My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SP1701 - SP1707
PublicWorks
>
VAULT MAPS
>
Small Plans - SP
>
SP1255 - SP1877
>
SP1701 - SP1707
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/15/2024 9:26:08 AM
Creation date
1/23/2016 12:25:48 AM
Metadata
Fields
Template:
Small Plans - SP
Project
Micke Grove Road Resurfacing
Limits
Eight Mile Road to Armstrong Road
Year
1998
Project Engineer
Jose Zapada
Roads Worked
Micke Rd.
Red Lines
No
Supplemental fields
Classification
Improvement Plans
Cross Ref
SP1701 - SP1707
Type
Resurfacing
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
4 spaces @ <br /> 3'-1 �6" O.C. <br /> Terminal Section 6"X8"Post <br /> Type "C" (Detail A) — 6"X8"Posts 6 spaces <br /> 3 spaces <br /> . <br /> S.P. A77H & blocks @ 3'-1 '6- O.C. @ 6'-3" O.0 <br /> (Typ. 4 loc.) " R&D Existing MBGR and Posts. <br /> �- 10"x10Posts 10"x10"Posts <br /> & 8"x8"Blocks & 8"x8"Blocks 6"X8"Posts & blocks <br /> rl <br /> 6,-3„ <br /> 2' Offset Typ. 4' Offset <br /> - - - - - — — — — — — — — — <br /> S.P. A77A, Transition Transition <br /> A77B,A77C R.S.P. A78C <br /> 12'6" Place 50' Single Thrie Beam Barrier 37'6" MBGR <br /> MBGR Place W6X15, Steel Posts on <br /> existing bolts. (S.P. A78A, A78B) <br /> RAIL LAYOUT WEST SIDE OF BRIDGE z <br /> 12' 6" Place 50' Single Thrie Beam Barrier 12'6" <br /> MBGR Place W6X15, Steel Posts on MBGR <br /> 6'-3" existing bolts. (S.P. A78A, A78B) <br /> Transition R&D Existing MBGR 6'-3" <br /> — Transition <br /> 3. D — <br /> W6X15, Steel Post 2' Offset <br /> 1 „ T �f 6Typ 2 t <br /> 6"X8"Posts 10"x10"Posts I 10%10'Posts 6"X8"Posts <br /> Finished & blocks & 8"x8"Blocks & 8"x8"Bloc <br /> > I grade o 3 1 „ 3 spaces 4 spaces @ & blocks <br /> n co <br /> N 3 _1 ^ / e X t /a Slotted 3'_1 1h O.C. <br /> I %"Bolts holes. (Typ.) 3'-1 O.C. <br /> _ N 1 2T per post) N <br /> _ -L i` Slotted holes far existing RAIL LAYOUT EAST SIDE OF BRIDGE <br /> 0 � _ '� n o 1 1/4 bolts (Typ. 2 per post) <br /> "Bolts <br /> Z (2 per post) I I 3 .. Slotted holes for existing Note: <br /> 1 /a 3/a bolts (Typ. 2 per post <br /> Existing Bridge Deck 13/4" ) Attention is directed to existing Pacific Bell telephone conduit attached to the west side of the <br /> Existing Bolts to bridge. Seven (7) calendar days prior to beginning work on the bridge, the Contractor shall <br /> A remain in place. notify Lori Wagner of Pacific Bell @ (209) 474-4130. <br /> L The Contractor shall coordinate removal of existing railing and installation of the Thrie Beam <br /> STEEL POST DETAI <br /> z Barrier with Pacific Bell crews who will remove and reinstall their conduit. <br /> ( A78A, A78B, A78C) <br /> COUNTY OF SAN JOAQUIN NO SCALE BRIDGE RAILING DETAILS MICKE GROVE ROAD RESURFACING sheetNo. <br /> m (Eight Mile Road to Armstrong Road) 6 of 7 <br /> DRAWN BY DATE PROJECT ENGINEER DATE CHECKED DATE SUBMITTED DATE APPRQVA COMMENDED D E <br /> E. M. Peterson 1/98 <br />
The URL can be used to link to this page
Your browser does not support the video tag.