Laserfiche WebLink
rt Const. <br /> IConst. <br /> Limits of Clearing and Grubbing, Barrier 11'±(Typ ) <br /> Earthwork (Miscellaneous Areas) Rail <br /> Wished Surface I <br /> I' <br /> Conform Conform Var. <br /> I I <br /> _8% 8%, rL_ _ <br /> `Var Var , 0.12' A.C. <br /> Existing Bridge Deck <br /> ,Jof- \ TYPICAL SECTION ® BRIDGE <br /> (Sta. 1 +08 to Sta. 1 +40) <br /> Existing Roadway <br /> Native soil from ❑1 2' Sta. 28+00 to Sta. 37+00 (Lt) <br /> Native soil from * 0.25' Asphalt Concrete Overlay shoulder excavation 2' Sta. 53+80 to Sta. 54+30 (Lt) <br /> shoulder excavation areas. 2' Sta. 41 +75 to Sta. 43+25 (Rt) <br /> areas. <br /> 0.25'± Shoulder Backing TYPICAL SECTION <br /> 0.25'± Shoulder Backing 2' Sta. 53+80 to Sta. 54+30 Rt <br /> Efl 2' Sta. 14+00 to Sta. 27+00 (Rt) <br /> 0.12' A.C.— Sta. 0+66 to Sta. 1+40 Sta. 0+16 to Sta. 134+11 ± 2' Sta. 63+00 to Sta. 68+00 (Rt) <br /> •Limits of Mailbox Relocation 2' Sta. 102+00 to Sta. 118+00 (Lt) <br /> 6 Clearing and Grubbing limits shall be 2' Sta. 111 +00 to Sta. 113+00 (Rt) <br /> reduced at landscaped frontages as noted: 2' Sta. 129+00 to Sta. 134+11 (Lt) <br /> a Sta. 41 +70 to Sto. 43+25 (Rt .= 2' #rom E.P. <br /> a Sta. 118+85 to Sta. 119+25(Rt).= <br /> from E.P. <br /> o <br /> a <br /> .o' <br /> a <br /> v GENERAL NOTES <br /> 1 . The Contractor shall obtain an Encroachment Permit from 3. Survey monument frame and cover shall be adjusted to <br /> Caltrans for work within the State Route 120 Right—of—Way. grade at Sta. 0+56. <br /> = 4. Place Survey Monument Frames and Covers at the following <br /> m 2. All earthwork (except for final grading of shoulders) locations: Sta. 27+33±, Sta. 80+67± and Sta. 107+37±. <br /> shall be completed prior to placing final layer of asphalt Exact Locations to be determined by the Engineer. <br /> q%ft z concrete. <br /> 0 <br /> rn <br /> w <br /> 0 <br /> z <br /> SCALE AS SHOWN TYPICAL SECTION WAGNER ROAD RESURFACING Sheet No. <br /> COUNTY O F SAN J OAQ U I N River Road O State Route C IN 2 of 5 <br /> DRAWN BY DATE PROJECT ENGINEER DATE CHECKED DATE SU/BMiTTED .D/ATE APPROV RECOMMENDED DATE <br /> E. M. Peterson 3/98 3/12I!$ �/!l9 <br />