My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SP1595 - SP1597
PublicWorks
>
VAULT MAPS
>
Small Plans - SP
>
SP1255 - SP1877
>
SP1595 - SP1597
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/15/2024 9:16:21 AM
Creation date
1/23/2016 12:23:23 AM
Metadata
Fields
Template:
Small Plans - SP
Project
Kennedy Memorial Park Community Center Basketball Court Repair
Year
1996
Project Engineer
Mahmoud Saqqa
Red Lines
Yes
Supplemental fields
Classification
Record Drawings
Cross Ref
SP1595 - SP1597
Type
Basketball Court Repair
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
�- — — -- - - 84.5' <br /> ♦ A <br /> 1 . 7' 7• { GENERAL NOTES <br /> 0.32'_ 0.69 .69' 0.55' 0.27' <br /> - 1. Materials used for Shoulder Backing shall be <br /> "Select Material" (Top Soil). <br /> 2. Asphalt Concrete shall be placed in two layers as noted below. <br /> Bottom layer = 0.00'-0.34' Var. A.C. Leveling <br /> Top layer = 0.10' A.C. Surfacing <br /> I <br /> 3. Place Pavement Reinforcing Fabric between the layers of A.C. <br /> N i <br /> 11.1 1% 1 ' <br /> 83 77 0.35 10.91 <br /> 10.59- 10.'- - - <br /> - - o <br /> i <br /> N <br /> m BENCH MARK: Assume 10.00' Elev. Chiseled <br /> i <br /> Square on top of Conc. curb, <br /> c _. - — - _ -. — - - _.. - <br /> ° � 24.5' S/E portion parkin area near <br /> i n 20'_ 20' 20' utility lite pole No. 1/1751). <br /> 0 <br /> n <br /> o <br /> - - 1 - <br /> 1 10. 7 1 1 <br /> 10.38 10.69 10.69 10.55 10.18 <br /> n ++ <br /> 1 Basketball Court <br /> A - Limits of Clearing and Grubbing <br /> LEGEND 5 ��— Limits of Pavement --�f- 5 <br /> oZT <br /> Limits of Paving 1 58' Pavement Reinforcing Fabric I' <br /> Ohl <br /> Conform <br /> AL Sprinkler Head to be adjusted to grade. �2% 1\27 <br /> A 1 Finish Grade Elevation - ` <br /> 0.27 Existing Pavement Elevation Var. A.C. Leveling <br /> z . .— _ Variable Depth Shoulder Existing AC <br /> — — Pavement Marking Layout Backing (Top Soil) (Typ.) SECTION A—A 0.10' Asphalt Concrete Overlay <br /> COUNTY OF SAN JOAQUIN NO SCALE PLAN KENNEDY MEMORIAL PARK COMMUNITY CENTER Sheet No. <br /> BASKETBALL COURT REPAIR 2 of 3' <br /> DRAWN BY DATE PROJECT ENGINEER DATE CHECKED DATE SUBMITTED DATE APP OVALOMMENDED DATE _ <br /> l <br /> .^` 7/96 c /796 „4Zr�' 779�G <br />
The URL can be used to link to this page
Your browser does not support the video tag.