Laserfiche WebLink
PLANING ASPHALT PAVEMENT REINFORCING <br /> CONCRETE PAVEMENT FABRIC <br /> Location Quantity Location Quantity <br /> Roodwav Sto.21 1 +50 to Sta.267+00 14,800 S.Y. <br /> Sta.1 1 1 +50 to Sto.1 1 1 +75 71 S.Y. <br /> Sto.267+08 to Stc.267+58 200 S.Y. <br /> Intersections <br /> Undine Road 100 S.Y. <br /> Wing Levee Road 78 S.Y. <br /> Total 449 S.Y. METAL BEAM GUARD RAIL <br /> Location Quantity <br /> Bridge No. 29C- 152 <br /> PAVEMENT REPAIR Northeast Corner 25 L.F. <br /> LocationSouthwest Corner 25 L.F. <br /> Quantity <br /> 3 Sites Throughout Project 211 S.Y. Total 50 L.F. <br /> �QFESSIpN <br /> DRIVEWAYS � y M /7,/ <br /> Type Quantity No. 21258 A <br /> No. Area TERMINAL SECTION (TYPE A) E.p 9-30-97 <br /> g E 10 L70 S Y. Location Quantity s9TF CMV ��\P <br /> IOF CALIF <br /> Bridge No. 29C-152 // <br /> sNortheast Corner 1 Each Cyd ✓ I `�`f�'c'„-�'" <br /> D Southwest Corner 1 Each <br /> SHOULDER BACKING total z Each <br /> 3 <br /> c Location Quantity <br /> Sto.1 1 1 +50 to Sta.267+50 3,000 Tons <br /> ;U m <br /> 0 <br /> O D <br /> M ASPHALT CONCRETE (TYPE B) TERMINAL SECTION (TYPE B) <br /> Location Quantity Location Quantity <br /> Roadway 7,431 Tons Bridge No. 29C-152 <br /> Intersections 122 Tons Northeast Corner 1 Each <br /> N A Driveways 21 Tons <br /> mPavement Repair 100 Tons Southwest Corner 1 Each <br /> Total 7,674 Tons Total 2 Each <br /> 410 COUNTY OF SAN JOAQUIN NO SCALE SUMMARY OF QUANTITIES HOWARD ROAD RESURFACING Sheet No. <br /> (Undine Road to Middle River) 6 of 6 <br /> Drawn By Date Project Engineer Dote Checked Dote Submitted //D//ate Recommended Dale <br /> P. h 6/96 3/G bli3/96 / 7il�i� G/ � <br />