Laserfiche WebLink
�- — — -- - - 84.5' <br /> ♦ A <br /> 1 . 7' 7• { GENERAL NOTES <br /> 0.32'_ 0.69 .69' 0.55' 0.27' <br /> - 1. Materials used for Shoulder Backing shall be <br /> "Select Material" (Top Soil). <br /> 2. Asphalt Concrete shall be placed in two layers as noted below. <br /> Bottom layer = 0.00'-0.34' Var. A.C. Leveling <br /> Top layer = 0.10' A.C. Surfacing <br /> I <br /> 3. Place Pavement Reinforcing Fabric between the layers of A.C. <br /> N i <br /> 11.1 1% 1 ' <br /> 83 77 0.35 10.91 <br /> 10.59- 10.'- - - <br /> - - o <br /> i <br /> N <br /> m BENCH MARK: Assume 10.00' Elev. Chiseled <br /> i <br /> Square on top of Conc. curb, <br /> c _. - — - _ -. — - - _.. - <br /> ° � 24.5' S/E portion parkin area near <br /> i n 20'_ 20' 20' utility lite pole No. 1/1751). <br /> 0 <br /> n <br /> o <br /> - - 1 - <br /> 1 10. 7 1 1 <br /> 10.38 10.69 10.69 10.55 10.18 <br /> n ++ <br /> 1 Basketball Court <br /> A - Limits of Clearing and Grubbing <br /> LEGEND 5 ��— Limits of Pavement --�f- 5 <br /> oZT <br /> Limits of Paving 1 58' Pavement Reinforcing Fabric I' <br /> Ohl <br /> Conform <br /> AL Sprinkler Head to be adjusted to grade. �2% 1\27 <br /> A 1 Finish Grade Elevation - ` <br /> 0.27 Existing Pavement Elevation Var. A.C. Leveling <br /> z . .— _ Variable Depth Shoulder Existing AC <br /> — — Pavement Marking Layout Backing (Top Soil) (Typ.) SECTION A—A 0.10' Asphalt Concrete Overlay <br /> COUNTY OF SAN JOAQUIN NO SCALE PLAN KENNEDY MEMORIAL PARK COMMUNITY CENTER Sheet No. <br /> BASKETBALL COURT REPAIR 2 of 3' <br /> DRAWN BY DATE PROJECT ENGINEER DATE CHECKED DATE SUBMITTED DATE APP OVALOMMENDED DATE _ <br /> l <br /> .^` 7/96 c /796 „4Zr�' 779�G <br />