt.)� Sta. 3y+'71.62 �4 '! Rt.) <br /> shall be completed prior to placing final layer of asphalt <br /> zconcrete. and Sta. 52+95.89 (3't Rt.). Exact location to be determined by - <br /> the Engineer. Refer to S.J.Co. Std. Dwg. No. R-28, for details. Q <br /> 3. Asphalt Concrete shall be placed as noted below: z `tQ� oCe <br /> 0.30' A.C. Thickness - Two (2) layers of approximate equal 6. Pavement Markers shall be removed where Asphalt Concrete <br /> A thickness with pavement reinforcing fabric between the layers. surfacing is less than 0.25' thick. <br /> � <br /> z <br /> HARNEY LANE RESURFACING Sheet No. <br /> COUNTY OF SAN JOAQUIN NO SCALE TYPICAL SECTION (Davis Road to Extension Road) 2 of 4 <br /> DRAWN BY DATE PROJECT ENGINEER TET CHECKED DATE ,, SUBMITTED DATE R OMMENDED DATE <br /> Yo.....d 6. ddc...y 5/96 S-il•�4G c'Z �� y/q�//! (/ <br />
The URL can be used to link to this page
Your browser does not support the video tag.