My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SP1598 - SP1607
PublicWorks
>
VAULT MAPS
>
Small Plans - SP
>
SP1255 - SP1877
>
SP1598 - SP1607
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/15/2024 9:16:45 AM
Creation date
1/23/2016 12:23:27 AM
Metadata
Fields
Template:
Small Plans - SP
Project
Telegraph Avenue and Kirk Avenue Resurfacing
Year
1996
Project Engineer
Jose Zapada
Roads Worked
Telegraph Ave., Kirk Ave.
Red Lines
Yes
Supplemental fields
Classification
Record Drawings
Cross Ref
SP1598 - SP1607
Type
Resurfacing
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ADJUST FRAMES & COVERS ADJUST FRAME & <br /> MANHOLES COVER (BLOW OFF) PLACE ASPHALT CONCRETE <br /> Location Quantity Location Quantity MISC. AREAS <br /> Kirk avenue SW. 2*03 (17.5' Rt,), 'L Ea. Kirk Avenue <br /> Sta. 1 +62 (4' Rt.) 5ta. b+o0(2'Rt) 1 Each Location Quantity <br /> Sta. 3+21 (4' Rt.) 1 Each I Sta. 12+30 (10't Rt.) 1 Each <br /> Sta. 4+90 (3.5' Rt.) 1 Each Telegraph Avenue (Handicap Ramp) 17 S.Y. <br /> Sta. 8+19 (1' Rt.) 1 Each (6 Locations) <br /> Sta. 8+86 (2' Rt.) 1 Each PAVEMENT REPAIR Kirk Avenue (Handicap Ramp] 34 S.Y. <br /> Sta. 10+5510' Lt. (13 Locations) <br /> ( ) 1 Each Total 51 S.Y. <br /> Sta. 11+60 (1' Lt.) 1 Each <br /> Sta. 12+03 (21 ' Rt.) 1 Each Location Quantity <br /> Total IO.Each Telegraph Avenue (10 Locations) 358 S.Y. <br /> ADJUST FRAMES & GRATES EARTHWORK • PAVEMENT REINFORCING <br /> STORM DRAIN INLETS MISCELLANEOUS AREAS)_ FABRIC <br /> Location Quantity Location Quantity Location Quantity <br /> Telegraph Avenue Kirk Telegraph Avenue <br /> k Avenu <br /> Sta. 10+25 (28' Lt.) 1 Each k A 11 +61 to Sta. 12+35t L.S. Sta. 10+50 to Sto. 26+00 5,856 S.Y. <br /> Kirk Avenue Kirk Avenue <br /> Sta. 4+59 (27' Rt.) 1 Each •Approx. 19 C.Y. of Roadway Excavation & Sta. 1 +00 to Sta. 11 +60 3,769 S.Y. <br /> i Sto. 4+65 (25' Lt.) 1 Each 4 C.Y. of Embankment. Information only)y) Total 9,625 S.Y. <br /> Total 3 Each <br /> > ASPHALT CONCRETE <br /> PLANING ASPHALT TYPE B <br /> CONCRETE PAVEMENT <br /> Location Quantity Location Quantity MINOR CONCRETE <br /> eg Telegraph Avenue CURB, GUTTER & SIDEWALK <br /> o Telegraph Avenue Mainline <br /> f Main Line Sta. 10+13 to Sta.26+38 670 Tons <br /> M Sta. 10+13 to Sta. 26+38 2,888 S.Y. Delano Ave. Intersect. (2 Locations) 20 Tons Location Quantity <br /> Intersection Pavement Repair (10 Locations) 134 Tons Telegraph Ave. (2 Locations) 41 L.F. <br /> Ln Delano Avenue (Lt. & Rt.) 230 S.Y. Leveling 30 Tons Delano Ave. (4 Locations) 89 L.F. <br /> mKirk Avenue Miscellaneous Areas (6 Locations) 6 Tons Kirk Avenue <br /> Main Line Kirk Avenue Sta. 1 +38 to Sta. 1+55 (Lt.) 17 L.F. <br /> o Sta. 0+66 to Sta. 11+61 1,346 S.Y. Mainline Christina Ave. (4 Locations) 86 L.F. <br /> Intersections Sta. 0+13 to Sta.12+35 424 Tons De Ovan Ave. (4 Locations) 78 L.F. <br /> Christina Avenue (Lt. & Rt.) 201 S.Y. (Includes Driveway) Del Rio Ave. (4 Locations) 83 L.F. <br /> A De Ovan Avenue (Lt. & Rt.) 171 S.Y. Intersections (6 Locations) 62 Tons <br /> us Dele Rio Avenue (Lt. & Rt.) 156 S.Y. Misc. Areas (Handicap Ramp) 11 Tons Total 394 L.F. <br /> z Total 4,992 S.Y. (13 Locations) Total 1,357 Tons <br /> COUNTY OF SAN JOA UIN W SME SUMMARY OF QUANTITIES TELEGRAPH , UE D she tila <br /> Q KIRK AVENUE ' G : 14 4f_1� ^_ . <br /> DRAWN BY DATE PROJECT ENGINEER DATECHECKED DATE SUBMITTED DATE APP Ov RECOMMENDED H7E.44.+,y 7/96 01/1 y, ti %I /l� <br /> r <br />
The URL can be used to link to this page
Your browser does not support the video tag.