Laserfiche WebLink
ADJUST MANHOLE PLANING ASPHALT ASPHALT CONCRETE <br /> FRAMES AND COVERS CONCRETE PAVEMENT TYPE 6 <br /> Location Quantity Location Quantity Location Quantity <br /> Bieghle Street Bieghle Street Bieghle Street <br /> Sta. 2+52 (Rt.) 1 Each Sta. 14+89 to Sta. 14+99 66 S.Y. Roadway 481 Tons <br /> Sta. 7+57 (Rt.) 1 Each Intersections Intersections 71 Tons <br /> Subtotal 2 Each Clover Lane 94 S.Y. Driveways 14 Tons <br /> Tenth Street Ninth Street 94 S.Y. Pavement Repair 25 Tons <br /> Sta. 4+56 (Rt.) 1 Each Tenth Street 31 S.Y. Miscellaneous Areas 2 Tons <br /> Sta. 8+39 (Rt.) 1 Each Eleventh Street 94 S.Y. Subtotal 593 Tons <br /> Sta. 13+93 (Rt.) 1 Each Miscellaneous Areas Tenth Street <br /> Sto. 20+10 (Rt.) 1 Each Tenth Street 8 S.Y. Bieghle St. to B St. 399 Tons <br /> Subtotal 4 Each Eight Street 2 S.Y. B St. to D St. 385 Tons <br /> Total 6 Each Subtotal 389 S.Y. <br /> Pavement Repair 17 Tons <br /> Tenth Street Subtotal 801 Tons <br /> Sta. 11 +16 to Sta. 11+41 103 S.Y. Total 1,394 Tons <br /> Sta. 12+15 to Sta. 12+40 85 S.Y. <br /> Sta. 22+73 to Sto. 22+98 153 S.Y. <br /> ADJUST LAMPHOLE Subtotal 341 S.Y. <br /> FRAMES AND COVERS Total 730 S.Y. PLACE ASPHALT CONCRETE <br /> ffi Location Quantity MISCELLANEOUS AREAS <br /> Tenth Street <br /> Sta. 1 +03 (Rt.) 1 Each Location Quantity <br /> 6 Sta. 1 +97 (Rt.) 1 Each Bieghle Street <br /> Sta. 22+15 (Rt.) 1 Each SHOULDER BACKING Tenth Street <br /> gS.W. and N.W. Corner 23 S.Y. <br /> Total 3 Each Location <br /> Quantity Eighth Street <br /> Sta. 0-27 to Sta. 14+99 68 Tons S.W. Comer 4 S.Y. <br /> z Total 27 S.Y. <br /> PAVEMENT REPAIR <br /> rn Location Quantity <br /> DRIVEWAYS <br /> o Bieghle Street <br /> 5 Sites 66 S.Y. Bieghle Street Quantity <br /> Tenth Street <br /> Type NO. Area <br /> 19 Sites 45 S.Y. p 3 29 S.Y. <br /> 1.3 Total 111 S.Y. <br /> 0 <br /> I E 6 88 S.Y. <br /> z <br /> COUNTY OF SAN JOAQUIN Ho MALE SUMMARY OF QUANTITIES MORRISON GARDENS RESURFACING sheet No. <br /> (PHASE 3) 7 of 7 <br /> DRAWN BY DATE I PROJECT ENGINEER I DATE CHECKED DATE SUBMITTED DATE APPROVAL RECOMMENDED DATE <br /> Y..d a. 'fd" r I a/97 .4 VJ,,4/fl 4,1C 2e" zl,rl_ .d A/_ �Li __ <br />