My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SP1667 - SP1670
PublicWorks
>
VAULT MAPS
>
Small Plans - SP
>
SP1255 - SP1877
>
SP1667 - SP1670
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/15/2024 9:23:53 AM
Creation date
1/23/2016 12:25:05 AM
Metadata
Fields
Template:
Small Plans - SP
Project
Foppiano Lane Resurfacing
Limits
Ashley Lane to Alpine Road
Year
1997
Project Engineer
Jose Zapada
Roads Worked
Foppiano Ln.
Red Lines
No
Supplemental fields
Classification
Improvement Plans
Cross Ref
SP1667 - SP1670
Type
Resurfacing
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Const. <br /> Limits of Cleari Ig and Grubbing, <br /> Earthwork Miscellaneous Areas <br /> Conform 20' Pavement Reinforcing Fabric — Conform <br /> I 8% <br /> Var. <br /> v'� Or. <br /> Existing Roadwoy <br /> Imported Borrow or excess material 0.25' Asphalt Concrete Overlay Imported Borrow or excess material <br /> from shoulder excavation. from shoulder excavation. <br /> 0.25'± Shoulder Backing <br /> •Limits of Mailbox Relocation TYPICAL SECTION 0.25' Shoulder Backing <br /> * 2' Sta. 149+50 to Sta. 154+68 Lt. Sto. 101 +50± to Sta. 154+68 <br /> � I <br /> GENERAL NOTES <br /> s 1 . All earthwork (except for placement of Shoulder Backing) Const. <br /> 0 <br /> o shall be completed prior to placing final layer of asphalt <br /> concrete. <br /> 0 2. Placement of the top layers of Asphalt Concrete shall not <br /> begin until the next lower layer has been in place for a »• »• <br /> t o minimum of 12 hours. <br /> �I' A <br /> 3. Imported Borrow shall be a cohesive material selected <br /> for its ability to withstand erosion. R—Volue and sand <br /> equivalent requirements shall be waived for this material. Edge of Pavemen <br /> v <br /> m 4. Asphalt Concrete shall be placed as noted below: <br /> z <br /> 0.25' A.C. Thickness — Two (2) layers of approximate equal <br /> thickness with pavement reinforcing fabric between the layers. <br /> Direction of %V61 <br /> 5. The existing earth berm at the Northwest corner of Alpine Road <br /> m and Foppiono Lane shall remain in place. TYPICAL TRAFFIC <br /> 5 <br /> 0 6. All existing fences and shrubs are to remain in place. <br /> z LANE LAYOUT <br /> COUNTY OF SAN JOAQUIN TYPICAL SECTION SHOW FOPPIANO LANE RESURFACINGTSheeft Na. <br /> (Ashley Lane to Aline Road) 4 <br /> DRAWN BY DATE PROJECT ENGINEER DATE CHECKED DATE SUBMITTED DATE APP 0 AL MENDED DATE <br />
The URL can be used to link to this page
Your browser does not support the video tag.