My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SP1613 - SP1618
PublicWorks
>
VAULT MAPS
>
Small Plans - SP
>
SP1255 - SP1877
>
SP1613 - SP1618
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/15/2024 9:17:47 AM
Creation date
1/23/2016 12:23:55 AM
Metadata
Fields
Template:
Small Plans - SP
Project
Ashley Lane Resurfacing
Limits
N. 99 Frontage Road to Hildreth Lane
Year
1996
Project Engineer
Jose Zapada
Roads Worked
Ashley Ln.
Red Lines
No
Supplemental fields
Classification
Improvement Plans
Cross Ref
SP1613 - SP1618
Type
Resurfacing
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ADJUST MANHOLE PLANING ASPHALT DRIVEWAYS <br /> FRAME AND COVER CONCRETE PAVEMENT <br /> Location Quantity Location Quantity Type No QUantlArea <br /> Sta. 38+68 (16' Lt.) 1 Each Main Line D 34 930 S.Y. <br /> Sta. 5+00 to Sta. 5+25 124 S.Y. E 26 742 S.Y. <br /> Sta. 50+51 to Sto. 50+61 27 S.Y. F 2 43 S.Y. <br /> Sta. 83+35 to Sta. 83+60 67 S.Y. <br /> Intersections <br /> ADJUST WATER VALVE (12 Locations) 739 S.Y. <br /> FRAMES AND COVERS Total 957 S.Y. <br /> Location Quantity <br /> Sta. 14+84 (14' Rt.) 1 Each <br /> Sta. 15+04 (15' Rt.) 1 Each ASPHALT CONCRETE <br /> Sta. 16+71 (15' Rt.) 1 Each (TYPE B <br /> Sta. 19+43 (15' Rt.) 1 Each SHOULDER BACKING <br /> Sta. 19+51 (13' Rt.) 1 Each Location Quantity <br /> Sta. 22+35 (16' Rt.) 1 Each Location Quantity <br /> Mainline <br /> Total 6 Each Sta. 5+00 to Sta. 83+60 3,630 Tons <br /> Sto. 5+00 to Sta. 83+60 1 ,016 C.Y. <br /> Pavement Repair 24 Tons <br /> i Intersections <br /> 9 (12 Locations) 203 Tons <br /> D ADJUST SURVEY MONUMENT Driveways (Types D. E & F288 Tons <br /> g FRAME & COVER Total 4,145 To <br /> Location Quantity CLEARING AND GRUBBING <br /> Sta. 15+00 (21' Rt.) 1 Each Location Quantity <br /> 1 f Sta. 5+00 to Sta. 83+60 L.S. <br /> m <br /> PAVEMENT REINFORCING <br /> m PAVEMENT REPAIR FABRIC <br /> m <br /> Location Quantity FINISHING ROADWAY Location Quantity <br /> Sto. 50+22t to Sta. 50+32t 27 S.Y. Sta. 5+50 to Sta. 50+21 10,929 S.Y. <br /> z Sta. 50+41t to Sta. 50+51t 27 S.Y. Location Quantity Sta. 50+41 to Sta. 83+10 7,991 S.Y. <br /> 0 Total 54 S.Y. Sta. 5+00 to Sta. 83+60 L.S. Total 18,920 S.Y. <br /> 0 <br /> z <br /> gQ NO SCALE SUMMARY OF QUANTITIES ASHLEY LANE RESURFACING Sheet No. <br /> m COUNTY OF SAN JOA UIN N. 99 Frontage Road to Hildreth Lane 6 of 6 <br /> DRAWN BY DATE PROJECT ENGINEER DATE CHECKED DATE SUBMITTED DATE /APPROVAL RECOMMENDED DATE <br /> yo...,..[ S. .Ad...y 10/96 /��is yb <br />
The URL can be used to link to this page
Your browser does not support the video tag.