My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SP1738 - SP1743
PublicWorks
>
VAULT MAPS
>
Small Plans - SP
>
SP1255 - SP1877
>
SP1738 - SP1743
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/15/2024 9:28:26 AM
Creation date
1/23/2016 12:26:37 AM
Metadata
Fields
Template:
Small Plans - SP
Project
Thornton Road Resurfacing
Limits
Walnut Grove Road to Sacramento County
Year
1998
Project Engineer
Jose Zapada
Roads Worked
Thornton Rd.
Red Lines
Yes
Supplemental fields
Classification
Record Drawings
Cross Ref
SP1738 - SP1743
Type
Resurfacing
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Const. GENERAL NOTES <br /> Limits of Clearing and Grubbing 1 . All earthwork (including shoulder backing, <br /> -_-�� except for final grading of the shoulders) shall <br /> be completed prior to placing final layer of <br /> q 12' 12' •q asphalt concrete. <br /> 2. Imported borrow shall be a cohesive soil selected <br /> for its ability to resist erosion. R-Value and Sand <br /> 7-22' Pavement Reinforcing Fabric Equivalent requirements shall be waived for Import <br /> Borrow. <br /> Conform- ,Var. Var. Conform 3. Asphalt Concrete shall be placed as noted below: <br /> Vor. — Vara 0.35' A.C. Thickness - Three (3) layers of <br /> approximately equal thickness with pavement <br /> reinforcing fabric between the top and second <br /> / layer. <br /> L Variable Depth 0.25' A.C. Thickness - Two (2) layers of <br /> Existing Roadways * Shld. Backing approximately equal thickness with pavement <br /> reinforcing fabric between the layers. <br /> * 0.25' A.C. Overlay <br /> 0.35' A.C. - Sta. 103+50 to Sta. 109+50 4. Placement of Asphalt Concrete surfacing shall not <br /> begin until asphalt concrete used in pavement <br /> 2' - Sta. 0+40 to Sta. 21 +00 (Rt) <br /> Sta. 0+40 to 110+06 repair hos been in place o minimum of 36 hours. <br /> • Limits of Mailbox Relocation 5. Frames and covers of Water Valves and Survey <br /> Monuments shall be adjusted to finished grade. <br /> Refer to Improvement Standard No. CW-R36 for <br /> e Limits of Clearing and Grubbing, _Earthwork (Misc. Areas) details. <br /> 6 6. Maintenance Hole and Gas Valve frames and covers <br /> _ shall be adjusted to finished grade by others <br /> 23' 14' �I► 16' after completion of the resurfacing project. The <br /> s o Min. ♦ 2' contractor shall clearly mark their locations. <br /> 12'�{�3' —3' Min. 7. The existing pipe downdrains ® Sta. 111 +35 Rt. and <br /> 30' Pavement Reinforcing Fabric Sta. 113+88 Rt. shall remain and shall be <br /> 8 I incorporated into the new A.C. Dike. <br /> i <br /> _ 5% I <br /> Vora Place A.C. Dike <br /> a Conform N. �•�I� <br /> °J Var <br /> ImportedLn <br /> borrow (Typ.) <br /> 0.25' A.C. Overlay Existing Roadway :i °+. <br /> o \\ Conform <br /> Line Cut Existing Pavement 0.30' A.C. <br /> A Shoulder width to be increased <br /> < at Guard Roil Flairs. See Railing Sta, 110+06 t0 118+06 <br /> '^ Layout, Sheet No. 5. <br /> 0 <br /> z <br /> NO 9CME TYPICAL SECTION THORNTON ROAD RESURFACING Sheet No. <br /> M <br /> COUNTY OF SAN J OAQ U I N (Walnut Grove Road to Sacramento County) 2 of 6 <br /> DRAWN BY I DATE I PROJECT ENGINEER I DATE I CHECKED I DATE SUBMITTED DATE APP OVA COMMENDED I 0ATE <br />
The URL can be used to link to this page
Your browser does not support the video tag.