Laserfiche WebLink
4 spaces @ <br /> 3'-1 �6" O.C. <br /> Terminal Section 6"X8"Post <br /> Type "C" (Detail A) — 6"X8"Posts 6 spaces <br /> 3 spaces <br /> . <br /> S.P. A77H & blocks @ 3'-1 '6- O.C. @ 6'-3" O.0 <br /> (Typ. 4 loc.) " R&D Existing MBGR and Posts. <br /> �- 10"x10Posts 10"x10"Posts <br /> & 8"x8"Blocks & 8"x8"Blocks 6"X8"Posts & blocks <br /> rl <br /> 6,-3„ <br /> 2' Offset Typ. 4' Offset <br /> - - - - - — — — — — — — — — <br /> S.P. A77A, Transition Transition <br /> A77B,A77C R.S.P. A78C <br /> 12'6" Place 50' Single Thrie Beam Barrier 37'6" MBGR <br /> MBGR Place W6X15, Steel Posts on <br /> existing bolts. (S.P. A78A, A78B) <br /> RAIL LAYOUT WEST SIDE OF BRIDGE z <br /> 12' 6" Place 50' Single Thrie Beam Barrier 12'6" <br /> MBGR Place W6X15, Steel Posts on MBGR <br /> 6'-3" existing bolts. (S.P. A78A, A78B) <br /> Transition R&D Existing MBGR 6'-3" <br /> — Transition <br /> 3. D — <br /> W6X15, Steel Post 2' Offset <br /> 1 „ T �f 6Typ 2 t <br /> 6"X8"Posts 10"x10"Posts I 10%10'Posts 6"X8"Posts <br /> Finished & blocks & 8"x8"Blocks & 8"x8"Bloc <br /> > I grade o 3 1 „ 3 spaces 4 spaces @ & blocks <br /> n co <br /> N 3 _1 ^ / e X t /a Slotted 3'_1 1h O.C. <br /> I %"Bolts holes. (Typ.) 3'-1 O.C. <br /> _ N 1 2T per post) N <br /> _ -L i` Slotted holes far existing RAIL LAYOUT EAST SIDE OF BRIDGE <br /> 0 � _ '� n o 1 1/4 bolts (Typ. 2 per post) <br /> "Bolts <br /> Z (2 per post) I I 3 .. Slotted holes for existing Note: <br /> 1 /a 3/a bolts (Typ. 2 per post <br /> Existing Bridge Deck 13/4" ) Attention is directed to existing Pacific Bell telephone conduit attached to the west side of the <br /> Existing Bolts to bridge. Seven (7) calendar days prior to beginning work on the bridge, the Contractor shall <br /> A remain in place. notify Lori Wagner of Pacific Bell @ (209) 474-4130. <br /> L The Contractor shall coordinate removal of existing railing and installation of the Thrie Beam <br /> STEEL POST DETAI <br /> z Barrier with Pacific Bell crews who will remove and reinstall their conduit. <br /> ( A78A, A78B, A78C) <br /> COUNTY OF SAN JOAQUIN NO SCALE BRIDGE RAILING DETAILS MICKE GROVE ROAD RESURFACING sheetNo. <br /> m (Eight Mile Road to Armstrong Road) 6 of 7 <br /> DRAWN BY DATE PROJECT ENGINEER DATE CHECKED DATE SUBMITTED DATE APPRQVA COMMENDED D E <br /> E. M. Peterson 1/98 <br />